CONSTRUCTION OUTLOOK 2011<br />The Associated General Contractors of America<br />March 10, 2011<br />PRESENTED BY<br />S....
OCCM MISSION STATEMENT<br /> To create and maintain court buildings that reflect the highest standards of excellence.<br />
PROGRAM HISTORY<br />2001 – Task Force on Court Facilities<br />2002 – Trial Court Facilities Act (Senate Bill 1732)<br />...
TRIAL COURT FACILITIES ACT OF 2002 SB 1732 PROGRAM SCOPE<br />Court Projects: 15<br />Courtrooms: 1 to 36<br />Size: 6,500...
SB 1407 PROGRAM SCOPE<br />Court Projects: 41<br />Courtrooms: 1 to 71<br />Sizes: 15,000 to 704,000 BGSF<br />Project Cos...
CAPITAL PROJECT DELIVERY PROCESS<br />Site Selection and Acquisition Phase<br />Preliminary Plans Phase<br />Working Drawi...
SITE ACQUISITION PHASE<br />Site selection and acquisition<br />Develop site selection criteria based on policy and local ...
SITE ACQUISITION PHASE<br />Selection of Architectural & Engineering Firms<br />Develop RFQ, interview and select A&E firm...
PRELIMINARY PLAN PHASE<br />Schematic Design<br />Design Development<br />DOF recommends approval of Preliminary Plans<br ...
WORKING DRAWINGS PHASE<br />A&E team prepares Contract Documents<br />Drawings and Specifications<br />Cost Estimating<br ...
BIDDING <br />Construction Manager solicits bids from qualified subcontractors<br />Multiple bids for every trade; approx....
OTHER DELIVERY METHODS<br />Other delivery methods<br />Design-Bid-Build<br />Design-Assist<br />Prequalification Short-Li...
CONSTRUCTION PHASE<br />Construction of building and site features<br />Furniture installation <br />Quality Assurance<br ...
OCCUPANCY<br />Court responsible for telephone and data equipment and servers<br />Court responsible for staff move-in<br ...
TYPICAL PROJECT SCHEDULE<br />
SB 1732 PROJECTS<br />
Fourth District Court of AppealSanta Ana<br />Status:  Complete<br />Construction Cost: $28M<br />Architect:  Carrier-John...
New Portola Loyalton Courthouse <br />Superior Court of Plumas & Sierra CountiesCross Jurisdiction Branch Court <br />Stat...
New Richard E. Arnason Justice Center<br />Superior Court of Contra Costa County<br />Status:  Complete<br />Construction ...
New Mammoth Lakes Courthouse<br />Superior Court of Mono County<br />Status:  Under Construction<br />Construction Cost: $...
New Susanville Courthouse <br />Superior Court of Lassen County<br />Status:  Under Construction<br />Construction Cost: $...
New Hollister Courthouse<br />Superior Court of San Benito County<br />Status: Under Construction<br />Construction Cost: ...
New San Andreas Courthouse<br />Superior Court of Calaveras County<br />Status: Working Drawings Phase<br />Construction C...
New San Bernardino Courthouse<br />Superior Court of San Bernardino County<br />Status: Working Drawings Phase<br />Estima...
New Long Beach Courthouse<br />Superior Court of Los Angeles County<br />Status: In Design<br />Contractor: Long Beach Jud...
Master Schedule<br />
California Administrative Office of the Courts<br />
2011 PROJECTS IN BANCRO<br />
2011 PROJECTS IN NCRO (1)<br />
2011 PROJECTS IN NCRO (2)<br />
2011 CM@R PROJECTS IN SRO<br />
SRO PROJECTS ANTICIPATED BID<br />
2011 SELECTION OF CM AGENCY CA SUPPORT<br />
INFORMATION<br />Project details will be published with each solicitation.  Please monitor the California Courts website f...
QUESTIONS?<br />
Upcoming SlideShare
Loading in …5
×

Construction Outlook 2011 - Ernie Swickard (Office of Court Construction Mgmt)

1,340 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,340
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
15
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Construction Outlook 2011 - Ernie Swickard (Office of Court Construction Mgmt)

  1. 1. CONSTRUCTION OUTLOOK 2011<br />The Associated General Contractors of America<br />March 10, 2011<br />PRESENTED BY<br />S. Ernest Swickard, AIA, Assistant Division Director<br />ADMINISTRATIVE OFFICE OF THE COURTS<br />OFFICE OF COURT CONSTRUCTION AND MANAGEMENT<br />
  2. 2. OCCM MISSION STATEMENT<br /> To create and maintain court buildings that reflect the highest standards of excellence.<br />
  3. 3. PROGRAM HISTORY<br />2001 – Task Force on Court Facilities<br />2002 – Trial Court Facilities Act (Senate Bill 1732)<br />2003 – Court Facilities Master Plans<br />2004 – First Transfer<br />2005 – First 5-year Plan; 2 Capital Projects Funded<br />2006 – Senate Bill 10; 4 Capital Projects Funded<br />2007 – 9 Capital Projects Funded<br />2008 – Senate Bill 1407; 41 Projects Approved<br />2009 – Transfer of all Court Facilities from Counties<br />2010 – Approval to Proceed with all 41 SB 1407 Projects<br />
  4. 4. TRIAL COURT FACILITIES ACT OF 2002 SB 1732 PROGRAM SCOPE<br />Court Projects: 15<br />Courtrooms: 1 to 36<br />Size: 6,500 to 356,000 BGSF<br />Project Cost:* $6.5M to $340M<br /> Estimated Total: $1.5B<br />*Total Project Cost (Construction + Soft Costs)<br />
  5. 5. SB 1407 PROGRAM SCOPE<br />Court Projects: 41<br />Courtrooms: 1 to 71<br />Sizes: 15,000 to 704,000 BGSF<br />Project Costs:* $3M to $634M<br />Estimated Total: $5.0B<br />*Total Project Cost (Construction + Soft Costs)<br />
  6. 6. CAPITAL PROJECT DELIVERY PROCESS<br />Site Selection and Acquisition Phase<br />Preliminary Plans Phase<br />Working Drawings Phase<br />Bidding<br />Construction Phase<br />Occupancy<br />
  7. 7. SITE ACQUISITION PHASE<br />Site selection and acquisition<br />Develop site selection criteria based on policy and local needs <br />Develop consensus on preferred and alternate sites<br /> Perform site investigation, due diligence and appraisals<br />CEQA studies and reports<br />SPWB approvals<br />
  8. 8. SITE ACQUISITION PHASE<br />Selection of Architectural & Engineering Firms<br />Develop RFQ, interview and select A&E firm with court’s participation<br />AOC contracts with A&E firm<br />Programming Validation<br />Detailed space program<br />Space flow/relational diagrams<br />Confirm program budget<br />
  9. 9. PRELIMINARY PLAN PHASE<br />Schematic Design<br />Design Development<br />DOF recommends approval of Preliminary Plans<br />SPWB approval to proceed to Working Drawings<br />Cost Estimating<br />Select Construction & Commissioning Team<br />Design-Bid-Build with Construction Management Agency<br />Construction Manager at Risk (CM@R)<br />Commissioning Authority<br />
  10. 10. WORKING DRAWINGS PHASE<br />A&E team prepares Contract Documents<br />Drawings and Specifications<br />Cost Estimating<br />Review and Approvals<br />State Fire Marshal<br />Division of the State Architect (Access Compliance)<br />Corrections Standards Authority <br />DOF approval to bid<br />
  11. 11. BIDDING <br />Construction Manager solicits bids from qualified subcontractors<br />Multiple bids for every trade; approx. 50 trades<br />Bids reviewed by CM@R and OCCM D&C<br />Guaranteed Maximum Price (GMax)<br />CM@R contracts with subcontractors<br />DOF approves final bid/GMax and authorizes Construction Phase.<br />
  12. 12. OTHER DELIVERY METHODS<br />Other delivery methods<br />Design-Bid-Build<br />Design-Assist<br />Prequalification Short-List<br />IDIQ General Contractor<br />Local Outreach<br />
  13. 13. CONSTRUCTION PHASE<br />Construction of building and site features<br />Furniture installation <br />Quality Assurance<br />Inspections<br />Site visits by A&E and AOC OCCM Team<br />Commissioning of building systems<br />
  14. 14. OCCUPANCY<br />Court responsible for telephone and data equipment and servers<br />Court responsible for staff move-in<br />AOC post occupancy evaluation<br />Survey building users<br />Lessons learned<br />LEED “Silver” certification by the United States Green Building Council<br />
  15. 15. TYPICAL PROJECT SCHEDULE<br />
  16. 16. SB 1732 PROJECTS<br />
  17. 17. Fourth District Court of AppealSanta Ana<br />Status: Complete<br />Construction Cost: $28M<br />Architect: Carrier-Johnson<br />Contractor: JCM Heery (CM@Risk)<br />
  18. 18. New Portola Loyalton Courthouse <br />Superior Court of Plumas & Sierra CountiesCross Jurisdiction Branch Court <br />Status: Complete<br />Construction Cost: $5.5M<br />Architect: Nacht & Lewis<br />Contractor: S.W. Allen (Design-Bid-Build)<br />
  19. 19. New Richard E. Arnason Justice Center<br />Superior Court of Contra Costa County<br />Status: Complete<br />Construction Cost: $41M<br />Architect: HOK<br />Contractor: Sundt Construction Co. (CM@Risk)<br />
  20. 20. New Mammoth Lakes Courthouse<br />Superior Court of Mono County<br />Status: Under Construction<br />Construction Cost: $18.5M<br />Architect: Cavagnero Associates<br />Contractor: Sundt Construction (CM@Risk)<br />
  21. 21. New Susanville Courthouse <br />Superior Court of Lassen County<br />Status: Under Construction<br />Construction Cost: $34M<br />Architect: LDBG Design Group<br />Contractor: Clark & Sullivan (Design-Bid-Build) <br />
  22. 22. New Hollister Courthouse<br />Superior Court of San Benito County<br />Status: Under Construction<br />Construction Cost: $34M <br />Architect: SmithGroup<br />Contractor: Kitchell(CM@Risk)<br />
  23. 23. New San Andreas Courthouse<br />Superior Court of Calaveras County<br />Status: Working Drawings Phase<br />Construction Cost: $40M <br />Architect: DLR<br />CM Agency: URS Corp America<br />Contractor: TBD (Design-Bid-Build)<br />
  24. 24. New San Bernardino Courthouse<br />Superior Court of San Bernardino County<br />Status: Working Drawings Phase<br />Estimated Construction Cost: $304M<br />Architect: SOM<br />Contractor: Rudolph & Sletten(CM@Risk) <br />
  25. 25. New Long Beach Courthouse<br />Superior Court of Los Angeles County<br />Status: In Design<br />Contractor: Long Beach Judicial Partners<br />Delivery: Performance Based Infrastructure (PBI)<br />
  26. 26. Master Schedule<br />
  27. 27. California Administrative Office of the Courts<br />
  28. 28. 2011 PROJECTS IN BANCRO<br />
  29. 29. 2011 PROJECTS IN NCRO (1)<br />
  30. 30. 2011 PROJECTS IN NCRO (2)<br />
  31. 31. 2011 CM@R PROJECTS IN SRO<br />
  32. 32. SRO PROJECTS ANTICIPATED BID<br />
  33. 33. 2011 SELECTION OF CM AGENCY CA SUPPORT<br />
  34. 34. INFORMATION<br />Project details will be published with each solicitation. Please monitor the California Courts website for updates.<br />RFQ/RFPs: www.courts.ca.gov/rfps.htm<br />Judicial Branch Capital Program: www.courts.ca.gov/programs-facilities.htm<br />Project Descriptions: www.courts.ca.gov/2559.htm<br />To receive e-mail updates regarding solicitations, provide your contact information to: www.courts.ca.gov/programs-facilities.htm<br />
  35. 35. QUESTIONS?<br />

×