MIDDLE SCHOOL RENOVATION<br />WEEKLY PROGRESS<br />JULY 5 THRU JULY 9<br />
7/6/10 NEW GYM WALL BEING CONSTRUCTED<br />
7/6/101ST FLOOR SOUTH SIDE REMOVAL OF OLD STUDENT ENTRANCE DOORS<br />
7/6/10A-POD 1ST FLOOR NORTH SIDE<br />
7/6/10F-POD 2ND FLOOR SOUTH SIDEDRYWALL IN PROGRESS<br />
7/6/10F-POD 2ND FLOOR SOUTH SIDE<br />
7/6/10D-POD 2ND FLOOR EAST SIDE INSULATING OF WALLS<br />
7/6/10<br />New library entrance on south side<br />Steps leading to library 2nd floor were removed<br />
7/6/10<br />Removal of 2nd floor entrance landing in library<br />New library entrance on north side<br />
7/6/10REMOVAL OF LIBRARY 2ND FLOOR ENTRANCES<br />
7/6/10OFFICE AREA<br />
7/6/10FOOD STORAGE / CUSTODIAL STORAGE ROOM WALLS REMOVED<br />
7/7/10D-POD 2ND FLOOR EAST SIDEINSULATING OF WALLS<br />
7/7/10<br />OLD LIBRARY ENTRANCE SOUTH SIDE WALLS BLOCKED<br />NEW LIBRARY ENTRANCE SOUTH SIDE IN PROGRESS<br />
7/7/10LIBRARY 2ND FLOOR ENTRANCE & STEPS WERE REMOVED<br />
7/7/10OLD PIT FILLED WITH STONE TO PREPARE FOR NEW STORAGE AREA<br />
7/7/10NEW STAIR RAILS INSTALLED<br />
7/8/10C-POD 1ST FLOOR SOUTH SIDE ROOMS ARE BEING PAINTED<br />
7/8/10OPENINGS AT EACH END OF HALL FOR NEW RESTROOMS NEAR GYM<br />
7/8/10E-POD 2ND FLOOR NORTH SIDE  WALL INSULATION STARTED<br />
7/8/10<br />LIBRARY NEW ENTRANCE SOUTH SIDE<br />LIBRARY NEW ENTRANCE NORTH SIDE<br />
7/8/10LIBRARY NORTH SIDE OLD ENTRANCE ENCLOSED<br />
7/8/10A-POD 1ST FLOOR NORTH SIDE<br />
Upcoming SlideShare
Loading in …5
×

Middle School Renovation Progress July 5-8

606 views

Published on

Published in: Education
  • Be the first to comment

  • Be the first to like this

Middle School Renovation Progress July 5-8

  1. 1. MIDDLE SCHOOL RENOVATION<br />WEEKLY PROGRESS<br />JULY 5 THRU JULY 9<br />
  2. 2. 7/6/10 NEW GYM WALL BEING CONSTRUCTED<br />
  3. 3. 7/6/101ST FLOOR SOUTH SIDE REMOVAL OF OLD STUDENT ENTRANCE DOORS<br />
  4. 4. 7/6/10A-POD 1ST FLOOR NORTH SIDE<br />
  5. 5. 7/6/10F-POD 2ND FLOOR SOUTH SIDEDRYWALL IN PROGRESS<br />
  6. 6. 7/6/10F-POD 2ND FLOOR SOUTH SIDE<br />
  7. 7. 7/6/10D-POD 2ND FLOOR EAST SIDE INSULATING OF WALLS<br />
  8. 8. 7/6/10<br />New library entrance on south side<br />Steps leading to library 2nd floor were removed<br />
  9. 9. 7/6/10<br />Removal of 2nd floor entrance landing in library<br />New library entrance on north side<br />
  10. 10. 7/6/10REMOVAL OF LIBRARY 2ND FLOOR ENTRANCES<br />
  11. 11. 7/6/10OFFICE AREA<br />
  12. 12. 7/6/10FOOD STORAGE / CUSTODIAL STORAGE ROOM WALLS REMOVED<br />
  13. 13. 7/7/10D-POD 2ND FLOOR EAST SIDEINSULATING OF WALLS<br />
  14. 14. 7/7/10<br />OLD LIBRARY ENTRANCE SOUTH SIDE WALLS BLOCKED<br />NEW LIBRARY ENTRANCE SOUTH SIDE IN PROGRESS<br />
  15. 15. 7/7/10LIBRARY 2ND FLOOR ENTRANCE & STEPS WERE REMOVED<br />
  16. 16. 7/7/10OLD PIT FILLED WITH STONE TO PREPARE FOR NEW STORAGE AREA<br />
  17. 17. 7/7/10NEW STAIR RAILS INSTALLED<br />
  18. 18. 7/8/10C-POD 1ST FLOOR SOUTH SIDE ROOMS ARE BEING PAINTED<br />
  19. 19. 7/8/10OPENINGS AT EACH END OF HALL FOR NEW RESTROOMS NEAR GYM<br />
  20. 20. 7/8/10E-POD 2ND FLOOR NORTH SIDE WALL INSULATION STARTED<br />
  21. 21. 7/8/10<br />LIBRARY NEW ENTRANCE SOUTH SIDE<br />LIBRARY NEW ENTRANCE NORTH SIDE<br />
  22. 22. 7/8/10LIBRARY NORTH SIDE OLD ENTRANCE ENCLOSED<br />
  23. 23. 7/8/10A-POD 1ST FLOOR NORTH SIDE<br />

×