Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Project Marshall Hungary

512 views

Published on

Published in: Real Estate, Business
  • Be the first to comment

  • Be the first to like this

Project Marshall Hungary

  1. 1. „ Marshall ” Logistics and Industrial Area Hungary
  2. 2. Company Details <ul><li>Company: „ MAJOR” Co. Ltd. </li></ul><ul><li>Location : „ Battalion” Area, East-Hungary </li></ul><ul><li>Founded in: 1987 </li></ul><ul><li>Reg. capital : HUF 50,000,000 ( ≈ EUR 150,000) </li></ul><ul><li>Sole owner : „ COLONEL” Ltd. </li></ul>
  3. 3. Presentation of „ Battalion ” Area <ul><li>Advantageous geographical conditions </li></ul><ul><ul><ul><li>Meeting point of Hungary, Ukraine and Slovakia </li></ul></ul></ul><ul><li>Excellent transportation infrastructure </li></ul><ul><ul><ul><li>Standard gauge and wide-gauge railways connection between EUROPE and CIS countries </li></ul></ul></ul><ul><ul><ul><li>EUROPEAN V. vehicular corridor (Trieste-Kiev- Moscow-Beijing) </li></ul></ul></ul><ul><ul><ul><li>4 near airports (Debrecen (HU), Nyíregyháza (HU) Kosice (SK) and Ungvár (UK)) </li></ul></ul></ul><ul><li>Favourable logistic and commercial conditions </li></ul>
  4. 4. Presentation of „ Battalion ” Area (2) <ul><li>Government strategy re development of „ Battalion ” Area </li></ul><ul><li>( Special Decree of the Government of Republic of Hungary) </li></ul><ul><ul><ul><li>Development of railway infrastructure </li></ul></ul></ul><ul><ul><ul><li>Development of intermodal logistic capacity </li></ul></ul></ul><ul><ul><ul><li>Development of inner public roads infrastructure </li></ul></ul></ul><ul><ul><ul><li>Promote of packaging, assembling, storage, redistributing centres and companies settlement </li></ul></ul></ul><ul><ul><ul><li>Favourable financial and competition possibilities </li></ul></ul></ul><ul><ul><ul><li>Development of professional education </li></ul></ul></ul><ul><ul><ul><li>region is designated for a 140 million EUR development project by European Union starting October  2009 </li></ul></ul></ul>
  5. 5. LOGISTICS AND INDUSTRIAL AREA <ul><li>Area: 6 hectares </li></ul><ul><li>Public utilities : </li></ul><ul><ul><li>water </li></ul></ul><ul><ul><li>gas </li></ul></ul><ul><ul><li>electricity </li></ul></ul><ul><li>Covering : asphalt </li></ul><ul><li>Vehicular connections: </li></ul><ul><ul><li>direct public road connection </li></ul></ul><ul><ul><li>Wide-gauge and standard gauge railways connection are under planning </li></ul></ul>
  6. 7. BUILDINGS <ul><li>Office s </li></ul><ul><li>Ground floor (11.7m x 27.6 m) </li></ul><ul><li>Reception office : </li></ul><ul><ul><li>1 unit 7. 5 s q m </li></ul></ul><ul><li>Offices: </li></ul><ul><ul><li>8 units, 104 s q m </li></ul></ul><ul><li>Buffet and kitchen: </li></ul><ul><ul><li>2 units, 28 s q m </li></ul></ul><ul><li>Client waiting room </li></ul><ul><ul><li>25 s q m </li></ul></ul><ul><li>Toilets: 3 units </li></ul><ul><li>Other rooms: 120 s q m </li></ul>
  7. 8. BUILDINGS <ul><li>Office s </li></ul><ul><li>Attic </li></ul><ul><li>L adies’ cloakroom </li></ul><ul><ul><li>2 units, 129 sqm </li></ul></ul><ul><li>Men’s’ changing-room </li></ul><ul><ul><li>2 units, 63 sqm </li></ul></ul><ul><li>Showers: 2 units </li></ul><ul><li>Toilets: 4 units </li></ul>
  8. 9. STORE I <ul><li>G round floor </li></ul><ul><li>Basic area : 1.823 sqm </li></ul><ul><li>Structure : brick </li></ul><ul><li>Windows: white colour plastic window </li></ul><ul><li>F looring : plastic </li></ul><ul><li>Width : 24.3 m </li></ul><ul><li>Length : 75 m </li></ul><ul><li>Height : 2.9 m </li></ul><ul><li>Number of entrances : 10 entrances </li></ul>
  9. 10. STORE I <ul><li>Attic </li></ul><ul><li>Basic area : 1.457 sgm </li></ul><ul><li>Height : 1.9 m </li></ul><ul><li>Length : 75 m </li></ul><ul><li>Width : 9 m </li></ul>
  10. 11. STORE II <ul><li>Basic area : 1.147 sgm </li></ul><ul><li>Structure : isolated metal panel </li></ul><ul><li>Windows: white colour plastic window </li></ul><ul><li>F lo oring : concrete </li></ul><ul><li>Width : 31.2 m </li></ul><ul><li>Length : 37 m </li></ul><ul><li>Height : 5 m </li></ul><ul><li>Number of doors : 7 </li></ul>
  11. 12. Workshop <ul><li>Basic area : 462 sgm </li></ul><ul><li>Structure : brick </li></ul><ul><li>Windows: white colour plastic window </li></ul><ul><li>F lo oring : concrete </li></ul><ul><li>Width : 12.88 m </li></ul><ul><li>Length : 60 m </li></ul><ul><li>Height : 3 m </li></ul><ul><li>Number of doors : 1 door </li></ul><ul><li>Roofed store </li></ul><ul><li>Basic area : 240 sgm </li></ul><ul><li>F lo oring : asphalt </li></ul>
  12. 13. Maintenance workshop <ul><li>Maintenance workshop : 50 sgm </li></ul><ul><li>Store: 8. 2 sgm </li></ul><ul><li>Fork -lift charger : 34 sgm </li></ul><ul><li>Accumulator storing : 16 sgm </li></ul><ul><li>Acid storing : 19. sgm </li></ul><ul><li>Social block : 7.3 sgm </li></ul><ul><li>Structure : brick </li></ul><ul><li>Windows: white colour plastic window </li></ul><ul><li>F lo oring : concrete and asphalt </li></ul><ul><li>Width : 6. 3 m </li></ul><ul><li>Length : 24.6 m </li></ul><ul><li>Height : 2.9 m </li></ul><ul><li>Number of doors : 4 doors </li></ul>
  13. 14. FURTHER FACILITIES <ul><li>Mineral water fountain s </li></ul><ul><li>Fuel tanks </li></ul>
  14. 15. GREEN FIELD <ul><li>Location: right hand side of the industrial area </li></ul><ul><li>Area: 7 hectares </li></ul><ul><li>Vehicles connection: Wide-gauge and standard gauge railways connection are under planning </li></ul><ul><li>Public utilities : </li></ul><ul><ul><li>water </li></ul></ul><ul><ul><li>gas </li></ul></ul><ul><ul><li>electricity </li></ul></ul>
  15. 17. CAPACITIES <ul><li>Warehouse capacity on built in area : 4.400 sqm </li></ul><ul><li>( 5,000 pieces Euro pallets per turning) </li></ul><ul><li>Rail traffic capacity on built in area : </li></ul><ul><li>By convention with MÁV (Hungarian Railways) p lanned length of Rail gauge : </li></ul><ul><li>European rail gauge on build in area is 250 m </li></ul><ul><li>Wide rail gauge on build in area is 350 m </li></ul><ul><li>Loading capacity on built in area: 500.000 tons per year </li></ul><ul><li>Mineral water exploitation: 20-40  trucks of per day </li></ul>
  16. 18. INQUIRIES <ul><li>Máté Igor  Law Office </li></ul><ul><li>www.legalmate.hu    </li></ul><ul><li>[email_address] </li></ul><ul><li>+36 20 526 5925      Budapest, VI. Benczúr u. 8. 1068 -Hungary   ( GoogleMap )      </li></ul>

×