• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Like this document? Why not share!

Drill Blast Brochure

on

  • 2,015 views

 

Statistics

Views

Total Views
2,015
Views on SlideShare
2,014
Embed Views
1

Actions

Likes
0
Downloads
28
Comments
0

1 Embed 1

http://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Drill Blast Brochure Drill Blast Brochure Document Transcript

    • The only gathering of mine operators in Europe at e p Bo nde e o te ric th ok es f 2 3 for ! Drill & Blast Europe 2011 Revolutionise your blast quality with proven techniques and design patterns that deliver the best fragmentation 18th – 19th January 2011 | Grand Hotel Stockholm | Sweden Top 12 mine operator experts confirmed Outstanding Speaker Faculty includes: Dereck Guilfoyle, Safety and Drilling Manager, EMED MINING Torbjörn Krigsman, Blasting Engineer, BOLIDEN AITIK Drill & Blast Europe 2011 will give first hand Jonny Bagein-Linder, Manager Production insight from European mines about how they Systems, BOLIDEN AREA perform their blasts Jan Kläre, Superintendent Mine Development, New EU legislation Find out how the Traceability of LUNDIN MINING ZINKURVAN Explosives directive will impact your operations Corina Hebestreit, Director, EUROMINES Paddy McConnell, Area Planning Engineer, Understand best practice approaches to ensure the BOLIDEN TARA Safety & Security of your drill & blast operation Otto Hedstrom, Research Engineer, LKAB Getting your Design right: Deploy the best drilling Ben Oldfield, Mining Engineer, GALMOY MINE patterns to improve the accuracy of your blast modelling Peter Reinders, Product Manager Electronic Measure your Vibration: How to incorporate Blasting Systems, ORICA MINING SERVICES monitoring and measurement systems into your overall Ryan Freeman, Drill & Blast Engineer, environmental compliance strategy SRK CONSULTING Thomas Oberndorfer, Director, MINE IT Curtis Stacy, General Manager, Flanders Electric Tailor-made Interactive Evening Masterclasses Mining Systems Division, FLANDERS ELECTRIC 18th – 19th January 2011 Rüdiger Triebel, Head of Mining Engineering, Masterclass A: Which Environmental Aspects Should You K+S AKTIENGESELLSCHAFT/ EUROMINES Consider When Using Emulsion Explosives? Jonny Bagein-Linder, Manager Production Systems, BOLIDEN AREA Sponsors Masterclass B: The Future of Mining With Electronics: How Can New Technology Help You Achieve a Better Blast Result Dr. Peter Reinders, Product Manager Electronic Blasting Systems, EMEA, ORICA MINING SERVICES “This drill and blast conference will help us learn from other mine operators and technical experts, and we look forward to hearing of any new ways to improve our productivity” Paddy McConnell, Area Planning Engineer, Boliden Tara Mines +44 (0)20 7368 9373 +44 (0)20 7368 9377 TEAM@IQPC.co.uk
    • ”Drilling and blasting is at the core of successful mining, this conference is a great opportunity to meet colleagues and discuss challenges and opportunities within these topics” Jan Kläre, Superintendent Mine Development, Zinkgruvan, Sweden 5 Reasons why this is a Dear Drill & Blast Professional, Have you got the best drilling pattern and explosive combination in must attend event for place to deliver the optimum blast? drill & blast professionals With Europe pushing to become independent in supplying raw materials in upcoming years, we will witness increased investments in new exploration Complex exposure to drill & blast production in mining across Europe. This means an added emphasis on getting the right expertise and techniques in place throughout the entire 1 engineers with whom you can share successes and learn from failures. mining cycle to meet these demands. You’ll notice that the atmosphere is After speaking to 43 drill & blast engineers in European Mines and their contractors over the last few months it is evident that getting your blast right 2 different from other conferences. We actively maintain a reduced vendor is of essential importance to mine operators. If just one thing goes wrong during the drill & blast phase, you could be faced with heavy consequences ratio, which creates a more intimate that could slow down your production, harm the environment or even environment for knowledge sharing and endanger the lives of fellow miners on site. networking. Drill & Blast Europe 2011 will delve deep into the critical approaches you With over 16 industry speakers need to ensure you perform the optimum blast. Our outstanding speaker faculty includes Jonny Bagein-Linder, who will 3 confirmed at Drill & Blast Europe 2011 we bring together the brightest minds in discuss how bulk emulsion behaves in bedrock and how this will help you mining industry who will deliver their achieve a better blast. In addition Jonny will be running one of our interactive and practical masterclasses on the impacts bulk emulsion has on the first-hand insight into their drill & blast environment through leaking. So make sure you sign up for the masterclass department. as well as the conference. Supreme networking opportunities that Other key topics on our agenda include: New strategies on how to optimise fragmentation and minimise costs 4 allow you vital face-to-face interaction with industry peers. Insights into some of the biggest European mines blasting department Get direct insight through interactive Traceability of Explosives directive and how will it affect your mines operations 5 workshops with key opinion leaders in the field. How to improve your design pattern to avoid commodity loss You will learn more at this 2 day conference than you would at a 2 week training course! This gathering will encapsulate the very finest drill & blast professionals as well as newcomers looking to learn from the elite. Who will attend Drill & Mark the date in your diary: January 18th – 19th 2011. Blast Europe 2011? Avoid the wait list: places are limited and early registration is highly recommended. Make sure you secure your place at this bespoke industry event. Drill & Blast Engineers I look forward to meeting you in Stockholm! Drill & Blast Managers Kind Regards, P. S. Book as Drill & Blast Superintendants Sintija Dobrotinsek a team to make Mining Engineers Conference Director Construction IQ titanic savings! Shot Firers Operations Managers Area Planning Managers Sponsors Media Partners Mine Superintendent Principal Mining Engineer Open Pit Operations Manager Underground Mine Manager +44 (0)20 7368 9373 +44 (0)20 7368 9377 TEAM@IQPC.co.uk
    • CONFERENCE AGENDA DAY ONE | Tuesday 18th January 2011 Achieve Best Blast Quality 12:50 Lunch & Networking 8:30 Registration & Coffee 13:50 Get a Grasp on Grade Control and Avoid Ore Contamination 9:00 Chairperson’s Opening Remarks • Solve the issue of contaminated ore Paddy McConnell, Area Planning Engineer, • How to avoid waste rock contamination BOLIDEN TARA MINES • Blast designs and techniques that deliver on grade control 9:15 Dilution Control in Panel Stoping at Zinkgruvan, Dereck Guilfoyle, Safety and Drilling Manager, Sweden EMED MINING • Optimised drill & blast procedures for reduction of dilution CASE STUDY • How to achieve reduced cycle time for drill-blast-muck • Learn about safety issues and improvements that can 14:35 Manual and Computerised Modelling: How to be applied Achieve Effective Blast Design and Jan Kläre, Superintendent Mine Development, Implementation LUNDIN MINING ZINKURVAN • Find out about the limitations of computerised design CRITICAL INSIGHT such as data accuracy, block models and equipment 10:00 Automated Drill Systems Uncovered restraints • learn how to increase the overall production • Accurate drilling: the secret of effective blasting from • normalize your operators performance drill hole deviation to equipment maintenance • reduce performance drop out due to fatigue • Insight into best practice Blasting procedures, • how to address the problem of change management detonators and prime control you should adopt Curtis Stacy, General Manager, Flanders Electric Mining Ben Oldfield, Mining Engineer, GALMOY MINE Systems Division, Flanders Electric 10:50 Morning Coffee & Networking 15:15 Afternoon Tea & Networking 11:20 Find the Right Explosive for Your Type of Bedrock 15:50 How Can Monitoring the Explosions Help You • How bulk emulsion acts when it comes into contact Achieve Better Blasting Results in the Future? with cracks and joints • Utilise best available technology to improve both the CASE STUDY • Examine which parameters should be applied to the safety and quality of your blasting results structure and constitution of bulk emulsion at • Best practice for using highs speed video technology to applications, where tectonic elements occur re-examine blasts and identify root causes for ground • Identify and examine the widths of cracks in a mine in vibrations order to avoid emulsion leaking • Benchmarking case studies that use monitoring Jonny Bagein-Linder, Manager Production Systems, technologies in blasting BOLIDEN AREA Ryan Freeman, Drill and Blast Engineer, SRK CONSULTING 12:05 Successful Methods to Pre-splitting in Large Mining Operations • Find out about the challenges that are specific to large 16:45 Chairperson’s Closing Remarks mine sites and see how you can apply the lessons CASE STUDY learned in your mine • Evaluate the pre-splitting methods adopted in large Sign up for an evening mining operations • Unique techniques that should be applied to achieve masterclass when you register maximum production for the conference! Torbjörn Krigsman, Blasting Engineer, BOLIDEN AITIK +44 (0)20 7368 9373 +44 (0)20 7368 9377 TEAM@IQPC.co.uk
    • CONFERENCE AGENDA DAY TWO | Wednesday 19th January 2011 Ensure Safety and Security of the Operations “Drill & Blast 2011 will be an excellent 8:30 Registration & Coffee opportunity to discuss the legal framework for future best practice in the industry”. 9:05 Traceability - Big Changes For All Users Of Civil Explosives in Europe - Insights From A Major Corina Hebestreit, Euromines Consumer • A breakdown on the new directive and how to comply 12:35 Lunch & Networking with it • Why is it important to upgrade the methodologies used 13:35 Testing Electronic Detonators in LKAB to trace explosives • Execute a Successful Long Haul Blasting • Action Plan on how to treat precursors to explosives; • Showcase the LKAB Malmberget new approaches to insight and understanding blasting Rüdiger Triebel, Head of Mining Engineering, • Learn from the results of the electronic detonators usage K+S Aktiengesellschaft and EUROMINES Otto Hedstrom, Research Engineer, LKAB Malmberget Sweden 9:50 Achieve Workplace Safety During Drill & Blast 14:20 ProMIS: Making data monitoring easy and • Evaluate different methods for controlling fly rock profitable even for small and medium mining • What procedures should be revised to ensure better operations safety • Learn about the advantages of integrating blasting data • Find the balance between bureaucracy and into a comprehensive mining operation data concept uncompromised safety • High flexibility of adjustments allows general system to Sari Koivisto, Open Pit Operations Manager, be efficiently applied even in small operations without AGNICO-EAGLE MINES extensive IT-support • Supervision and analysis tools to help you squeeze the 10:35 Morning Coffee & Networking most out of your data Thomas Oberndorfer, Director, MINE-IT 11:05 Raw Materials Initiative: How Can it Help You? 15:05 End of Conference • Will Raw Material Initiative lead to increased investment in exploration projects? • Understand how increased investment in new Sign up for the evening masterclass technology will influence your work • How can incentives to create more jobs in mining when booking for conference. influence your future employment opportunities? Corina Hebestreit, Director, EUROMINES Learn more at this 2 day conference that at this 2 week 11:50 Second Largest Zink Underground Mine: Hear training course! About Drilling and Blasting Methods in Boliden Tara Mines • Overview of the Tara mine and mining methods used: backfilling, geology, block designs, geotechnical aspects and vibration monitoring • Examine the drill & blast designs used in the production unit • Survey profiling of completed units: What have we learned? • Development drift designs and survey controls: Assess which methods were most successful Paddy McConnell, Area Planning Engineer, BOLIDEN TARA MINES +44 (0)20 7368 9373 +44 (0)20 7368 9377 TEAM@IQPC.co.uk
    • fo th rill yo riti las rd is & Bo pas me ngin ur ca t e c b ok s a eti ee l t ng rs EVENING MASTERCLASSES | 18th – 19th January 2011 . Masterclass A Masterclass B 18th January 17:15 – 20:00 19th January 15:45 – 18:30 Which Environmental Aspects Should You The future of mining with electronics: how Consider When Using Emulsion Explosives? can new technology help you achieve a better Emulsion leaking into the environment is a major concern. It blast result is worrying from financial aspect, simply because you are There are multiple considerations that you need to know to loosing expensive explosive in the rocks and even more from achieve best results in blasting. One of them is to consider the environmental point of view where chemical electronic detonators. In this masterclass you will see how components can leak into water supply. electronics perform in addressing the issues within: Key issues to examine Vibration Control How bulk emulsions behave in hard rock and how can Perimeter Control you apply this knowledge in saving on explosion Fragmentation Control Ways of preventing emulsion leaking into the cracks and Dr. Peter Reinders, Product Manager Electronic Blasting thus avoid environmental damage Systems, EMEA, ORICA MINING SERVICES Blasting, technical, environmental and economical points of view need to be considered when looking for the best ration of emulsion Jonny Bagein-Linder, Manager Production Systems, BOLIDEN AREA Visit www.drillandblasteurope.com to access complimentary and exclusive interviews, reports, articles and presentations! DO YOU HAVE A SOLUTION THAT WILL HELP DRILL & BLAST PROFESSIONALS ACHIEVE THE ULTIMATE BLAST? Our delegates are actively looking for fresh and innovative technology solutions and services to assist in drilling & blasting. Are you an explosive provider? Do you provide software for 3D mapping, mine design and production planning? Can you assist in delivering blasting equipment and accessories? If you have a product or a solution that would benefit drill & blast engineers then Construction IQ can help you get your message across to these potential clients, and place your company in prime position at this industry renowned event. For sponsorship opportunities contact Dale Harris directly on +44(0)207 3689500 email on sponsorship@iqpc.co.uk or visit www.drillandblasteurope.com to discuss the right package for your organization. +44 (0)20 7368 9373 +44 (0)20 7368 9377 TEAM@IQPC.co.uk
    • Drill & Blast Europe 2011 4 EASY WAYS TO REGISTER Revolutionise your blast quality with proven Phone: +44 (0)20 7368 9373 Fax: +44 (0)20 7368 9377 techniques and design patterns that deliver the Email: TEAM@IQPC.co.uk best fragmentation Post: Customer Service Department, January 18th – 19th Stockholm | Sweden IQPC Ltd., 129 Wilton Road, Victoria, London, SW1V 1JZ, UK To speed registration, please provide the priority code located on the mailing label or in the box below. My registration code is: #R Please contact our database manager on +44(0) 207 368 9300 or at database@iqpc.co.uk quoting the registration code above to Team Discounts*** inform us of any changes or to remove your details. Book 3 for the price of 2 DELEGATE PRICING IQPC recognises the value of learning in terms. Group bookings at the same time from the same company Register by Register by Register by Standard Package receive a discount. Only one discount available per 8th October* 5th November* 10th December* Price person. Team Discounts are not available with 2,297€ + VAT 2,397€ + VAT 2,497€ + VAT K Conference + 2 Masterclasses (Save 400€) (Save 300€) (Save 200€) 2,697€ + VAT another discount. 1,748€ + VAT 1,848€ + VAT 1,948€ + VAT K Conference + 1 Masterclass** 2,098€ + VAT (Save 350€) (Save 250€) (Save 150€) Venue and Accommodation 1,199€ + VAT 1,299€ + VAT 1,399€ + VAT K Conference only 1,499€ + VAT Venue Grand Hôtel Stockholm (Save 300€) (Save 200€) (Save 100€) Södra Blasieholmshamnen 8P O Box 16424 103 27 STOCKHOLM SWEDEN K Masterclass only** 599€ + VAT Tel: + 46 (0) 8 679 35 00 Fax: + 46 (0) 8 611 86 86 E-mail: info@grandhotel.se * To qualify for discounts, payments must be received by the early bird registration deadline. Early booking discounts are not valid in Accommodation Overnight accommodation is not included in the conjunction with any other offer. registration fee. For information on hotels nearby please visit ** Please select your choice of Masterclass A B www.drillandblasteurope.com or search *** In order to qualify for the 3for2 offer registrants must be part of the same company. www.4cityhotels.com/stockholm.html Team discounts cannot be used in conjunction with any other discount. DELEGATE DETAILS (please photocopy for each additional delegate) Terms and Conditions Delegate 1: Mr Mrs Miss Ms Dr Other Please read the information listed below as each booking is subject to IQPC Ltd First Name: Family Name: standard terms and conditions. Payment Terms: Upon completion and return of the registration form, full payment is required no later than 5 business days Job Title: from the date of invoice. Payment of invoices by means other than by credit card, or purchase order (UK Plc and UK government bodies only) will be subject Tel No: Email: to a €65 (plus VAT) per delegate processing fee. Payment must be received prior to the conference date. We reserve the right to refuse admission to the Yes, I would like to receive information about products and services via email conference if payment has not been received. Organisation: IQPC Cancellation, Postponement and Substitution Policy: You may substitute delegates at any time by providing reasonable advance notice to Address: IQPC. For any cancellations received in writing not less than eight (8) days prior to the conference, you will receive a 90% credit to be used at another IQPC County: conference which must occur within one year from the date of issuance of such Postcode: Country: credit. An administration fee of 10% of the contract fee will be retained by IQPC for all permitted cancellations. No credit will be issued for any Telephone: Fax: cancellations occurring within seven (7) days (inclusive) of the conference. In the event that IQPC cancels an event for any reason, you will receive a credit Approving Manager: for 100% of the contract fee paid. You may use this credit for another IQPC event to be mutually agreed with IQPC, which must occur within one year from Name of person completing form if different from delegate: the date of cancellation. In the event that IQPC postpones an event for any Signature: reason and the delegate is unable or unwilling to attend on the rescheduled date, you will receive a credit for 100% of the contract fee paid. You may use I agree to IQPC’s cancellation, substitution and payment terms this credit for another IQPC event to be mutually agreed with IQPC, which must occur within one year from the date of postponement. Except as specified Special dietary requirements: Vegetarian Non-dairy Other (please specify) __________________ above, no credits will be issued for cancellations. There are no refunds given Please indicate if you have already registered by: Phone Fax Email Web under any circumstances. IQPC is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. Please note: if you have not received an acknowledgement before the conference, please call us to confirm your booking IQPC shall assume no liability whatsoever in the event this conference is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this PAYMENT DETAILS conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labour strike, Total price for your organisation (Add total of all individuals attending): __________________________ extreme weather or other emergency. Please note that while speakers and topics were confirmed at the time of publishing, circumstances beyond the Card Type: VISA Mastercard AMEX control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, IQPC reserves the right to Card Number: alter or modify the advertised speakers and/or topics if necessary without any liability to you whatsoever. Any substitutions or alterations will be updated on Expiry Date: / Security number: our web page as soon as possible. Discounts: All ‘Early Bird’ Discounts require payment at time of registration Name On Card: Signature: and before the cut-off date in order to receive any discount. Any discounts Conference code: 19417.001 offered whether by IQPC (including team discounts) must also require payment Billing Address (if different from above): at the time of registration. All discount offers cannot be combined with any City: other offer. DATA PROTECTION County: Postcode: Personal data is gathered in accordance with the Data Protection Act 1998. Your details may be passed to other companies who wish to communicate with Cheque enclosed (Made payable to IQPC Ltd.) for: € you offers related to your business activities. If you do not wish to receive these Please quote 19417.001 with remittance advice. offers, please tick the box below. IQPC Bank details: HSBC Bank Plc,67 George Street, Richmond, Surrey TW9 1HG, United Kingdom. Sort Code: 40 05 15 Account No: 59090618. Swift Code: MIDLGB22 IBAN Code: GB98 MIDL 4005 1559 0906 18. Account name: International Quality & Productivity Centre Ltd. Please do not pass my information to any third party PAYMENT MUST BE RECEIVED PRIOR TO THE CONFERENCE © IQPC Ltd. 2010 UK VAT registration no. GB 7992259 67