SlideShare a Scribd company logo
1 of 12
Download to read offline
Architect
Foundation in Natural &
Built Environment
January 2015
Ar. SW Lee
EXCLUSIVE
Detached Unit
favourite design
Roles & Responsibilities
of an Architect
SW Lee Architect
his company
Company Profile: SW Lee Architect
Interviewee Profile: SW Lee
Roles & Responsibility
Projects Involved
Project #1: Detached Unit
Project #2: Mini Convention Centre
Differences between Two Projects
Reflection
Ar.Lee formed his
own company - S W
Lee Architect with a
new approach which
i s t o d e v e l o p a
company which can
stay ahead in design,
suit the contextual
environment, and
based on a unique
c o n c e p t . H e
p e r s o n a l l y h a n d
picked his staffs with
a g o o d c r e a t i v e
q u a l i t y a n d
c o m m i t m e n t . H i s
company started out
with a team of 8
members and started
up a small office in
Taman Bukit Emas.
Content
SW Lee ArchitectCOMPANY
PROFILE
1
2
3
4
5
7
8
10
page | 1
Ar. SW Lee
Ar. Lee had been working for 25 years as an architect. He studied architecture in the
National University of Singapore (NUS) in 1982 and finished his masters in 1988. He then
worked as an architect for 4 years in Singapore. After 4 years of working experience in
Singapore, he started a partnership company in Seremban named Architect Saujana.
Finally, in year 1995, he started his own company named SW Lee Architect.
INTERVIEWEE
PROFILE
He have his own way of dealing with
different clients,. He is flexible in his
approach especially to those who are
extra fussy. Some of the clients do not
know what they want so it’s his
responsible to lead and advice them.
What keeps him going on his journey
as an architect was the satisfaction when
each project was completed and it is
appreciated by the clients. He will be
motivated to do better every single time
to fulfill the client’s requirements.
NEVER
say die
&
NEVER
give up
“
”
page | 2
Basically, an architect fulfill the
requirements of every clients based on the
types of projects offered. He will have to
come out with various conceptual design
sketches and put them into drawings for
submission and construction. In addition,
he will also have to help in preparing many
tender documents and work alongside with
contractors. During construction, he is
responsible to supervise the works on site
and check whether the works are done
accordingly to their drawings as well as
solving every problem that arise during
construction. He is also authorized to issue
the Certificate of Compliance and
Completion ( CCC ) when the building is
completed.
Roles & Responsibilities
S o m e o f t h e c o m m o n
problems faced are technical
problems that arise during
construction period for example
errors in the joints, the building
was not built accordingly to the
plan provided.
page | 3
Projects
Involved
He is in charge of various projects ranging
from the smallest to the slightly bigger ones
namely residential buildings, commercial
buildings, industrial buildings, educational
buildings and many more.
For the residential building, he was employed
to design bungalows, housing areas, semi-
detached units and detached units.
On the other hand, he had designed shop lots,
hotels and shopping malls which falls under
the category of commercial buildings.
For the industrial building, he was employed to
design a factory at Port Klang as well as
schools which are educational buildings.
He is also involved in many other projects for
example, hospitals, community blocks and etc.
page | 4
Residential Building
Commercial Building
Industrial Building
Educational Building
Hospital
One of his favourite project designing a
resort style detached unit. The design process
for the detached unit begins with analyzing the
site which includes a few main aspects
namely topography, microclimate, visual study
and character of the site. Then, a brief will be
given by the client and he will have to plan
accordingly to the client’s requirements. For
this project, he was requested to design a
resort style detached unit which blends the
inside and outside. The client also requested
that the detached unit must have good
ventilation , shade and comfort.
A conceptual design will be proposed
after combining all the ideas and
requirements of the client. After having an
overall idea of the design, he then draw out
the building using computer aided
software’s like AutoCAD and Sketchup.
A budget for the detached unit will be
establish as soon as the plans are ready.
He will get advices from other profession
about the building which includes the
suitability of design, and the estimated cost
and time of construction.
Detached UnitPROJECT
#1
page | 5
After the client has approved the outcome
of the design, it will be send to the local
authorities for approval. After the approval,
construction is able to start. During
construction, regular site visits are needed to
ensure the project is running on time and to the
building specifications as well as resolving any
problems that arise during the construction
period.
The legal and contractual procedures for
all the projects are quite the same which is to
prepare an award letter and a contractor
document to the successful contractor as it will
spell out all the terms and conditions for the
contractors to finish their work. Submission of
progressive reports on the progress of the
construction to local authorities are also
needed to keep them updated at anytime.
Next, he will propose the design to the
client for approval by using plans, sketched
and models. He will also answer every
question that the clients asked and make
changes if there is any.
page | 6
There are some problems met
during construction of this detached
unit. First is the retaining wall issues
because it is connected to the
neighbouring wall. In order to solve
this problem , they need to do it
carefully so the retaining wall will not
affect the neighbour’s existing wall.

Secondly, the swimming pool in the centre of the detached unit is a heavy structure which
cannot be connected to the other structure of the building. It will make the whole structure fall
apart due to its weight. Since it is a heavy structure, it should be built independently and not
tied back to the back of the main building structure. So, it won’t affect the main building if
there is any crack or sink.
This project takes around 2 to 3 years’ time to complete it.
Mini
Convention Centre
PROJECT
#2
The inspiration of design
concepts is implemented
from company’s
philosophy which stresses
on creativity in the
designs and also come
out with daring and bold
ideas. He said that we
should think out of box
and be creative in order to
get an attractive design.
The second projects which he was quite
satisfied with was the mini convention centre
which is still under the process of approval.
The chosen site for the mini convention
centre is located at Taman Seremban which is
surrounded by a commercial area with many
shop lots. It was designed with 49 units of
hotel rooms, a commercial block at the ground
floor, an event hall for functions to be held and
a mini theatre.
Site Location:
page | 7
For the detached unit, the site is chosen by the client beforehand. The client then look
for an architect ,which is me, to visit and analyze the site for further design process. As for
the convention centre, the site was no chosen. In fact, after I have been employed by the
client, I have to search for a site that is suitable for the construction of the convention centre
in consideration of the location, the needs of the community at that particular area, then
analyze a few chosen site and propose to the client. The client will then select from the few
sites that I have chosen through visitations to the sites and through my analysis.
Differences and
contrast between the
two projects
For the detached unit, I just need to
fulfill a small number of clients, for
example, the family members of that
particular detached unit as I just have to
fulfill their requirements. On the other
hand, for the convention centre, I have to
fulfill a large number of people, not just
the client but also the community.
Therefore, I will have to put the
requirements of the client and the
requirements of the community at that
area in consideration as the convention
centre is built for the community, not just
the client.
Landscape is one of the most important component for the detached unit where I have to
design and think where and how the landscapes of the house should be like. For example,
for this detached unit, there is an open space right in the middle of the house , which is the
grand living. I have designed an indoor landscape as one of the requirements of this project
is to blend the inside and outside.There are just minor consideration of landscapes for the
convention centre as the open areas should be car parking areas. There are just a small
area of landscape compared to the detached unit.
page | 8
Well, it’s obvious that the work load of the convention centre is far more heavier than the
detached unit as there are more details to be considered.
The budget for the detached unit is low and more flexible compared to the convention
centre as it is a private property with no business intention. The detached unit is their home so
the client are willing to pay more provided it is necessary to make their home a better place to
live in. As for the convention centre, the budget is higher as it is five times bigger than the
detached unit. Besides, it is a business based project so the budget is restricted as most of
the clients involved are business minded and will not consider to pay more if there is really not
necessary.
The legal process of the detached unit is slightly shorter compared to the convention
centre as the convention centre is a much bigger project which will have a bigger impact on
the community. Therefore, the process will take about 3 to 4 years for approval as the local
authorities will have to look very deeply in it.
page | 9
Madeline Liew Zhi Qi
Reflection
page | 10
Lee Yet Yee
Law Jia XinLim Woo Leon Lee Lin Hui
Koo Jian Xiang
Prepared by:
Throughout the process of interviewing the architect, we were able to have an in-depth
understanding of what an architect do in the construction industry. In addition, we
gained more knowledge on the roles and responsibilities of an architect which helped
us to have a clearer picture of what we are going to do in the future as an architect. We
also learned more about the design process of a building which will be a guideline for
us when designing any types of buildings.
Besides gaining more knowledge of architecture, we were inspired by looking at the
different projects done by our interviewee and his passion towards architecture had
motivated us to strive harder in becoming a successful architect in the future just like
him. We also gained some useful tips on how to deal with different clients in the future
which is an important skill for us.
In the process of making the magazine, we learned how to cooperate with different
type of personality and find the best solution to produce a good magazine. We also
learned how to interpret information from the conversation which is an important
aspect for us in our future studies.
Last but not least,
we learned how to
accept different
o p i n i o n s f r o m
each of our team
m e m b e r. T h i s
really helped us to
i m p r o v e o u r
interpersonal skill
a n d w e w e r e
h a p p y t h a t
everything went
out well till the end
of the project with
much satisfaction.
FNBE | January 2015 Intake | Introduction to the Construction Industry | Project 1B
Lee Yet Yee | Madeline Liew Zhi Qi | Law Jia Xin | Lim Woo Leon | Lee Lin Hui | Koo Jian Xiang
His target of being an architect is to leave behind a legacy as he will not be
around forever but there is something that was left behind to remember of.

More Related Content

What's hot

Culture History Report
Culture History ReportCulture History Report
Culture History ReportYung Kai
 
MUZIUM DIRAJA report
MUZIUM DIRAJA report MUZIUM DIRAJA report
MUZIUM DIRAJA report Lee Qin Ni
 
Building Services Report 2016
Building Services Report 2016Building Services Report 2016
Building Services Report 2016KhangWei Chin
 
module 4,part 3 CLADDING REF.pdf
module 4,part 3 CLADDING REF.pdfmodule 4,part 3 CLADDING REF.pdf
module 4,part 3 CLADDING REF.pdfAnoHossey
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remediesSOUMYA KHANDELWAL
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara MaybankSheau Hui Tan
 
Culture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportCulture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportEuxuan Ong
 
Building Economics Assignment Report
Building Economics Assignment ReportBuilding Economics Assignment Report
Building Economics Assignment Reportashleyyeap
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction ReportSheau Hui Tan
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case StudyLovie Tey
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
History of Ethiopian Architecture, Addis Ababa and its Architectural background
History of Ethiopian Architecture, Addis Ababa and its Architectural backgroundHistory of Ethiopian Architecture, Addis Ababa and its Architectural background
History of Ethiopian Architecture, Addis Ababa and its Architectural backgroundToffik Abdela Hassen
 
Walian house case study
Walian house case studyWalian house case study
Walian house case studyJoshua Lee
 

What's hot (20)

Culture History Report
Culture History ReportCulture History Report
Culture History Report
 
MUZIUM DIRAJA report
MUZIUM DIRAJA report MUZIUM DIRAJA report
MUZIUM DIRAJA report
 
Ct1 assignment
Ct1 assignmentCt1 assignment
Ct1 assignment
 
Building Services Report 2016
Building Services Report 2016Building Services Report 2016
Building Services Report 2016
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 
module 4,part 3 CLADDING REF.pdf
module 4,part 3 CLADDING REF.pdfmodule 4,part 3 CLADDING REF.pdf
module 4,part 3 CLADDING REF.pdf
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara Maybank
 
Culture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportCulture and History II: Menara Maybank Report
Culture and History II: Menara Maybank Report
 
Aluminium
AluminiumAluminium
Aluminium
 
klcc
klccklcc
klcc
 
Building Economics Assignment Report
Building Economics Assignment ReportBuilding Economics Assignment Report
Building Economics Assignment Report
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case Study
 
Btech report final
Btech report finalBtech report final
Btech report final
 
History of Ethiopian Architecture, Addis Ababa and its Architectural background
History of Ethiopian Architecture, Addis Ababa and its Architectural backgroundHistory of Ethiopian Architecture, Addis Ababa and its Architectural background
History of Ethiopian Architecture, Addis Ababa and its Architectural background
 
Walian house case study
Walian house case studyWalian house case study
Walian house case study
 

Viewers also liked

Kaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav Gupta
 
Subham convention center hyderabad
Subham convention center hyderabadSubham convention center hyderabad
Subham convention center hyderabadAdhitya Karne
 
Thesis drug rehab and detox
Thesis   drug rehab and detoxThesis   drug rehab and detox
Thesis drug rehab and detoxmichel fosu
 
International Convention Center in Katowice
International Convention Center in KatowiceInternational Convention Center in Katowice
International Convention Center in Katowicebelong2theCity
 
Mlr convention centre, bangloor.
Mlr convention centre, bangloor.Mlr convention centre, bangloor.
Mlr convention centre, bangloor.self employer
 
How to write architectural thesis
How to write architectural thesisHow to write architectural thesis
How to write architectural thesisPranay Kumar Tode
 
Climatology & Architecture
Climatology & ArchitectureClimatology & Architecture
Climatology & ArchitectureAr. Mukunda K.S
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish KumarNitish Kumar
 
B.Arch Course Portfolio
B.Arch Course PortfolioB.Arch Course Portfolio
B.Arch Course PortfolioSALMAN_HAROON1
 
Architectural thesis-manual
Architectural thesis-manualArchitectural thesis-manual
Architectural thesis-manualLawrence Ting
 
Shyam Thesis Report
Shyam Thesis ReportShyam Thesis Report
Shyam Thesis ReportShyam Singh
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfoliotb55
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013ROHIT SINGLA
 
Generating Architectural Concepts & Design Ideas
Generating Architectural Concepts & Design IdeasGenerating Architectural Concepts & Design Ideas
Generating Architectural Concepts & Design IdeasWan Muhammad / Asas-Khu™
 

Viewers also liked (19)

Kaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 web
 
Divyesh.portfolio
Divyesh.portfolioDivyesh.portfolio
Divyesh.portfolio
 
Subham convention center hyderabad
Subham convention center hyderabadSubham convention center hyderabad
Subham convention center hyderabad
 
Archi portfolio14
Archi portfolio14Archi portfolio14
Archi portfolio14
 
Thesis drug rehab and detox
Thesis   drug rehab and detoxThesis   drug rehab and detox
Thesis drug rehab and detox
 
International Convention Center in Katowice
International Convention Center in KatowiceInternational Convention Center in Katowice
International Convention Center in Katowice
 
Thesis introduction
Thesis   introductionThesis   introduction
Thesis introduction
 
Mlr convention centre, bangloor.
Mlr convention centre, bangloor.Mlr convention centre, bangloor.
Mlr convention centre, bangloor.
 
How to write architectural thesis
How to write architectural thesisHow to write architectural thesis
How to write architectural thesis
 
Climatology & Architecture
Climatology & ArchitectureClimatology & Architecture
Climatology & Architecture
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish Kumar
 
B.Arch Course Portfolio
B.Arch Course PortfolioB.Arch Course Portfolio
B.Arch Course Portfolio
 
Architectural thesis-manual
Architectural thesis-manualArchitectural thesis-manual
Architectural thesis-manual
 
Shyam Thesis Report
Shyam Thesis ReportShyam Thesis Report
Shyam Thesis Report
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
Concept sheet - Thesis
Concept sheet - ThesisConcept sheet - Thesis
Concept sheet - Thesis
 
2010 Thesis Project
2010 Thesis Project2010 Thesis Project
2010 Thesis Project
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013
 
Generating Architectural Concepts & Design Ideas
Generating Architectural Concepts & Design IdeasGenerating Architectural Concepts & Design Ideas
Generating Architectural Concepts & Design Ideas
 

Similar to Ici magazine (architect)

The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thuSAIFULLAH MAHMUD
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINEMao Hua
 
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Virtu Institute
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a projectJing Fan Koh
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1zerospaces_
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
DPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing BrochureDPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing Brochureannmarie1964
 
Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Mohamed Adel
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
Professional_practice_coa
Professional_practice_coaProfessional_practice_coa
Professional_practice_coaYogesh Bhardwaj
 
Professional_practice_I.pptx
Professional_practice_I.pptxProfessional_practice_I.pptx
Professional_practice_I.pptxYogesh Bhardwaj
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
Know the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planKnow the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planNI BT
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscapingTeck Wei
 

Similar to Ici magazine (architect) (20)

ARTSCAPE_Introduction
ARTSCAPE_IntroductionARTSCAPE_Introduction
ARTSCAPE_Introduction
 
The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thu
 
Design Brief Fundamentals
Design Brief FundamentalsDesign Brief Fundamentals
Design Brief Fundamentals
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINE
 
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a project
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
DPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing BrochureDPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing Brochure
 
Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Professional_practice_coa
Professional_practice_coaProfessional_practice_coa
Professional_practice_coa
 
Professional_practice_I.pptx
Professional_practice_I.pptxProfessional_practice_I.pptx
Professional_practice_I.pptx
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
General Contractor Miami
General Contractor MiamiGeneral Contractor Miami
General Contractor Miami
 
pre-design phase
pre-design phasepre-design phase
pre-design phase
 
Project Management Demo
Project Management DemoProject Management Demo
Project Management Demo
 
Know the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planKnow the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution plan
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscaping
 

More from Madeline Liew

ITD Design design process journal brief
ITD Design design process journal briefITD Design design process journal brief
ITD Design design process journal briefMadeline Liew
 
PSY Video research report
PSY Video research reportPSY Video research report
PSY Video research reportMadeline Liew
 
PSY comic presentation slides
PSY comic presentation slidesPSY comic presentation slides
PSY comic presentation slidesMadeline Liew
 
ENG Final research report pdf
ENG Final research report pdfENG Final research report pdf
ENG Final research report pdfMadeline Liew
 
PSYCH individual journal
PSYCH individual journalPSYCH individual journal
PSYCH individual journalMadeline Liew
 
Maths final report compilation statistics
Maths final report compilation statisticsMaths final report compilation statistics
Maths final report compilation statisticsMadeline Liew
 
Maths infographic poster
Maths infographic posterMaths infographic poster
Maths infographic posterMadeline Liew
 
Eng ii compare toy story vs inside out
Eng ii compare toy story vs inside outEng ii compare toy story vs inside out
Eng ii compare toy story vs inside outMadeline Liew
 
ENG + EPC Intergrared chinese herbal slides
ENG + EPC Intergrared chinese herbal slidesENG + EPC Intergrared chinese herbal slides
ENG + EPC Intergrared chinese herbal slidesMadeline Liew
 
EPC Final presentation project
EPC Final presentation projectEPC Final presentation project
EPC Final presentation projectMadeline Liew
 
Maths Exercise Answer
Maths Exercise AnswerMaths Exercise Answer
Maths Exercise AnswerMadeline Liew
 
C&C Final Project art culture architecture
C&C Final Project art culture architectureC&C Final Project art culture architecture
C&C Final Project art culture architectureMadeline Liew
 
PSY Fnbe research project (video)
PSY Fnbe research project (video)PSY Fnbe research project (video)
PSY Fnbe research project (video)Madeline Liew
 

More from Madeline Liew (20)

ITD DPJ 4
ITD DPJ 4ITD DPJ 4
ITD DPJ 4
 
ITD DPJ 2
ITD DPJ 2ITD DPJ 2
ITD DPJ 2
 
ITD DPJ 1
ITD DPJ 1ITD DPJ 1
ITD DPJ 1
 
ITD DPJ 3
ITD DPJ 3ITD DPJ 3
ITD DPJ 3
 
ITD Design design process journal brief
ITD Design design process journal briefITD Design design process journal brief
ITD Design design process journal brief
 
PSY Video slides
PSY Video slidesPSY Video slides
PSY Video slides
 
PSY Video research report
PSY Video research reportPSY Video research report
PSY Video research report
 
PSY comic presentation slides
PSY comic presentation slidesPSY comic presentation slides
PSY comic presentation slides
 
ENG Final research report pdf
ENG Final research report pdfENG Final research report pdf
ENG Final research report pdf
 
PSYCH individual journal
PSYCH individual journalPSYCH individual journal
PSYCH individual journal
 
Maths survey form
Maths survey formMaths survey form
Maths survey form
 
Maths final report compilation statistics
Maths final report compilation statisticsMaths final report compilation statistics
Maths final report compilation statistics
 
Maths infographic poster
Maths infographic posterMaths infographic poster
Maths infographic poster
 
Eng ii compare toy story vs inside out
Eng ii compare toy story vs inside outEng ii compare toy story vs inside out
Eng ii compare toy story vs inside out
 
ENG + EPC Intergrared chinese herbal slides
ENG + EPC Intergrared chinese herbal slidesENG + EPC Intergrared chinese herbal slides
ENG + EPC Intergrared chinese herbal slides
 
EPC Final presentation project
EPC Final presentation projectEPC Final presentation project
EPC Final presentation project
 
Maths Exercise Answer
Maths Exercise AnswerMaths Exercise Answer
Maths Exercise Answer
 
Maths Quadrilateral
Maths QuadrilateralMaths Quadrilateral
Maths Quadrilateral
 
C&C Final Project art culture architecture
C&C Final Project art culture architectureC&C Final Project art culture architecture
C&C Final Project art culture architecture
 
PSY Fnbe research project (video)
PSY Fnbe research project (video)PSY Fnbe research project (video)
PSY Fnbe research project (video)
 

Recently uploaded

4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptxJonalynLegaspi2
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 

Recently uploaded (20)

4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 

Ici magazine (architect)

  • 1. Architect Foundation in Natural & Built Environment January 2015 Ar. SW Lee EXCLUSIVE Detached Unit favourite design Roles & Responsibilities of an Architect SW Lee Architect his company
  • 2. Company Profile: SW Lee Architect Interviewee Profile: SW Lee Roles & Responsibility Projects Involved Project #1: Detached Unit Project #2: Mini Convention Centre Differences between Two Projects Reflection Ar.Lee formed his own company - S W Lee Architect with a new approach which i s t o d e v e l o p a company which can stay ahead in design, suit the contextual environment, and based on a unique c o n c e p t . H e p e r s o n a l l y h a n d picked his staffs with a g o o d c r e a t i v e q u a l i t y a n d c o m m i t m e n t . H i s company started out with a team of 8 members and started up a small office in Taman Bukit Emas. Content SW Lee ArchitectCOMPANY PROFILE 1 2 3 4 5 7 8 10 page | 1
  • 3. Ar. SW Lee Ar. Lee had been working for 25 years as an architect. He studied architecture in the National University of Singapore (NUS) in 1982 and finished his masters in 1988. He then worked as an architect for 4 years in Singapore. After 4 years of working experience in Singapore, he started a partnership company in Seremban named Architect Saujana. Finally, in year 1995, he started his own company named SW Lee Architect. INTERVIEWEE PROFILE He have his own way of dealing with different clients,. He is flexible in his approach especially to those who are extra fussy. Some of the clients do not know what they want so it’s his responsible to lead and advice them. What keeps him going on his journey as an architect was the satisfaction when each project was completed and it is appreciated by the clients. He will be motivated to do better every single time to fulfill the client’s requirements. NEVER say die & NEVER give up “ ” page | 2
  • 4. Basically, an architect fulfill the requirements of every clients based on the types of projects offered. He will have to come out with various conceptual design sketches and put them into drawings for submission and construction. In addition, he will also have to help in preparing many tender documents and work alongside with contractors. During construction, he is responsible to supervise the works on site and check whether the works are done accordingly to their drawings as well as solving every problem that arise during construction. He is also authorized to issue the Certificate of Compliance and Completion ( CCC ) when the building is completed. Roles & Responsibilities S o m e o f t h e c o m m o n problems faced are technical problems that arise during construction period for example errors in the joints, the building was not built accordingly to the plan provided. page | 3
  • 5. Projects Involved He is in charge of various projects ranging from the smallest to the slightly bigger ones namely residential buildings, commercial buildings, industrial buildings, educational buildings and many more. For the residential building, he was employed to design bungalows, housing areas, semi- detached units and detached units. On the other hand, he had designed shop lots, hotels and shopping malls which falls under the category of commercial buildings. For the industrial building, he was employed to design a factory at Port Klang as well as schools which are educational buildings. He is also involved in many other projects for example, hospitals, community blocks and etc. page | 4 Residential Building Commercial Building Industrial Building Educational Building Hospital
  • 6. One of his favourite project designing a resort style detached unit. The design process for the detached unit begins with analyzing the site which includes a few main aspects namely topography, microclimate, visual study and character of the site. Then, a brief will be given by the client and he will have to plan accordingly to the client’s requirements. For this project, he was requested to design a resort style detached unit which blends the inside and outside. The client also requested that the detached unit must have good ventilation , shade and comfort. A conceptual design will be proposed after combining all the ideas and requirements of the client. After having an overall idea of the design, he then draw out the building using computer aided software’s like AutoCAD and Sketchup. A budget for the detached unit will be establish as soon as the plans are ready. He will get advices from other profession about the building which includes the suitability of design, and the estimated cost and time of construction. Detached UnitPROJECT #1 page | 5
  • 7. After the client has approved the outcome of the design, it will be send to the local authorities for approval. After the approval, construction is able to start. During construction, regular site visits are needed to ensure the project is running on time and to the building specifications as well as resolving any problems that arise during the construction period. The legal and contractual procedures for all the projects are quite the same which is to prepare an award letter and a contractor document to the successful contractor as it will spell out all the terms and conditions for the contractors to finish their work. Submission of progressive reports on the progress of the construction to local authorities are also needed to keep them updated at anytime. Next, he will propose the design to the client for approval by using plans, sketched and models. He will also answer every question that the clients asked and make changes if there is any. page | 6 There are some problems met during construction of this detached unit. First is the retaining wall issues because it is connected to the neighbouring wall. In order to solve this problem , they need to do it carefully so the retaining wall will not affect the neighbour’s existing wall.
 Secondly, the swimming pool in the centre of the detached unit is a heavy structure which cannot be connected to the other structure of the building. It will make the whole structure fall apart due to its weight. Since it is a heavy structure, it should be built independently and not tied back to the back of the main building structure. So, it won’t affect the main building if there is any crack or sink. This project takes around 2 to 3 years’ time to complete it.
  • 8. Mini Convention Centre PROJECT #2 The inspiration of design concepts is implemented from company’s philosophy which stresses on creativity in the designs and also come out with daring and bold ideas. He said that we should think out of box and be creative in order to get an attractive design. The second projects which he was quite satisfied with was the mini convention centre which is still under the process of approval. The chosen site for the mini convention centre is located at Taman Seremban which is surrounded by a commercial area with many shop lots. It was designed with 49 units of hotel rooms, a commercial block at the ground floor, an event hall for functions to be held and a mini theatre. Site Location: page | 7
  • 9. For the detached unit, the site is chosen by the client beforehand. The client then look for an architect ,which is me, to visit and analyze the site for further design process. As for the convention centre, the site was no chosen. In fact, after I have been employed by the client, I have to search for a site that is suitable for the construction of the convention centre in consideration of the location, the needs of the community at that particular area, then analyze a few chosen site and propose to the client. The client will then select from the few sites that I have chosen through visitations to the sites and through my analysis. Differences and contrast between the two projects For the detached unit, I just need to fulfill a small number of clients, for example, the family members of that particular detached unit as I just have to fulfill their requirements. On the other hand, for the convention centre, I have to fulfill a large number of people, not just the client but also the community. Therefore, I will have to put the requirements of the client and the requirements of the community at that area in consideration as the convention centre is built for the community, not just the client. Landscape is one of the most important component for the detached unit where I have to design and think where and how the landscapes of the house should be like. For example, for this detached unit, there is an open space right in the middle of the house , which is the grand living. I have designed an indoor landscape as one of the requirements of this project is to blend the inside and outside.There are just minor consideration of landscapes for the convention centre as the open areas should be car parking areas. There are just a small area of landscape compared to the detached unit. page | 8
  • 10. Well, it’s obvious that the work load of the convention centre is far more heavier than the detached unit as there are more details to be considered. The budget for the detached unit is low and more flexible compared to the convention centre as it is a private property with no business intention. The detached unit is their home so the client are willing to pay more provided it is necessary to make their home a better place to live in. As for the convention centre, the budget is higher as it is five times bigger than the detached unit. Besides, it is a business based project so the budget is restricted as most of the clients involved are business minded and will not consider to pay more if there is really not necessary. The legal process of the detached unit is slightly shorter compared to the convention centre as the convention centre is a much bigger project which will have a bigger impact on the community. Therefore, the process will take about 3 to 4 years for approval as the local authorities will have to look very deeply in it. page | 9
  • 11. Madeline Liew Zhi Qi Reflection page | 10 Lee Yet Yee Law Jia XinLim Woo Leon Lee Lin Hui Koo Jian Xiang Prepared by: Throughout the process of interviewing the architect, we were able to have an in-depth understanding of what an architect do in the construction industry. In addition, we gained more knowledge on the roles and responsibilities of an architect which helped us to have a clearer picture of what we are going to do in the future as an architect. We also learned more about the design process of a building which will be a guideline for us when designing any types of buildings. Besides gaining more knowledge of architecture, we were inspired by looking at the different projects done by our interviewee and his passion towards architecture had motivated us to strive harder in becoming a successful architect in the future just like him. We also gained some useful tips on how to deal with different clients in the future which is an important skill for us. In the process of making the magazine, we learned how to cooperate with different type of personality and find the best solution to produce a good magazine. We also learned how to interpret information from the conversation which is an important aspect for us in our future studies. Last but not least, we learned how to accept different o p i n i o n s f r o m each of our team m e m b e r. T h i s really helped us to i m p r o v e o u r interpersonal skill a n d w e w e r e h a p p y t h a t everything went out well till the end of the project with much satisfaction.
  • 12. FNBE | January 2015 Intake | Introduction to the Construction Industry | Project 1B Lee Yet Yee | Madeline Liew Zhi Qi | Law Jia Xin | Lim Woo Leon | Lee Lin Hui | Koo Jian Xiang His target of being an architect is to leave behind a legacy as he will not be around forever but there is something that was left behind to remember of.