Your SlideShare is downloading. ×
0
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

DesignState Intralink to AgilePLM

1,048

Published on

A presentation featuring the DesignState connector for Intralink to Agile PLM

A presentation featuring the DesignState connector for Intralink to Agile PLM

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,048
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
23
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. DesignState Intralink to Agile Demonstration
    Zero Wait-State Company Confidential
  • 2. Agenda
    Definition of Zero Wait-State
    Zero Wait-State in Product Development
    About ZWS
    DesignState Architecture
    ZWS Engagement Model
    Demo
    Next Steps
    Discussion
  • 3. What is Zero Wait-State?
    Wait-state: a time-out period during which a CPU or bus lies idle. Wait states are sometimes required because different components function at different clock speeds.
    Zero Wait-state: an environment in which a CPU can process information at its optimal speed without having to wait for other components to catch up.
  • 4. What is Zero Wait-State in Product Development?
    Wait-state:
    Unnecessary delays in the product development cycle.
    Zero Wait-state:
    An environment that is fully optimized to eliminate unnecessary delays in the product development cycle.
  • 5. Wait-States in Product Development
    Executing a change when necessary files live in multiple systems…
    Creating new parts from scratch when you know they already exist (but are WAY too hard to find)…
    Everyone asking engineering to do something for them (e.g. create a photo rendering or a “simple” view of a design for making a technical illustration)…
    Tracking the impact of one change across a full product platform…
    Figuring out who has the latest version of “xyz”…
    Managing the work of many partners simultaneously and making sure they are working on the right data…
    These are just a few examples, do you have any others?
  • 6. About Us
    Operating since 1999
    Over 150 customers both small and large
    Partnerships with key technology and service providers (PTC, Oracle, Microsoft, VMWare)
    Domain Experts in Product Development solutions
    Extensive background in software development and deployment
    Zero Wait-State Company Confidential
  • 7. DesignState Windchill to Agile (WC2A) Capabilities
    DesignState WC2A
    Transfers BOM Structure from Windchill to Agile
    Supports publication of native data or viewable formats into Agile
    Publication can be interactive or event driven
    Publications are maintained in the synchronization log for accuracy
    Compatible with Agile’s change management functionality
    Can initiate, drive, and report on the change process between the two systems
    Maintains control and synchronization during the change process
    Slide 7
  • 8. DesignState Architecture & Process Flow
    Policies dictate when information is published and how the information is transformed
    DesignState
    Rules Engine
    • Synchronization
    • 9. Transformation
    ECO Created
    State Change
    ECO Released
    • Part number assigned
    • 10. Released State
    DesignState communicates with PDMlink utilizing the API
    DesignState communicates with Agile through the Agile SDK Connector
    Slide 8
  • 11. Event Queue
    View
    !Events
    !Events
    !Events
    MCAD Architecture
    ZWS – DesignState
    Agile PLM
    Windchill Intralink
    PDM2Agile
    Intralink
    PLM API
    PDM Publisher
    UGS Teamcenter
    PFP
    PDM2Agile
    Teamcenter
    A~A
    Synch-Log
    ZWS – Webapp
    Slide 9
  • 12. Intralink
    Pro/Engineer
    System Overview
    DesignState
    Agile PDM
    Create/Update
    Part: 3086071-101
    Drawing
    Create/Update Object
    Create/Update Object
    Create/Update Object
    top_boom.drw
    3086071
    Sync to File
    Sync to File
    Sync to File
    Doc: 3086071DOC
    Doc: PL3086071
    3086071.pdf
    Assembly
    3086071-101.stp
    PART_NUMBER
    3086072-001
    Native Pro/E File
    top_boom.asm
    3086071-101
    Native Pro/E File
    Part
    Part
    Part
    top_boom.drw
    Cam_plate1.prt
    Dummy.prt
    NO_PUB
    Cam_plate.prt
    3086072-001
    Library.prt
    3086073-001
    PART_NUMBER
    3086071
    PART_NUMBER
    3086071-101
    PART_NUMBER
    NO_PUB
    Part: 3086072-001
    Native Pro/E File
    Native Pro/E File
    Dummy.prt
    Library.prt
    Add to BOM
    Library parts are
    not synchronized
    PART_NUMBER
    3086073-001
    NR or ECO
    Create New
    No object published
    Part: 3086073-001
    Native Pro/E File
    Promote to Pending
    top_boom.asm
  • 13. Process Overview
    MCAD Interface
    • Checks for:
    • 14. Parameter/attribute validity
    • 15. Existing Agile Objects
    • 16. Existing Agile C/Os
    • 17. Actions:
    • 18. Objects created/modified
    • 19. Objects synchronized
    • 20. Viewables created/attached
    • 21. Structure created/modified
    • 22. Create/update Models/Drawings.
    • 23. Build structure (CAD BOM).
    • 24. Use the ‘Agile’ table to generate balloons (assembly drawings) and ‘fix’ find numbers
    • 25. Create a FN file (optional)
    Agile
    Pro/E
    • Explicitly published objects are added as affected items on COs.
    • 26. Files explicitly published together (same RTP form), are combined onto COs, if PA (Project) matches and require the same CO type (NR, ECO).
    • 27. If a CO exists which has the affected item listed on it already:
    • 28. The CO will be Redlined/updated if it’s not yet at the submitted state in Agile.
    • 29. The publishing event will Cancel if it’s at the submitted state or higher.
    • 30. Republishing Intralink objects to EXISTING Agile objects WILL NOT update attributes.
    • 31. Items NOT from a Library folder will redline DESCRIPTION on a C/O.
    • 32. Check in modified objects
    • 33. Use the Agile configuration table in Intralink to easily check for parameter validity:
    • 34. PART NUMBER
    • 35. CAGE CODE
    • 36. PROJECT
    • 37. Description
    Intralink
    • Promote objects in CS, OR
    • 38. Promote the objects during Check in
    • 39. Promote ONLY the objects to be explicitly published (on a C/O).
  • Consistent Results
    Established processes leads to higher quality solutions and faster time-to-market
    Internal support infrastructure in place for quality customer relationship management
    Focused on providing tangible, measurable value to our clients
    Leveraging Industry best practices ensures high impact/low risk solutions
    Zero Wait-State Company Confidential
  • 40. Zero Wait-State Benefits
    ZWS methodology maximizes value for the client
    Tailored solutions impact critical issues
    Domain knowledge ensures maximum results
    Partnerships give clients access to best in class resources and applications
    Zero Wait-State Company Confidential
  • 41. Next Steps
    Schedule a discovery workshop
    Map out key departments and personnel that can provide a full view of your product development process
    ZWS will conduct the discovery and gather data for a scope document
    ZWS will present scope document with recommended solutions.
    Client reviews results and recommendations

×