Your SlideShare is downloading. ×
5. project execution procedure
5. project execution procedure
5. project execution procedure
5. project execution procedure
5. project execution procedure
5. project execution procedure
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

5. project execution procedure

196

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
196
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. СЭА QUALITY MANAGEMENT SYSTEMThe documentname Procedure of building of objects Effective date:Code: SEA-P707 14.03.2006 years THE MAINTENANCE: 1. THE PURPOSE 2. SCOPE OF APPLICATION 3. REFERENCES TO DOCUMENTS 4. THE PROCEDURE DESCRIPTION 5. RESPONSIBILITY AND POWERS 6. DESIGNATIONS AND REDUCTIONS 7. APPENDICES THE HAS PREPARED: HAS CHECKED UP: HAS CONFIRMED: DOCUMENT Post: Chief ПТО The chief engineer The general director FIRST NAME, MIDDLEINITIAL, LAST Varakin O. Lerner B. Lobach A. NAME:The signature: № 1. 2. 3. 4. 5.SEA P707 Sheet 1 1from 6
  • 2. СЭА QUALITY MANAGEMENT SYSTEMThe documentname Procedure of building of objects Effective date:Code: SEA-P707 14.03.2006 yearsChanges Date: The signature: Sheet of mailing of the document№ The name Date The Postпп Divisions Receptions signature1 The top management The general director 16.03.062 The chief engineer 16.03.06 г3 Head СМК 16.03.06 г4 The chief accountant 16.03.06 г5 The agent on supply 16.03.06 г6 The manager on the personnel 16.03.06 г7 Technological The chief of department 16.03.06 г department8 The mechanic 16.03.06 г9 Industrial site №1 The chief of a site 17.03.06г.10 Industrial site №2 The chief of a site 17.03.06г.SEA P707 Sheet 1 2from 6
  • 3. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of building of objects Effective date: Code: SEA-P707 14.03.2006 years 1. The procedure purpose. The present procedure regulates an order of the organisation of building of objects under contracts and Electrical Instrumentation Construction Corporationcontracts. 2. Scope of application The present process is obligatory for use by all structural divisions of the company. 3. The reference to documents  ISO 9001:2000, section 7;  Quality manual of SEA QM-01  SNI П 111-4-80;  SNI П 3.01.03-84;:  ВСН 004-88;  ВСН 005-88;  ВСН 011-88;  ВСН 012-88 4. The procedure description In the primary activity – the organisation of building of petro-gas pipelines and theirinfrastructure carries out Electrical Instrumentation Construction Corporationby means of attractionto this work of the specialised building companies on conditions субподряда. The organisation and performance of works on building of objects develops of separateprocesses, the block which scheme is presented in the appendix №1. 4.1. The contract or contract conclusion on building. The order of the conclusion of the contract contract on building is stated in procedure ofSEA П702. 4.2 Selection and appointment as orders of a management of Electrical InstrumentationConstruction Corporationof the curator of building of object and leaders ИТР. Nominees steal up from among employees of the company taking into account their know-how work, personal qualities and vocational training.SEA P707 Sheet 1 3from 6
  • 4. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of building of objects Effective date: Code: SEA-P707 14.03.2006 years 4.3. Performance of mobilisation actions. Are carried out together with the involved subcontract organisations and includes a little inparallel carried out actions, namely:  It is developed by technological department PPR (the project of manufacture of works);  Get out and certified by chief specialists of Electrical Instrumentation Construction Corporationof technology of performance of works (welding, изоляционных, etc.);  On a building site heads of building with pilot group leave and will organise an infrastructure of a site of building. 4.4. Working out and the coordination with the Customer of the schedule of building of object. According to requirements of contract ПТО under the direction of the Chief engineer develop the schedule of building of object and co-ordinate it with the Customer. 4.5. Purchase of materials and the equipment for object building According to contract specifications, and also after positive results of certification of the basic technological processes the agent on supply under the demand given out ПТО carries out purchase of materials and the equipment according to procedure of SEA P704. 4.6. Performance of civil and erection works. Works on object are carried out by production teams on the certified technologies and typical technological instructions. It is simultaneously carried out quality of performance of works is supervised, realisation of the schedule of building is analyzed. 4.7. Registration of the executive documentation «as is constructed». All stages of works come to the end with registration of intermediate certificates. From the specified documents the executive documentation which on building end is transferred to the Customer is formed. Forms of certificates are certificated, resulted in СНиП or ВСН. 4.8. Tests and object pusko-adjustment. It is carried out by the personnel of building division under the direction of Electrical Instrumentation Construction Corporation with participation of the Customer, under requirements of standards or special requirements of the Customer. 4.9. Transfer of the constructed object to the Customer. The process end 5. Responsibility and powers.SEA P707 Sheet 1 4from 6
  • 5. СЭА QUALITY MANAGEMENT SYSTEMThe documentname Procedure of building of objects Effective date:Code: SEA-P707 14.03.2006 years This procedure is applied by all divisions of the company participating in preparation and the organisation of process of building of objects. The general control over correct application of the present procedure is assigned to the Chief engineer. 6. Designations and reductions ППР – the Project of manufacture of works ПТО – Technological department СНиП – Building norms and rules 7. Appendices The appendix № 1 – the Block the process schemeSEA P707 Sheet 1 5from 6
  • 6. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of building of objects Effective date: Code: SEA-P707 14.03.2006 yearsThe The appendix № 1 Block the scheme of processes of the organisation of building of objects beginning The SEA П702 4.1. contract conclusion Gene. The director 4.2 Selection руков. Buildings Гл. The engineer. Orders Directors 4.3 Mobilisation Company management СниП, ВСН GPS П501 Working out ППР Certification of technologies Creation инфрастр. (ПТО) (Chief specialists) Platforms (Hands. st-va) The Треб. Контр. 4.4. coordination of the schedule ПТО of building The SEA П704 4.5 Purchase of materials and agent on supply the equipment ППР, ВСН, СНиП Performance of all kinds of Contractors 4.6 works on building The Quality assurance of schedule analysis builds. works Оформл. Will execute. Manufacturers of 4.7 Documentation works of contractors Tests, starting-up and 4.8 Гл. The engineer adjustment works also Builds. A site Commissioning 4.9 Гл. The engineer also Builds. A site The endSEA P707 Sheet 1 6from 6

×