• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Zandria Mims - Architectural Studies
 

Zandria Mims - Architectural Studies

on

  • 665 views

Recent projects ranging from sections/plans to Adobe Photoshop/Illustrator flyers.

Recent projects ranging from sections/plans to Adobe Photoshop/Illustrator flyers.

Statistics

Views

Total Views
665
Views on SlideShare
659
Embed Views
6

Actions

Likes
0
Downloads
3
Comments
0

3 Embeds 6

http://www.linkedin.com 2
http://www.docshut.com 2
http://www.slashdocs.com 2

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Zandria Mims - Architectural Studies Zandria Mims - Architectural Studies Presentation Transcript

    • Zandria Mims
      Louisiana Tech University – Architectural Studies
    • Cabin for Meteorologist
      Rhinoceros 4.0
      Arch 225
      The cabin for a meteorologist evaluates the transformation, constant change and movement of the water cycle. The large central wall assists in controlling the direction of rainfall into a condensed water feature, while the slanted roof also directs water flow. The condensation room, an office/study area for the meteorologist , provides a temperature controlled environment that allows for the circulation of water vapor. Consequently the cabin interacts with the landscape in order to allow the guests to experience the water cycle in its entirety.
    • Cabin for Meteorologist
      Rhinoceros 4.0
      Arch 225
    • Parc de la Villette Project
      Rhinoceros 4.0
      Arch 225
    • Parc de la Villette Project
      Rhinoceros 4.0
      Arch 225
    • Urban Housing Types – Precedent Study
      Adobe Photoshop/Illustrator
      Arch 235
    • Multi - Family Housing Project
      Arch 235
      Project Requirements:
      • 12 – unit multi family housing complex
      • Retail assessable from the main street
      • Community areas
      • Eco-friendly building materials
      • Sustainability
    • Multi - Family Housing
      Arch 235
      North Section B
      West Section
      East Section
    • Adobe Photoshop/Illustrator
    • Adobe Photoshop/Illustrator