Your SlideShare is downloading. ×
Minutes of the meeting 3
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Minutes of the meeting 3

327
views

Published on

Published in: Education, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
327
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1.     MINUTES OF THE MEETING    Group Name: ”SPSU‐Servitium”                Date:17‐May‐2010        Time: 1130hrs         Follow up Action  Member Date Deliverables   Next Meeting  All  4th June2010 at 11  Survey Report Am  &Interviews Will  be uploaded on  ning and you tube.  th   Interviews  SPSU Members  Will start from20 It will be in deliver  May   in the form of  Recording.  th Survey  SPSU Members Will start from 19 A Report will be  May  generated on  analysis of survey.      Member Present:  Servitium team:  1. Viplav Baxi  Faculty Adviser’s(spsu)  1. Deepak Gour  2. Avinash Panwar  Student’s(spsu)  1. Yadu Nandan Shrimali  2. Ayush Jani  3. Pritosh Jain  4. Nikhil Sharma  5. Sparsh Gupta 
  • 2. 6. Kuldeep Purohit  7. Neeraj Samar  8. Pravesh Sharma  Member Absent: No    Agenda:     The Agenda of the meeting was to come up with presentations. Each team had  researched three areas and upload their presentations with examples on  collaborative blog. Every student member had came up with revised ideas and  correction .we had also discussed about surveys and interviews which had to be  taken by the student member which include faculty @SPSU.It was also decided  that mentor, adviser, group leader and team members all have to be present on  our next meeting, with all deliverables.    Discussions & Decisions:  1. Progress and issues about the internship programme can be discussed at:     http://spsuservitium.ning.com/   All team members are advised to have his twitter account as suggested by Viplav.  Each student should tweet login so that they can easily tweet with  #spsuInternship.     2. Survey and Interviews were decided to be taken at SPSU  Viplav had advised us to conduct a survey and interview with in the campus  which will be very much beneficial for our project progress .That survey will  help us to know more about people’s way of thinking from that we will be  having some more ideas.  Viplav had also suggested some faculty name to be interviewed.       
  • 3.   3. General discussion upon presentation:     Some more ideas were presented to Viplav and at the end Viplav had given  some valuable suggestions which is uploaded on  http://spsuservitium.ning.com   and http://www.box.net   on twitter we can  tweet our ideas.      4. Time line:     All team members have to strictly follow the time line and proper schedule    which was suggested by Viplav and which was discussed with our concern  faculty advisor.    5. Next meeting was scheduled:     The schedule time for the next meeting was decided as 4th‐June‐2010 at 1100hrs.  It was also decided that mentor, adviser, group leader and their team members  have to be present on our next meeting. 

×