Utmbirdhouse12'x25'26'

1,322 views

Published on

This is our patented design low cost swiflet house. If Airasia can make everyone fly, we can make everyone affortable a swiflet house

Published in: Real Estate
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,322
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
37
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Utmbirdhouse12'x25'26'

  1. 1. <ul><li>Content </li></ul><ul><li>About the System </li></ul><ul><li>The Need </li></ul><ul><li>The Approach FTW </li></ul><ul><li>The Approach FTS </li></ul><ul><li>The Process of Bird House Construction </li></ul><ul><li>The Benefit FTW & FTS </li></ul><ul><li>Architectural Views </li></ul><ul><li>Estimated Cost and Duration </li></ul>
  2. 2. About the System <ul><li>The construction of bird house using Fast Track Wall (FTW) and Fast Track Slab (FTS) can help to reduce the cost and duration which will then minimize the client’s investment. </li></ul><ul><li>The method of construction using both systems are categorized as an Industrialized Building System. </li></ul><ul><li>FTW is a formwork system used for the construction of load bearing wall. The system eliminate the need to construct column, roof beam, brick wall, lintol and plastering. </li></ul><ul><li>FTS is a system to construct the floor slab of a building . It is a composite system which will avoid the use of timber formwork and hence can reduce the impact towards environment. </li></ul>
  3. 3. The Need <ul><li>Nowadays in Malaysia, the trend to build bird house is becoming more popular. This technology offers an alternative to the conventional method of constructing which is costly and time consuming. </li></ul><ul><li>The fast and affordable bird house construction can assist the clients in reducing the development cost. </li></ul>
  4. 4. The Need (cont…) <ul><li>The development of fast and affordable bird house to the farmers helps to achieve part of the government strategy to increase the per capita income. </li></ul>
  5. 5. The Approach FTW <ul><li>Figure 1 below shows the component of FTW which mainly consist of steel framed structure and plastic panels. </li></ul><ul><li>FTW is an innovative modular formwork system that allows building walls to be build more faster and economical as compared to conventional wall construction. </li></ul><ul><li>FTW can be applied to single and double storey houses/buildings. </li></ul>
  6. 6. The Approach FTW (cont…) <ul><li>Figure 1 </li></ul>
  7. 7. The Approach FTS <ul><li>Figure 2 below shows the component of FTS. </li></ul><ul><li>FTS technology can reduce the time of floor construction by 50%. </li></ul><ul><li>Profiled steel deck made of galvanized steel sheet, rolled into ribbed profiles of recommended depth will serve as a form for wet concrete, thus eliminating the need for false work. When the concrete harden, the deck and concrete will act together to form a composite floor system. No reinforcement bar is needed except minimum wire mesh for crack control, hence an economical and fast construction of slab system is achieved. </li></ul>
  8. 8. The Approach FTS (cont…) Figure 2
  9. 9. The Process of Bird House Construction Prepare Base Raft Foundation with Strip Footing Construct Wall using FTW (Ground to 1 st Floor) Construct Wall Using FTW (1 st floor to roof level) Construct 1 st Floor Slab Using FTS Install 1 st Floor Ceiling
  10. 10. Construct Wall for Chimney using FTW Construct Roof Slab for Chimney Install Roof Metal Deck M&E Work Complete house Construct Roof floor using FTW Install Roof Ceiling The Process of Bird House Construction (cont…)
  11. 11. The Benefit FTW & FTS <ul><li>Reduction in cost between 10% - 20% </li></ul><ul><li>Reduction in construction time between 50% - 70% </li></ul><ul><li>Reduction in number of labor between 40% - 60% </li></ul><ul><li>Better quality and strength since the wall in reinforced. Certainly it can take lateral force such as earthquake. </li></ul><ul><li>Usage of timber (especially formwork) is reduced by 70% - 80% </li></ul><ul><li>It is an industrialized Building System (IBS Category) </li></ul>
  12. 12. The Benefit FTW & FTS (cont…) <ul><li>Green Technology since it replace timber formwork </li></ul><ul><li>No heavy machineries required </li></ul><ul><li>Recyclables mould and can be used more than 30 times </li></ul><ul><li>Portable, light and easy can be lifted by one person. </li></ul><ul><li>Wastage is reduced by more than 50% </li></ul><ul><li>Structural Strength with Less Weight The steel sheet are used with maximum efficiency in the design and fabrication of steel decks, resulting in products with a high strength-to weight ratio. As a result, delivery, erection, and structural framing costs can be reduced. </li></ul>
  13. 13. Architectural Views
  14. 14. Architectural Views (cont…)
  15. 15. Architectural Views (cont…)
  16. 16. <ul><li>Total Estimated Cost </li></ul><ul><li>= RM50,000/bird house of size 25‘ x 12’ </li></ul><ul><li>Total Estimated Workdays </li></ul><ul><li>= 30 days/bird house </li></ul>Estimated Cost and Duration

×