PERMITS
YAWAR HASSAN KHAN




                    1
Types
Various work permits and forms are required for construction and construction-related
service activities such as:
• Penetration Checklist
• Utility Location and Excavation Permit
• Hot Work Permit
• Life Safety Aisle/Exit Impairment Permit
• Confined Space Entry Permit
• High Hazard Construction Safe Work Permit
• Permit for Energized Electrical Safety (PEET)
• Drain Connection / New Discharge Approved Form
• Fire Protection System Impairment
• High Voltage Pre-Job Safety Checklist / Electrical Shutdown
• Utilities Permit for Modification




                                                                                        2
The Seller shall initiate all permits required to perform work at the Kansas
City Plant
and identify permitting requirements in the Project Specific Safety
Plan/Activity Hazard
Analysis (AHA) and Daily Hazard Analysis (DHA). The Seller shall complete
required
permits and obtain all signatures prior to proceeding with construction
work. All permits
shall be up to date and posted at the jobsite.
Hot Work Permits are issued by the KCP Fire Department. High Hazard
Construction
Safe Work Permits, Aisle Impairment Permits, and Utility Location &
Excavation
Permits are issued by Construction Management Associates. Many of these
permits
require advanced notice and coordination prior to work




                                                                               3
High Hazard Construction Safe Work Permits
High Hazard Construction Safe Work Permits are issued for non-routine high
hazard
operations such as but not limited to:
• Scaffold work (any height)
• Steel Erection
• Use of Cranes
• Helicopter Lifts
• Shoring
• Critical / Unusual lifts
• Concrete Masonry Wall Installation (> 8ft)
• High Voltage Work (Over 600V)
• Removal of roofing materials and /or the removal/installation of items that
penetrate the KCP roof.




                                                                                4
Permits may be issued on a daily, weekly, or monthly basis.
Completion of this form
requires participation of contractors with ES&H, Project
Engineer and area owner.




                                                              5
Utility Location & Excavation Permit
The Utility Location & Excavation permit shall be completed any time construction
activity disturbs soil/sub grade, including penetrations through
slabs/floors/concrete/asphalt where the soil/sub grade will be disturbed.
Examples include internal or external excavation, trenching, soil borings, ground rod
installations, or any other construction activity that has the potential to disturb a buried
or encased utility in the soil.
Requesting a permit: Minimum 3-day advanced notice is required to adequately
research and identify hazards that may exist at the excavation site.
These permits are generally issued on a daily or weekly basis depending on the
operation. Permits may be issued for any period that is decided appropriate by the
Project Engineer. Excavations should be reviewed prior to entry and the permits
reviewed weekly as a minimum. Advanced notification is required to allow Buyer to
perform a basic review of potential utilities in the area. Seller is responsible for
performing work in a manner that recognizes utilities may exist that are not identified by
the Buyer’s utility locating equipment (




                                                                                               6
Penetration Checklist
The penetration checklist replaces the class 2 penetration permit. The new
checklist
allows the contractor to locate utilities and re-bar themselves in concrete 4
inches or
less in depth. The checklist shall be completed prior to any saw cutting,
jack
hammering, drilling or penetration of asphalt, concrete ceilings, floors,
columns, beams,
roof ribs, concrete & metal roofs, footings, foundations, exterior slab on
grade (concrete
& asphalt) or suspended slabs (ramps, etc.) (See section 19 and Appendix
Q.)
Exemption - Work under construction the Seller has installed as a part of the
same
project does not require a penetration permi




                                                                                7
Life Safety Aisle/Exit Impairment Permits
Life Safety Aisle/Exit Impairment Permits are issued for tasks that will
require the aisle
to be partially or totally blocked for a period of time. If an aisle must have
on-going
work, then a permit will be issued to identify the work and materials that will
be within
the life safety lines. Basically no more than one half of the aisle (minimum
of 36”) may
be blocked for a partial and the partial impairment must last two hours to
require
permitting. Total blockages require a 24-hour notice, considerable
coordination and
are generally permitted only on off-shift to keep the risk levels lower.
Remember, if you
block less than half the aisle for less than 2 hours, you do not need a permit.




                                                                                  8
Utility System Modification Permit
Utility system modification permit is required for all utility modifications,
including those
that install or remove equipment. The Seller/CM/Planner shall file a permit
with the
designated Utility Engineer prior to construction. The permit shall identify
the system,
location of work, type of work and estimated duration of the work. The
Utility Engineer
shall review and return the request for approval within 3 working days. The
permit shall
reside with the seller until the work is completed and post-installation
testing is
performed. The Utility Engineer has the option to witness post-installation
testing with
24-hour advance notice




                                                                                9
Revocation of Permits
Permits may be revoked for noncompliance violations. Upon
revocation of the permit,
the Seller shall submit in writing to the Project Engineer the
corrective action that will be
taken and action taken to prevent recurrence. If corrective
action is acceptable,
another permit will be issued. Revocation of a permit will
result in the issuance of a
citation.




                                                                 10

More Related Content

Viewers also liked

Bhutto a political biography
Bhutto a political biographyBhutto a political biography
Bhutto a political biographyYAWAR HASSAN KHAN
 
Protecting yourself in the sun
Protecting yourself in the sunProtecting yourself in the sun
Protecting yourself in the sunYAWAR HASSAN KHAN
 
Conducting a job hazard analysis copy - copy (2)
Conducting a job hazard analysis   copy - copy (2)Conducting a job hazard analysis   copy - copy (2)
Conducting a job hazard analysis copy - copy (2)YAWAR HASSAN KHAN
 
Effective accident investigation
Effective accident investigationEffective accident investigation
Effective accident investigationYAWAR HASSAN KHAN
 
Family Medicine History
Family Medicine HistoryFamily Medicine History
Family Medicine HistoryDJ CrissCross
 
GUINOT - Newhite UV Shield SPF 50
GUINOT - Newhite UV Shield SPF 50GUINOT - Newhite UV Shield SPF 50
GUINOT - Newhite UV Shield SPF 50galvadi
 
History taking in Medicine
History taking in MedicineHistory taking in Medicine
History taking in Medicinedrnooruddin
 
Special test for dermatomes and myotomes
Special test for dermatomes and myotomesSpecial test for dermatomes and myotomes
Special test for dermatomes and myotomesTafzz Sailo
 

Viewers also liked (12)

Focus
FocusFocus
Focus
 
736studyguide
736studyguide736studyguide
736studyguide
 
709studyguide
709studyguide709studyguide
709studyguide
 
Bhutto a political biography
Bhutto a political biographyBhutto a political biography
Bhutto a political biography
 
Protecting yourself in the sun
Protecting yourself in the sunProtecting yourself in the sun
Protecting yourself in the sun
 
Pakistan andalliances
Pakistan andalliancesPakistan andalliances
Pakistan andalliances
 
Conducting a job hazard analysis copy - copy (2)
Conducting a job hazard analysis   copy - copy (2)Conducting a job hazard analysis   copy - copy (2)
Conducting a job hazard analysis copy - copy (2)
 
Effective accident investigation
Effective accident investigationEffective accident investigation
Effective accident investigation
 
Family Medicine History
Family Medicine HistoryFamily Medicine History
Family Medicine History
 
GUINOT - Newhite UV Shield SPF 50
GUINOT - Newhite UV Shield SPF 50GUINOT - Newhite UV Shield SPF 50
GUINOT - Newhite UV Shield SPF 50
 
History taking in Medicine
History taking in MedicineHistory taking in Medicine
History taking in Medicine
 
Special test for dermatomes and myotomes
Special test for dermatomes and myotomesSpecial test for dermatomes and myotomes
Special test for dermatomes and myotomes
 

Similar to Permits

Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfRazFazwan
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureHENRY EROMOSELE OIGIANGBE
 
2017 NYC Apartment Management Checklist Free Chapter - Backflow Prevention De...
2017 NYC Apartment Management Checklist Free Chapter - Backflow Prevention De...2017 NYC Apartment Management Checklist Free Chapter - Backflow Prevention De...
2017 NYC Apartment Management Checklist Free Chapter - Backflow Prevention De...VendomeRealEstateMedia
 
Apartment Management Checklist 2017 - Publishing November 2016 - Chapter 4 Ex...
Apartment Management Checklist 2017 - Publishing November 2016 - Chapter 4 Ex...Apartment Management Checklist 2017 - Publishing November 2016 - Chapter 4 Ex...
Apartment Management Checklist 2017 - Publishing November 2016 - Chapter 4 Ex...VendomeRealEstateMedia
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structureMinh Bui Si
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Building act 2006
Building act 2006Building act 2006
Building act 2006sitomise
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105Safe Rise
 
Door testing 10_steps
Door testing 10_stepsDoor testing 10_steps
Door testing 10_stepsIntertek CE
 
010 Permit To Work.ppt
010 Permit To Work.ppt010 Permit To Work.ppt
010 Permit To Work.pptGamingHero6
 
HSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptHSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptGkMechanical
 
Construction plan
Construction planConstruction plan
Construction planMianusama14
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCAnil Singh
 

Similar to Permits (20)

Work permit
Work permitWork permit
Work permit
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdf
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work Procedure
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Site possession
Site possessionSite possession
Site possession
 
2017 NYC Apartment Management Checklist Free Chapter - Backflow Prevention De...
2017 NYC Apartment Management Checklist Free Chapter - Backflow Prevention De...2017 NYC Apartment Management Checklist Free Chapter - Backflow Prevention De...
2017 NYC Apartment Management Checklist Free Chapter - Backflow Prevention De...
 
Apartment Management Checklist 2017 - Publishing November 2016 - Chapter 4 Ex...
Apartment Management Checklist 2017 - Publishing November 2016 - Chapter 4 Ex...Apartment Management Checklist 2017 - Publishing November 2016 - Chapter 4 Ex...
Apartment Management Checklist 2017 - Publishing November 2016 - Chapter 4 Ex...
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Building act 2006
Building act 2006Building act 2006
Building act 2006
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105
 
EESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim WebsterEESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim Webster
 
Door testing 10_steps
Door testing 10_stepsDoor testing 10_steps
Door testing 10_steps
 
010 Permit To Work.ppt
010 Permit To Work.ppt010 Permit To Work.ppt
010 Permit To Work.ppt
 
HSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptHSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.ppt
 
Construction plan
Construction planConstruction plan
Construction plan
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
 
wsa
wsawsa
wsa
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 

More from YAWAR HASSAN KHAN

More from YAWAR HASSAN KHAN (20)

Zulfikar ali bhutto memoir chakir_junejo
Zulfikar ali bhutto memoir chakir_junejoZulfikar ali bhutto memoir chakir_junejo
Zulfikar ali bhutto memoir chakir_junejo
 
Zulfikar ali bhutto recollections and remembrances
Zulfikar ali bhutto recollections and remembrancesZulfikar ali bhutto recollections and remembrances
Zulfikar ali bhutto recollections and remembrances
 
Zulfikar ali bhutto politics of charisma
Zulfikar ali bhutto politics of charismaZulfikar ali bhutto politics of charisma
Zulfikar ali bhutto politics of charisma
 
Zulfi my friend urdu
Zulfi my friend urduZulfi my friend urdu
Zulfi my friend urdu
 
Za bhutto architectofnewpakistan
Za bhutto architectofnewpakistanZa bhutto architectofnewpakistan
Za bhutto architectofnewpakistan
 
Zab jan mar1073
Zab jan mar1073Zab jan mar1073
Zab jan mar1073
 
Z a bhutto notes from death cell
Z a bhutto notes from death cellZ a bhutto notes from death cell
Z a bhutto notes from death cell
 
Was bhutto killed_before_hanging
Was bhutto killed_before_hangingWas bhutto killed_before_hanging
Was bhutto killed_before_hanging
 
Third world-new-directions-bhutto
Third world-new-directions-bhuttoThird world-new-directions-bhutto
Third world-new-directions-bhutto
 
The pakistan papers
The pakistan papersThe pakistan papers
The pakistan papers
 
Speeches1957 65
Speeches1957 65Speeches1957 65
Speeches1957 65
 
Speeches before the security council
Speeches before the security councilSpeeches before the security council
Speeches before the security council
 
Reshaping foreign policy
Reshaping foreign policyReshaping foreign policy
Reshaping foreign policy
 
Pakistan and bhutto
Pakistan and bhuttoPakistan and bhutto
Pakistan and bhutto
 
My pakistan
My pakistanMy pakistan
My pakistan
 
Marching towards democracy
Marching towards democracyMarching towards democracy
Marching towards democracy
 
Last dayf of premier bhutto
Last dayf of premier bhuttoLast dayf of premier bhutto
Last dayf of premier bhutto
 
Interview with-history
Interview with-historyInterview with-history
Interview with-history
 
He was not_hanged
He was not_hangedHe was not_hanged
He was not_hanged
 
Foriegn policy of pakistan
Foriegn policy of pakistanForiegn policy of pakistan
Foriegn policy of pakistan
 

Permits

  • 2. Types Various work permits and forms are required for construction and construction-related service activities such as: • Penetration Checklist • Utility Location and Excavation Permit • Hot Work Permit • Life Safety Aisle/Exit Impairment Permit • Confined Space Entry Permit • High Hazard Construction Safe Work Permit • Permit for Energized Electrical Safety (PEET) • Drain Connection / New Discharge Approved Form • Fire Protection System Impairment • High Voltage Pre-Job Safety Checklist / Electrical Shutdown • Utilities Permit for Modification 2
  • 3. The Seller shall initiate all permits required to perform work at the Kansas City Plant and identify permitting requirements in the Project Specific Safety Plan/Activity Hazard Analysis (AHA) and Daily Hazard Analysis (DHA). The Seller shall complete required permits and obtain all signatures prior to proceeding with construction work. All permits shall be up to date and posted at the jobsite. Hot Work Permits are issued by the KCP Fire Department. High Hazard Construction Safe Work Permits, Aisle Impairment Permits, and Utility Location & Excavation Permits are issued by Construction Management Associates. Many of these permits require advanced notice and coordination prior to work 3
  • 4. High Hazard Construction Safe Work Permits High Hazard Construction Safe Work Permits are issued for non-routine high hazard operations such as but not limited to: • Scaffold work (any height) • Steel Erection • Use of Cranes • Helicopter Lifts • Shoring • Critical / Unusual lifts • Concrete Masonry Wall Installation (> 8ft) • High Voltage Work (Over 600V) • Removal of roofing materials and /or the removal/installation of items that penetrate the KCP roof. 4
  • 5. Permits may be issued on a daily, weekly, or monthly basis. Completion of this form requires participation of contractors with ES&H, Project Engineer and area owner. 5
  • 6. Utility Location & Excavation Permit The Utility Location & Excavation permit shall be completed any time construction activity disturbs soil/sub grade, including penetrations through slabs/floors/concrete/asphalt where the soil/sub grade will be disturbed. Examples include internal or external excavation, trenching, soil borings, ground rod installations, or any other construction activity that has the potential to disturb a buried or encased utility in the soil. Requesting a permit: Minimum 3-day advanced notice is required to adequately research and identify hazards that may exist at the excavation site. These permits are generally issued on a daily or weekly basis depending on the operation. Permits may be issued for any period that is decided appropriate by the Project Engineer. Excavations should be reviewed prior to entry and the permits reviewed weekly as a minimum. Advanced notification is required to allow Buyer to perform a basic review of potential utilities in the area. Seller is responsible for performing work in a manner that recognizes utilities may exist that are not identified by the Buyer’s utility locating equipment ( 6
  • 7. Penetration Checklist The penetration checklist replaces the class 2 penetration permit. The new checklist allows the contractor to locate utilities and re-bar themselves in concrete 4 inches or less in depth. The checklist shall be completed prior to any saw cutting, jack hammering, drilling or penetration of asphalt, concrete ceilings, floors, columns, beams, roof ribs, concrete & metal roofs, footings, foundations, exterior slab on grade (concrete & asphalt) or suspended slabs (ramps, etc.) (See section 19 and Appendix Q.) Exemption - Work under construction the Seller has installed as a part of the same project does not require a penetration permi 7
  • 8. Life Safety Aisle/Exit Impairment Permits Life Safety Aisle/Exit Impairment Permits are issued for tasks that will require the aisle to be partially or totally blocked for a period of time. If an aisle must have on-going work, then a permit will be issued to identify the work and materials that will be within the life safety lines. Basically no more than one half of the aisle (minimum of 36”) may be blocked for a partial and the partial impairment must last two hours to require permitting. Total blockages require a 24-hour notice, considerable coordination and are generally permitted only on off-shift to keep the risk levels lower. Remember, if you block less than half the aisle for less than 2 hours, you do not need a permit. 8
  • 9. Utility System Modification Permit Utility system modification permit is required for all utility modifications, including those that install or remove equipment. The Seller/CM/Planner shall file a permit with the designated Utility Engineer prior to construction. The permit shall identify the system, location of work, type of work and estimated duration of the work. The Utility Engineer shall review and return the request for approval within 3 working days. The permit shall reside with the seller until the work is completed and post-installation testing is performed. The Utility Engineer has the option to witness post-installation testing with 24-hour advance notice 9
  • 10. Revocation of Permits Permits may be revoked for noncompliance violations. Upon revocation of the permit, the Seller shall submit in writing to the Project Engineer the corrective action that will be taken and action taken to prevent recurrence. If corrective action is acceptable, another permit will be issued. Revocation of a permit will result in the issuance of a citation. 10