SlideShare a Scribd company logo
1 of 24
Download to read offline
Free 12 x 8 Shed Plan
With Illustrations, Blueprints & Step By Step Details
Brought To You By:
MyShedPlans
Click Here To Download 12,000 Shed Plans >>
eBay ammo1980
eBay ammo1980
12’ x 8’ Basic Shed
This 8 × 12-ft. shed features a simple gable roof, double doors, and
side and rear windows for natural lighting. With full-height walls and
doors, there's ample room for storing large items or creating a
comfortable work space. An optional wood ramp helps in moving
lawn mowers and other heavy equipment.
The shed's simple construction makes it especially adaptable for
different uses. For example, you can easily frame in additional
windows—to use the shed as a workshop or potting shed—or omit
all of the windows and devote the space entirely to secure storage.
The finish materials for the basic shed also are true to its name:
asphalt roof shingles, plywood siding, and simple trim details are
appropriately practical for this classic outbuilding design. You can
purchase prehung doors or build your own using the project plans.
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
Materials
Description Quantity/Size Material
Foundation
Drainage
material 1.4 cu. yd.
Compactible
gravel
Skids 3 @ 12'-0"
4 × 4 treated
timbers
Floor Framing
Rim joists 2 @ 12'-0"
2 × 6 pressure-
treated
joists 10 @ 8'-0"
2 × 6 pressure-
treated
Floor
sheathing
3 sheets, 4 ×
8'
3/4" tongue-&-
groove ext.-grade
plywood
Joist clip
angles 20
3" × 3" × 3" ×
16-gauge
galvanized
Wall Framing
Bottom
plates
2 @ 12'-0", 1
@ 8'-0" 2 × 4
Top plates
4 @ 12'-0", 4
@ 8'-0" 2 × 4
Studs 40 @ 92 5/8" 2 × 4
Headers
2 @ 10'-0'', 2
@ 6'-0" 2 × 6
Header
spacers
1 @ 9'-0", 1 @
6'-0"
1/2" plywood—5"
wide
Gable Wall Framing
Top plates 2 @ 8'-0" 2 × 4
Studs 2 @ 8'-0" 2 × 4
Roof Framing
Rafters 22 @ 6'-0" 2 × 6
Metal
anchors—
rafters 10, with nails Simpson H1
Rafter ties 3 @ 8'-0" 2 × 4
Ridge board 1 @ 14'-0" 2 × 8
Lookouts 1 @ 8'-0" 2 × 6
Subfascia
1 @ 8'-0", 2 @
10'-0'' 2 × 6
Soffit nailers 3 @ 8'-0" 2 × 2
Exterior Finishes
Plywood
siding
10 sheets @ 4
× 9'
5/8" texture 1-11
plywood siding,
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
grooves 8" o.c.
Z-flashing
2 pieces @ 8
ft.
Galvanized—18
gauge
Wall &
corner trim 10 @ 10'-0" 1 × 4 S4S cedar
Fascia 8 @ 8'-0" 1 × 8 S4S cedar
Plywood
soffits
2 sheets @ 4 ×
8'
3/8" cedar or fir
plywood
Soffit vents 4 @ 4 × 12"
Louver with bug
screen
Flashing
(door/window
trim) 8 linear ft.
Galvanized—18
gauge
Roofing
Roof
sheathing
6 sheets @ 4 ×
8'
1/2" ext.-grade
plywood
Asphalt
shingles 150 sq. ft.
250# per square
(min.)
15# building
paper 150 sq. ft.
Metal drip
edge
2 @ 14'-0", 4
@ 6'-0" Galvanized metal
Roof vents
(optional) 2 units
Door
Frame
2 @ 8'-0", 1 @
6'-0"
3/4 × 4 1/4"
(actual) S4S
cedar
Stops
2 @ 8'-0", 1 @
6'-0" 1 × 2 S4S cedar
Panel
material 12 @ 8'-0"
1 × 6 T&G V-joint
S4S cedar
Z-brace 4 @ 6'-0" 1 × 6 S4S cedar
Construction
adhesive 1 tube
Exterior trim
2 @ 8'-0", 1 @
6'-0" 1 × 4 S4S cedar
Interior trim
(optional)
2 @ 8'-0", 1 @
6'-0" 1 × 2 S4S cedar
Strap hinges 6, with screws Exterior hinges
Windows
Frames 5 @ 6'-0"
3/4 × 4 1/4"
(actual) S4S cedar
Mullion 1 @ 3'-0" 2 × 4 S4S cedar
Stops 10 @ 6'-0" 1 × 2 S4S cedar
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
Glazing tape 30 linear ft. Glazing tape
Glass
3 pieces—field
measure
1/4" clear,
tempered
Window
muntins
(optional) 3 @ 8'-0" 1 × 1 S4S cedar
Exterior trim 5 @ 8'-0" 1 × 4 S4S cedar
Interior trim
(optional) 5 @ 8'-0" 1 × 2 S4S cedar
Ramp (Optional)
Pads 2 @ 6'-0"
2 × 8 pressure-
treated
Stringers 1 @ 8'-0"
2 × 8 pressure-
treated
Decking 7 @ 6'-0"
2 × 4 pressure-
treated
Fasteners
16d common
nails 16 lbs.
10d common
nails 1 lb.
10d
galvanized
casing nails 1 lb.
8d common
nails 1/2 lb.
8d box nails 3 lbs.
8d
galvanized
box nails 1 1/2 lbs.
8d
galvanized
finish nails 7 lbs.
3d
galvanized
box nails 1/4 lb.
7/8"
galvanized
roofing nails 2 lbs
1 1/2" joist
hanger nails 80 nails
1 1/4" wood
screws 70 screws
3 1/2" deck
screws 12 screws
3" deck
screws 50 screws
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
2 1/2" deck
screws 40 screws
1 1/4" deck
screws 30 screws
Silicone-
latex caulk 1 tube
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
BUILDING THE BASIC SHED
Step A: Build the Foundation & Floor Frame
1. Excavate the building site and add a 4" layer of compactible
gravel. If desired, add an extension to the base for the optional
wood ramp. Tamp the gravel thoroughly, making sure it is flat and
level.
2. Cut three 4 × 4 treated timber skids at 144". Arrange and level
the skids on the gravel bed, following the FLOOR FRAMING PLAN.
3. Cut two 2 × 6 rim joists at 144" and ten joists at 93". Mark the
joist layout onto the rim joists, following the plan. Assemble frame
with 16d galv. common nails; be sure to check each joist for
crowning and install it with the crowned edge up.
4. Set the floor frame on top of the skids and measure the
diagonals to make sure it's square. Install metal clip angles at each
joist along the two outer skids, using 1 1/2" joist hanger nails and
16d galv. common nails, and toenail each joist to the center skid
with 16d galv. nails.
5. Install the tongue-and-groove floor sheathing, starting with a full
sheet at one corner of the frame. Use 8d galv. nails driven every 6"
along the edges and every 12" in the field.
Secure the joists to the outer skids with angles. Drive hanger nails
into the joists and 16d nails into the skids.
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
Frame and raise the walls, then fasten adjacent walls together at
the corner studs.
Step B: Frame the Walls
1. Snap chalk lines on the floor for the wall plates.
2. Cut the 2 × 4 wall plates: four at 144" for the side walls and four
at 89" for the front and back walls.
3. Mark the stud layouts onto the plates following the FLOOR PLAN.
4. Cut twenty-seven studs at 92 5/8", and cut six at 81 1/2" to
serve as jack studs.
5. Build three headers with 2 × 6s and 1/2" plywood: one at 65" for
the door opening, one at 67" for the right side window, and one at
35" for the rear window.
6. Assemble, raise, and brace the walls one at a time, then add the
double top plates.
Step C: Frame the Roof
1. Cut two pattern rafters, following the RAFTER TEMPLATE. Test-fit
the rafters using a 2 × 8 spacer block, then cut the remaining
twelve common rafters. Cut eight rafters for the gable end
overhangs—these do not have bird's mouth cuts.
2. Cut the 2 × 8 ridge board at 156". Draw the rafter layout onto
the top plates and ridge board, using 16" on-center spacing. The
outsides of the outer common rafters should be 6" from the ends of
the ridge board.
3. Install the rafters. Reinforce the rafter-wall connection with metal
anchors—install them on all but the outer common rafters.
4. Cut three 2 × 4 rafter ties at 96", and clip the top outer corners
so they won't project above the rafters. Position each tie next to a
pair of rafters as shown in the FRAMING ELEVATIONS. Facenail each
tie end to the rafter with three 10d nails, then toenail each tie end
to the top wall plate with two 8d nails.
5. Cut the gable-wall plates to reach from the ridge to the wall
plates. Install the plates with their outside edges flush with the
outer common rafters. Cut and install the gable studs, following the
FRAMING ELEVATIONS.
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
Fasten the bottom ends of the common rafters to the wall plates
with metal anchors.
Attach lookouts to four of the overhang rafters, then nail the
overhang rafters to the outer common rafters.
Step D: Build the Gable Overhangs
1. Cut twelve 2 × 6 lookouts at 3". Endnail the lookouts to each of
the inner overhang rafters, using 16" on-center spacing (see the
GABLE OVERHANG DETAIL).
2. Facenail the inner overhang rafters to the outer common rafters
with 10d nails.
3. Fasten the outer overhang rafters to the ridge and lookouts,
using 16d nails.
Step E: Install the Fascia, Sheathing & Roofing
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
1. Cut and install the 2 × 6 subfascia along the eaves (see the EAVE
DETAIL). Keep the ends flush with the outsides of the overhang
rafters, and the bottom edges flush with the bottom rafter edges;
use 16d nails.
2. Install the 1 × 8 fascia along the gable overhangs, then along the
eaves, holding it 1/2" above the rafters so it will be flush with the
sheathing; use 6d galv. finish nails.
3. Install the 1/2" plywood sheathing, starting at a lower corner of
the roof; use 8d box nails driven every 6" along the edges and
every 12" in the field of the sheets.
4. Attach metal drip edge along the eaves, then apply 15# building
paper over the sheathing. Add dripedge along the gable ends, over
the paper.
5. Install the asphalt shingles, starting at the eave edge. If desired,
install roof vents.
Install the plywood roof sheathing after installing the fascia. Nail
every 6" at the edges and every 12" in the field.
Rip the soffit panels to fit between the wall plates and fascia. Fasten
the panels to the nailers, rafters, and subfascia.
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
Step F: Install the Soffits & Siding
1. Cut twelve 2 × 2 nailers to fit between the rafters, as shown in
the EAVE DETAIL. Fasten the nailers between the rafters with 10d
facenails or 8d toenails.
2. Rip the 3/8" plywood soffit panels to fit between the wall framing
and the fascia. Fasten the soffits to the rafters with 3d galv. box
nails.
3. Cut holes for four soffit vents: locate one vent in each of the two
outer rafter bays, along the eave, on both sides of the building.
Install the soffit vents.
4. Install the plywood siding, using 8d galv. finish nails. Butt the top
edges of the siding against the soffits. Don't nail the siding to the
rear-window and door headers in this step. At the gable ends,
install Z-flashing along the top edge of siding, then continue the
siding up to the soffits.
Note: Along the side walls, 8-ft. siding will cover the floor plywood
by about 1/2" (this is necessary); if you want the siding to cover
the floor framing, use 4 × 9-ft. sheets.
Step G: Build & Install the Doors
1. Cut out the bottom plate from the door opening.
2. Cut the door frame pieces from 3/4" × 4 1/2" (actual dimension)
cedar: cut the head jamb at 61 1/4" and the side jambs at 81 7/8".
Assemble the frame by screwing through the head jamb and into
the side jambs with 2 1/2" deck screws.
3. Cut 1 × 2 stops and install them inside the jambs with 1 1/4"
deck screws or 3d galv. finish nails. If the doors will swing out,
install the stops 2 1/4" from the outside edges of the frame; if
they'll swing in, install the stops 2 1/4" from the inside edges.
4. Install the door frame in the rough opening, using shims and 10d
galv. casing nails. Make sure the frame is square and plumb.
5. Cut twelve pieces of 1 × 6 tongue-&-groove boards at 81 3/4".
For each door, fit together six boards with their ends flush, then
mark the two end boards for trimming so that the total width is 30".
Trim the end boards.
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
6. Cut the Z-brace boards following the DOOR ELEVATIONS. Lay the
doors on a flat surface and attach the brace boards using
construction adhesive and l 1/4" wood screws.
7. Install the hinges and hang the door, using shims to set the gaps
at the bottom and top of each door.
8. Install flashing above the door, nail-off the siding, then install the
1 × 4 door trim, using 8d galv. finish nails.
Use pairs of tapered shims to plumb and level the door frame in the
rough opening.
Assemble the window frames with screws. Add a 2 × 4 mullion in
the center of the side window frame.
Step H: Build & Install the Windows & Trim
Note: If you've bought prehung windows for the shed, install them
following the manufacturer's directions. To build homemade
windows, use the following directions.
1. For each window, cut the 3/4" × 4 1/4" frame stock to form a
rectangular frame with outer dimensions that are 1/2" shorter and
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
narrower than the rough opening. Assemble the frame with 2 1/2"
deck screws. Cut and install a 2 × 4 mullion in the center of the
frame for the side-wall window.
2. Install each window frame in its rough opening, using shims and
a level to make sure the frame is plumb and level and the jambs
are straight. Fasten the frame with 10d galv. casing nails.
3. Cut the 1 × 2 stops. Bevel the outer sill stops as shown in the
WINDOW JAMB DETAIL. Attach the inner stops with 6d galv. finish
nails. Order the glass to fit.
4. Install the glass and outer stops, applying glazing tape to the
stops on both sides of the glass. Install the 1 × 4 window trim.
5. Install the horizontal 1 × 4 trim as shown in the ELEVATIONS.
Fasten the trim with 8d galv. finish nails.
6. Install the 1 × 4 corner trim so that it butts against the
horizontal trim and extends to the bottom edges of the siding.
7. Caulk along all trim joints, where trim meets siding, and around
the door and window trim.
Step I: Build the Ramp (Optional)
Determining the width and length (and thus the slope) of the ramp
is up to you, but here is the basic construction procedure:
1. Determine the best slope for the ramp using boards or plywood
set on the ground and the shed floor. Mark the ground to represent
the end of the ramp.
2. Cut two 2 × 8 pads to the full width of the ramp.
3. Measure the distance from the ground to the shed floor; subtract
2" from that dimension to get the height of the tapered stringers.
4. Use the ground marking to determine the length of the
stringers—be sure to account for the 1 1/2" thickness of the
decking. Cut the tapered stringers from 2 × 8 lumber: cut one for
each end and one for every 16" to 24" in between.
5. Attach the pads to the stringers with 16d galv. nails driven
through the bottom faces of the pads and into the stringers.
www.MyShedPlans.com
www.MyShedPlans.com
eBay ammo1980
eBay ammo1980
6. Cut 2 × 4s for the ramp decking—the number needed depends
on the length of the sloping sides of the stringers. Allow for a 1/8"
gap between decking boards when calculating the number needed.
7. Attach the decking boards to the supports with 16d galv. nails or
3" deck screws, maintaining a 1/8" gap between boards.
8. Set the ramp in place against the shed and fasten it by toenailing
through the end stringers and top decking board with 3 1/2" deck
screws.
Build the ramp with pressure-treated 2 × 8s and 2 × 4s, following
the plan's size or building it to a custom size.
www.MyShedPlans.com
www.MyShedPlans.com
Did you enjoyed this plan?
If so, visit MyShedPlans now and download over 12,000 plans and
blueprints
This 12 x 8 Shed Plan Is Brought To You By
MyShedPlans
Click Here To Download Over 12,000 Shed Plans >>
Visit MyShedPlans Today And See How Easy It Is To
Build Beautiful Sheds With Easy-To-Follow Blueprints!

More Related Content

Recently uploaded

毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...ttt fff
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作7tz4rjpd
 
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作aecnsnzk
 
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic global solution
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...mrchrns005
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxGeneral Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxmarckustrevion
 
Apresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoApresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoCarolTelles6
 
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一A SSS
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 

Recently uploaded (20)

毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学欧克莱尔分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#...
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作
 
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
 
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing services
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxGeneral Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptx
 
Apresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus RizzoApresentação Clamo Cristo -letra música Matheus Rizzo
Apresentação Clamo Cristo -letra música Matheus Rizzo
 
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 

Featured

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationErica Santiago
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellSaba Software
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming LanguageSimplilearn
 

Featured (20)

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
 

12 X 8 Shed Plans - Fully Detailed and Complete with Diagrams

  • 1. Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details Brought To You By: MyShedPlans Click Here To Download 12,000 Shed Plans >>
  • 2. eBay ammo1980 eBay ammo1980 12’ x 8’ Basic Shed This 8 × 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a comfortable work space. An optional wood ramp helps in moving lawn mowers and other heavy equipment. The shed's simple construction makes it especially adaptable for different uses. For example, you can easily frame in additional windows—to use the shed as a workshop or potting shed—or omit all of the windows and devote the space entirely to secure storage. The finish materials for the basic shed also are true to its name: asphalt roof shingles, plywood siding, and simple trim details are appropriately practical for this classic outbuilding design. You can purchase prehung doors or build your own using the project plans. www.MyShedPlans.com www.MyShedPlans.com
  • 3. eBay ammo1980 eBay ammo1980 Materials Description Quantity/Size Material Foundation Drainage material 1.4 cu. yd. Compactible gravel Skids 3 @ 12'-0" 4 × 4 treated timbers Floor Framing Rim joists 2 @ 12'-0" 2 × 6 pressure- treated joists 10 @ 8'-0" 2 × 6 pressure- treated Floor sheathing 3 sheets, 4 × 8' 3/4" tongue-&- groove ext.-grade plywood Joist clip angles 20 3" × 3" × 3" × 16-gauge galvanized Wall Framing Bottom plates 2 @ 12'-0", 1 @ 8'-0" 2 × 4 Top plates 4 @ 12'-0", 4 @ 8'-0" 2 × 4 Studs 40 @ 92 5/8" 2 × 4 Headers 2 @ 10'-0'', 2 @ 6'-0" 2 × 6 Header spacers 1 @ 9'-0", 1 @ 6'-0" 1/2" plywood—5" wide Gable Wall Framing Top plates 2 @ 8'-0" 2 × 4 Studs 2 @ 8'-0" 2 × 4 Roof Framing Rafters 22 @ 6'-0" 2 × 6 Metal anchors— rafters 10, with nails Simpson H1 Rafter ties 3 @ 8'-0" 2 × 4 Ridge board 1 @ 14'-0" 2 × 8 Lookouts 1 @ 8'-0" 2 × 6 Subfascia 1 @ 8'-0", 2 @ 10'-0'' 2 × 6 Soffit nailers 3 @ 8'-0" 2 × 2 Exterior Finishes Plywood siding 10 sheets @ 4 × 9' 5/8" texture 1-11 plywood siding, www.MyShedPlans.com www.MyShedPlans.com
  • 4. eBay ammo1980 eBay ammo1980 grooves 8" o.c. Z-flashing 2 pieces @ 8 ft. Galvanized—18 gauge Wall & corner trim 10 @ 10'-0" 1 × 4 S4S cedar Fascia 8 @ 8'-0" 1 × 8 S4S cedar Plywood soffits 2 sheets @ 4 × 8' 3/8" cedar or fir plywood Soffit vents 4 @ 4 × 12" Louver with bug screen Flashing (door/window trim) 8 linear ft. Galvanized—18 gauge Roofing Roof sheathing 6 sheets @ 4 × 8' 1/2" ext.-grade plywood Asphalt shingles 150 sq. ft. 250# per square (min.) 15# building paper 150 sq. ft. Metal drip edge 2 @ 14'-0", 4 @ 6'-0" Galvanized metal Roof vents (optional) 2 units Door Frame 2 @ 8'-0", 1 @ 6'-0" 3/4 × 4 1/4" (actual) S4S cedar Stops 2 @ 8'-0", 1 @ 6'-0" 1 × 2 S4S cedar Panel material 12 @ 8'-0" 1 × 6 T&G V-joint S4S cedar Z-brace 4 @ 6'-0" 1 × 6 S4S cedar Construction adhesive 1 tube Exterior trim 2 @ 8'-0", 1 @ 6'-0" 1 × 4 S4S cedar Interior trim (optional) 2 @ 8'-0", 1 @ 6'-0" 1 × 2 S4S cedar Strap hinges 6, with screws Exterior hinges Windows Frames 5 @ 6'-0" 3/4 × 4 1/4" (actual) S4S cedar Mullion 1 @ 3'-0" 2 × 4 S4S cedar Stops 10 @ 6'-0" 1 × 2 S4S cedar www.MyShedPlans.com www.MyShedPlans.com
  • 5. eBay ammo1980 eBay ammo1980 Glazing tape 30 linear ft. Glazing tape Glass 3 pieces—field measure 1/4" clear, tempered Window muntins (optional) 3 @ 8'-0" 1 × 1 S4S cedar Exterior trim 5 @ 8'-0" 1 × 4 S4S cedar Interior trim (optional) 5 @ 8'-0" 1 × 2 S4S cedar Ramp (Optional) Pads 2 @ 6'-0" 2 × 8 pressure- treated Stringers 1 @ 8'-0" 2 × 8 pressure- treated Decking 7 @ 6'-0" 2 × 4 pressure- treated Fasteners 16d common nails 16 lbs. 10d common nails 1 lb. 10d galvanized casing nails 1 lb. 8d common nails 1/2 lb. 8d box nails 3 lbs. 8d galvanized box nails 1 1/2 lbs. 8d galvanized finish nails 7 lbs. 3d galvanized box nails 1/4 lb. 7/8" galvanized roofing nails 2 lbs 1 1/2" joist hanger nails 80 nails 1 1/4" wood screws 70 screws 3 1/2" deck screws 12 screws 3" deck screws 50 screws www.MyShedPlans.com www.MyShedPlans.com
  • 6. eBay ammo1980 eBay ammo1980 2 1/2" deck screws 40 screws 1 1/4" deck screws 30 screws Silicone- latex caulk 1 tube www.MyShedPlans.com www.MyShedPlans.com
  • 16. eBay ammo1980 eBay ammo1980 BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood ramp. Tamp the gravel thoroughly, making sure it is flat and level. 2. Cut three 4 × 4 treated timber skids at 144". Arrange and level the skids on the gravel bed, following the FLOOR FRAMING PLAN. 3. Cut two 2 × 6 rim joists at 144" and ten joists at 93". Mark the joist layout onto the rim joists, following the plan. Assemble frame with 16d galv. common nails; be sure to check each joist for crowning and install it with the crowned edge up. 4. Set the floor frame on top of the skids and measure the diagonals to make sure it's square. Install metal clip angles at each joist along the two outer skids, using 1 1/2" joist hanger nails and 16d galv. common nails, and toenail each joist to the center skid with 16d galv. nails. 5. Install the tongue-and-groove floor sheathing, starting with a full sheet at one corner of the frame. Use 8d galv. nails driven every 6" along the edges and every 12" in the field. Secure the joists to the outer skids with angles. Drive hanger nails into the joists and 16d nails into the skids. www.MyShedPlans.com www.MyShedPlans.com
  • 17. eBay ammo1980 eBay ammo1980 Frame and raise the walls, then fasten adjacent walls together at the corner studs. Step B: Frame the Walls 1. Snap chalk lines on the floor for the wall plates. 2. Cut the 2 × 4 wall plates: four at 144" for the side walls and four at 89" for the front and back walls. 3. Mark the stud layouts onto the plates following the FLOOR PLAN. 4. Cut twenty-seven studs at 92 5/8", and cut six at 81 1/2" to serve as jack studs. 5. Build three headers with 2 × 6s and 1/2" plywood: one at 65" for the door opening, one at 67" for the right side window, and one at 35" for the rear window. 6. Assemble, raise, and brace the walls one at a time, then add the double top plates. Step C: Frame the Roof 1. Cut two pattern rafters, following the RAFTER TEMPLATE. Test-fit the rafters using a 2 × 8 spacer block, then cut the remaining twelve common rafters. Cut eight rafters for the gable end overhangs—these do not have bird's mouth cuts. 2. Cut the 2 × 8 ridge board at 156". Draw the rafter layout onto the top plates and ridge board, using 16" on-center spacing. The outsides of the outer common rafters should be 6" from the ends of the ridge board. 3. Install the rafters. Reinforce the rafter-wall connection with metal anchors—install them on all but the outer common rafters. 4. Cut three 2 × 4 rafter ties at 96", and clip the top outer corners so they won't project above the rafters. Position each tie next to a pair of rafters as shown in the FRAMING ELEVATIONS. Facenail each tie end to the rafter with three 10d nails, then toenail each tie end to the top wall plate with two 8d nails. 5. Cut the gable-wall plates to reach from the ridge to the wall plates. Install the plates with their outside edges flush with the outer common rafters. Cut and install the gable studs, following the FRAMING ELEVATIONS. www.MyShedPlans.com www.MyShedPlans.com
  • 18. eBay ammo1980 eBay ammo1980 Fasten the bottom ends of the common rafters to the wall plates with metal anchors. Attach lookouts to four of the overhang rafters, then nail the overhang rafters to the outer common rafters. Step D: Build the Gable Overhangs 1. Cut twelve 2 × 6 lookouts at 3". Endnail the lookouts to each of the inner overhang rafters, using 16" on-center spacing (see the GABLE OVERHANG DETAIL). 2. Facenail the inner overhang rafters to the outer common rafters with 10d nails. 3. Fasten the outer overhang rafters to the ridge and lookouts, using 16d nails. Step E: Install the Fascia, Sheathing & Roofing www.MyShedPlans.com www.MyShedPlans.com
  • 19. eBay ammo1980 eBay ammo1980 1. Cut and install the 2 × 6 subfascia along the eaves (see the EAVE DETAIL). Keep the ends flush with the outsides of the overhang rafters, and the bottom edges flush with the bottom rafter edges; use 16d nails. 2. Install the 1 × 8 fascia along the gable overhangs, then along the eaves, holding it 1/2" above the rafters so it will be flush with the sheathing; use 6d galv. finish nails. 3. Install the 1/2" plywood sheathing, starting at a lower corner of the roof; use 8d box nails driven every 6" along the edges and every 12" in the field of the sheets. 4. Attach metal drip edge along the eaves, then apply 15# building paper over the sheathing. Add dripedge along the gable ends, over the paper. 5. Install the asphalt shingles, starting at the eave edge. If desired, install roof vents. Install the plywood roof sheathing after installing the fascia. Nail every 6" at the edges and every 12" in the field. Rip the soffit panels to fit between the wall plates and fascia. Fasten the panels to the nailers, rafters, and subfascia. www.MyShedPlans.com www.MyShedPlans.com
  • 20. eBay ammo1980 eBay ammo1980 Step F: Install the Soffits & Siding 1. Cut twelve 2 × 2 nailers to fit between the rafters, as shown in the EAVE DETAIL. Fasten the nailers between the rafters with 10d facenails or 8d toenails. 2. Rip the 3/8" plywood soffit panels to fit between the wall framing and the fascia. Fasten the soffits to the rafters with 3d galv. box nails. 3. Cut holes for four soffit vents: locate one vent in each of the two outer rafter bays, along the eave, on both sides of the building. Install the soffit vents. 4. Install the plywood siding, using 8d galv. finish nails. Butt the top edges of the siding against the soffits. Don't nail the siding to the rear-window and door headers in this step. At the gable ends, install Z-flashing along the top edge of siding, then continue the siding up to the soffits. Note: Along the side walls, 8-ft. siding will cover the floor plywood by about 1/2" (this is necessary); if you want the siding to cover the floor framing, use 4 × 9-ft. sheets. Step G: Build & Install the Doors 1. Cut out the bottom plate from the door opening. 2. Cut the door frame pieces from 3/4" × 4 1/2" (actual dimension) cedar: cut the head jamb at 61 1/4" and the side jambs at 81 7/8". Assemble the frame by screwing through the head jamb and into the side jambs with 2 1/2" deck screws. 3. Cut 1 × 2 stops and install them inside the jambs with 1 1/4" deck screws or 3d galv. finish nails. If the doors will swing out, install the stops 2 1/4" from the outside edges of the frame; if they'll swing in, install the stops 2 1/4" from the inside edges. 4. Install the door frame in the rough opening, using shims and 10d galv. casing nails. Make sure the frame is square and plumb. 5. Cut twelve pieces of 1 × 6 tongue-&-groove boards at 81 3/4". For each door, fit together six boards with their ends flush, then mark the two end boards for trimming so that the total width is 30". Trim the end boards. www.MyShedPlans.com www.MyShedPlans.com
  • 21. eBay ammo1980 eBay ammo1980 6. Cut the Z-brace boards following the DOOR ELEVATIONS. Lay the doors on a flat surface and attach the brace boards using construction adhesive and l 1/4" wood screws. 7. Install the hinges and hang the door, using shims to set the gaps at the bottom and top of each door. 8. Install flashing above the door, nail-off the siding, then install the 1 × 4 door trim, using 8d galv. finish nails. Use pairs of tapered shims to plumb and level the door frame in the rough opening. Assemble the window frames with screws. Add a 2 × 4 mullion in the center of the side window frame. Step H: Build & Install the Windows & Trim Note: If you've bought prehung windows for the shed, install them following the manufacturer's directions. To build homemade windows, use the following directions. 1. For each window, cut the 3/4" × 4 1/4" frame stock to form a rectangular frame with outer dimensions that are 1/2" shorter and www.MyShedPlans.com www.MyShedPlans.com
  • 22. eBay ammo1980 eBay ammo1980 narrower than the rough opening. Assemble the frame with 2 1/2" deck screws. Cut and install a 2 × 4 mullion in the center of the frame for the side-wall window. 2. Install each window frame in its rough opening, using shims and a level to make sure the frame is plumb and level and the jambs are straight. Fasten the frame with 10d galv. casing nails. 3. Cut the 1 × 2 stops. Bevel the outer sill stops as shown in the WINDOW JAMB DETAIL. Attach the inner stops with 6d galv. finish nails. Order the glass to fit. 4. Install the glass and outer stops, applying glazing tape to the stops on both sides of the glass. Install the 1 × 4 window trim. 5. Install the horizontal 1 × 4 trim as shown in the ELEVATIONS. Fasten the trim with 8d galv. finish nails. 6. Install the 1 × 4 corner trim so that it butts against the horizontal trim and extends to the bottom edges of the siding. 7. Caulk along all trim joints, where trim meets siding, and around the door and window trim. Step I: Build the Ramp (Optional) Determining the width and length (and thus the slope) of the ramp is up to you, but here is the basic construction procedure: 1. Determine the best slope for the ramp using boards or plywood set on the ground and the shed floor. Mark the ground to represent the end of the ramp. 2. Cut two 2 × 8 pads to the full width of the ramp. 3. Measure the distance from the ground to the shed floor; subtract 2" from that dimension to get the height of the tapered stringers. 4. Use the ground marking to determine the length of the stringers—be sure to account for the 1 1/2" thickness of the decking. Cut the tapered stringers from 2 × 8 lumber: cut one for each end and one for every 16" to 24" in between. 5. Attach the pads to the stringers with 16d galv. nails driven through the bottom faces of the pads and into the stringers. www.MyShedPlans.com www.MyShedPlans.com
  • 23. eBay ammo1980 eBay ammo1980 6. Cut 2 × 4s for the ramp decking—the number needed depends on the length of the sloping sides of the stringers. Allow for a 1/8" gap between decking boards when calculating the number needed. 7. Attach the decking boards to the supports with 16d galv. nails or 3" deck screws, maintaining a 1/8" gap between boards. 8. Set the ramp in place against the shed and fasten it by toenailing through the end stringers and top decking board with 3 1/2" deck screws. Build the ramp with pressure-treated 2 × 8s and 2 × 4s, following the plan's size or building it to a custom size. www.MyShedPlans.com www.MyShedPlans.com
  • 24. Did you enjoyed this plan? If so, visit MyShedPlans now and download over 12,000 plans and blueprints This 12 x 8 Shed Plan Is Brought To You By MyShedPlans Click Here To Download Over 12,000 Shed Plans >> Visit MyShedPlans Today And See How Easy It Is To Build Beautiful Sheds With Easy-To-Follow Blueprints!