Old & new office yadvendu lower parel yadvendu

468 views
342 views

Published on

Published in: Real Estate
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
468
On SlideShare
0
From Embeds
0
Number of Embeds
10
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Old & new office yadvendu lower parel yadvendu

  1. 1. We get what we want ! A Journey : Some ReminiscencesA Saga of strong belief, unflinching dedication, unmitigated desire to rise as a phoenix Jogendra Yadvendu, Dy.CMM-MTN,CR
  2. 2. Kon Kahata hai ki Aasman me ched nahin hota,Kabhi Patthar to upar utha kar phenko
  3. 3. Earlier Main Entrance Wall Stone co > 700 Flower llected from Dism Pots at Parel antled Structure Depot s ks r ic f ireB ed us O ld
  4. 4. Side Body Wall of CoachWhere is the Wall ?
  5. 5. 150 year old cast Iron Souvenircastigated for life ?
  6. 6. Resurrection is in sight
  7. 7. Wall broken to create Main DoorThis Partition wallis still there
  8. 8. DMS Chamber Today DMS Chamber Today DMS Chamber Today Aquarium
  9. 9. Progress made in improvement of Office Environment
  10. 10. Concrete Shelves Broken Small Windows converted into Big Windows
  11. 11. The area between the columns is now Chambers of DMS
  12. 12. This area today is the conference hall But, without any Columns.
  13. 13. Columns , Columns every wherebut not a single column seen inthe New Office
  14. 14. Today’s EDP Center
  15. 15. Open Area retained for WindowsLift Dismantled for EDP & Ledger Section
  16. 16. Condition of Earlier Warehouse
  17. 17. The same Warehouse Today
  18. 18. The same Warehouse Today
  19. 19. Earlier Today
  20. 20. Condition of Stock Material earlier Today- The same Area
  21. 21. Earlier condition of the area at Platform Warehouse
  22. 22. Earlier condition of the area at Platform Warehouse
  23. 23. Earlier Condition Present Condition
  24. 24. Stages of construction of Platform Warehouse
  25. 25. Every employee has a personal Locker
  26. 26. Every employee has a personal Locker
  27. 27. Earlier condition of Central Ward during heavy Rains
  28. 28. Earlier Condition
  29. 29. Earlier Condition
  30. 30. Present Condition
  31. 31. Present ConditionEarlier Condition
  32. 32. Stages of construction of Platform Warehouse
  33. 33. Earlier Area outside DIPW
  34. 34. Earlier Condition outside Steel Warehouse
  35. 35. Present: Area outside DIPW
  36. 36. Present: Area outside DIPW
  37. 37. Present: Area outside DIPW
  38. 38. Present: Area outside DIPW
  39. 39. Present: Area outside DIPW
  40. 40. Earlier Condition Inside Steel Warehouse
  41. 41. Earlier Condition Inside Steel Warehouse
  42. 42. Present Status Inside Steel Warehouse
  43. 43. Present Status Inside Steel Warehouse

×