This Partition wall is still there Wall broken to create Main Door
 
Concrete Shelves Broken Small Windows converted into Big Windows
 
The area between the columns is now Chambers of DMS
 
 
 
 
This area today is the conference hall But, without any Columns.
 
 
Columns , Columns every where but not a  single column seen in the New Office
Today’s EDP Center
Lift Dismantled for EDP & Ledger Section Open Area retained for Windows
Condition of Earlier Warehouse
The same Warehouse Today
The same Warehouse Today
Earlier  Today
Earlier Main Entrance Wall Old used fire Bricks Stone collected from Dismantled Structures >  700 Flower Pots at Parel Depot
 
Where is the Wall ? Side Body Wall of Coach
Condition of Stock Material earlier Today- The same Area
Every employee has a personal Locker
Every employee has a personal Locker
Earlier condition of Central Ward   during heavy Rains
How was it done ? <ul><li>Dream Big. </li></ul><ul><li>Strong desire for a change. </li></ul><ul><li>Belief that this is m...
<ul><li>Your strong belief permeates up & down and laterally to all the departments. </li></ul><ul><li>Everyone will want ...
The modus Operandi <ul><li>Prepare the Civil & Electrical estimate yourself. These departments are too busy & have no time...
<ul><li>Revenue budget of Civil & Electrical is many time the plan Budget. </li></ul><ul><li>Get the same utilized for you...
Electrical <ul><li>Get revenue indents generated for your requirements like fans, switchboards, MCB, Power Panels, Cables ...
Upcoming SlideShare
Loading in …5
×

Changes at Carriage Workshop, Lower Parel, Mumbai, India

1,129 views
981 views

Published on

Published in: Real Estate
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,129
On SlideShare
0
From Embeds
0
Number of Embeds
12
Actions
Shares
0
Downloads
14
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Changes at Carriage Workshop, Lower Parel, Mumbai, India

  1. 2. This Partition wall is still there Wall broken to create Main Door
  2. 4. Concrete Shelves Broken Small Windows converted into Big Windows
  3. 6. The area between the columns is now Chambers of DMS
  4. 11. This area today is the conference hall But, without any Columns.
  5. 14. Columns , Columns every where but not a single column seen in the New Office
  6. 15. Today’s EDP Center
  7. 16. Lift Dismantled for EDP & Ledger Section Open Area retained for Windows
  8. 17. Condition of Earlier Warehouse
  9. 18. The same Warehouse Today
  10. 19. The same Warehouse Today
  11. 20. Earlier Today
  12. 21. Earlier Main Entrance Wall Old used fire Bricks Stone collected from Dismantled Structures > 700 Flower Pots at Parel Depot
  13. 23. Where is the Wall ? Side Body Wall of Coach
  14. 24. Condition of Stock Material earlier Today- The same Area
  15. 25. Every employee has a personal Locker
  16. 26. Every employee has a personal Locker
  17. 27. Earlier condition of Central Ward during heavy Rains
  18. 28. How was it done ? <ul><li>Dream Big. </li></ul><ul><li>Strong desire for a change. </li></ul><ul><li>Belief that this is my workshop </li></ul><ul><li>Don’t look up or down for guidance. If guidance was available, things wouldn’t be the way they are today. </li></ul><ul><li>Be the traveler & the guide. </li></ul><ul><li>Initially people will say, Pagal ho gaya hai., Railway me kuch bhi change nahi hota hai. ,Stores ke liye to koi bhi taiyar nahi hoga . </li></ul>
  19. 29. <ul><li>Your strong belief permeates up & down and laterally to all the departments. </li></ul><ul><li>Everyone will want to become a part of the change </li></ul><ul><li>Even civil & electrical contractors want to walk the extra mile for a perfect job done. </li></ul><ul><li>Supervise each tile laid, each false ceiling fitted, each cable installed, position of fans-----Everything. </li></ul>
  20. 30. The modus Operandi <ul><li>Prepare the Civil & Electrical estimate yourself. These departments are too busy & have no time. </li></ul><ul><li>Civil Work. </li></ul><ul><li>Flooring- Big Tiles, small tiles, PVC flooring or plain Cement Concrete </li></ul><ul><li>Brickwork: Sqm </li></ul><ul><li>Paneling: MDF or sunmica on plywood ? </li></ul><ul><li>False Ceiling: Brown or white ? </li></ul><ul><li>Convert brown to white. </li></ul>
  21. 31. <ul><li>Revenue budget of Civil & Electrical is many time the plan Budget. </li></ul><ul><li>Get the same utilized for your Office & Warehouses. </li></ul><ul><li>Convince the CAO-Con. In HQ or Sr.DEn of Division </li></ul><ul><li>Use variations in available contracts. </li></ul><ul><li>Use the zonal contracts. </li></ul><ul><li>Issue material to civil & use it back in your depot like 19 mm plywood, Sunmica, Plastic Emulsion White, fevicol, Araldite, PVC. </li></ul><ul><li>Use old wooden almirahs for framing of doors & other structures </li></ul>
  22. 32. Electrical <ul><li>Get revenue indents generated for your requirements like fans, switchboards, MCB, Power Panels, Cables , light fittings --- All this of your choice and make. </li></ul><ul><li>Procure through Sr.DMM or Depot Officer. </li></ul><ul><li>Get a wiring contract operated on quotation basis upto Rs 4 lakhs. The amount is more than enough for a building of 1000 Sqm. </li></ul><ul><li>Supervise , guide the contractor while fitting the accessories, location of each item. Help the contractor in any way possible. </li></ul>

×