CMGT 410 Week 5 Learning Team Project              Evaluation and Control                      PLEASE DOWNLOAD HERERevise ...
Upcoming SlideShare
Loading in …5
×

Cmgt 410 week 5 learning team project evaluation and control

115 views
65 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
115
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Cmgt 410 week 5 learning team project evaluation and control

  1. 1. CMGT 410 Week 5 Learning Team Project Evaluation and Control PLEASE DOWNLOAD HERERevise and submit all sections of your Learning Team project along with theWeek Five section below.It is essential for establishing confidence that a project will be executed effectivelyand with minimal waste. A plan for performance measurement requires identifyingwhich critical element should be measured, how they are measured, and whenthey are measured to communicate if the project is on track.At a minimum the section will contain the following:Measurable objectives identified as milestones on the Gantt chartRisk mitigation strategy for analyzing and reporting unplanned changes as wellwhat procedures you plan to implement for handling change control issuesDescription of project reporting regarding the on-going evaluation and status ofproject efforts to stakeholder and participants on the project teamMethod for determining whether the project has met its objectives and how theproject is terminatedWrite 3 to 4 pages on your findings.Prepare a 10- to 12-slide Microsoft® PowerPoint® presentation of the entireLearning Team Project, as completed in Weeks Two, Three, Four, and Five.

×