5. 0 It helps to generate more ideas through brainstorming
session and provide a different point of view for each
particular in order to bring up more ideas.
0 It helps to develop skills in summarizing the
information of definition, construction process, team
players, classification, stages in construction into a
more specific words in order to gain understand
through the mind-mapping.
8. 0 It learns about the general overview of construction
industry from mankind perspective which can be
derived from different point of views.
0 It helps to assess the students understanding on the
general construction process from the sketch plan to
completion of a building and introduce the scope of
work handled by the players involved.
13. 0 It enables to develop an understanding of client
responsibilities and their needs in industry and how
client creates idea and their intention for a project.
0 It learns to make full use of a vacant space, turn
something out of nothing by designing it through the
client needs.
0 It emphasis on the importance of site selection and
observation base on the site chosen.
14.
15. What we did during our video
recording, we worked as a group to
complete the video and had a lot of
fun throughout this recording.
16. The video created by us based on an article.
(http://www.youtube.com/watch?v=2HprtCyMmdM&feat
ure=share )
17. 0 It gives good experience to us by letting us know the
behavior of society nowadays.
0 It emphasis on the parties involved in the
construction industry and their involvement through
a project.
0 It helps to develop an awareness of their professional
responsibilities and to appreciate the importance of
their profession in the construction industry.
18.
19. 0 What is the work involved? It is about the 5 distinct
stages as you mentioned, Preliminary Stage, Detailed
Design Stage, Tender Stage, Construction Stage, Post-
Construction Stage, can you briefly explain all the
stages?
0 Can you tell us the process of getting plan approval, is
there any problems encountered? Any amendments to
the original submission as per request by authority?
0 As a quantity surveyor, how frequent does you carry
out site inspection to check the work process?
20. 0 We know that you are required to send in a proposal
about the constructions costs, constructions materials
and labor activities on particular project in order to
get a contract approval from the authority, can you
elaborate in details of this proposal?
0 After site inspection, do you report the work process
to Project Manager or Project Director? What does the
report is all about, can you specify it?
0 Does a quantity surveyor important in a construction?
What are the advantages for having a quantity
surveyor and the disadvantages for not having a
quantity surveyor?
21. 0 It introduces the scope of work handled by quantity
surveyor in construction with regards to their
responsibility and duties in completing a
construction project.
0 It explains the need of compliance to particular
requirements in obtaining authority approval.
0 It gains the ability to document their observations and
research as well as to communicate their findings.