• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Drainage  Systems
 

Drainage Systems

on

  • 2,234 views

 

Statistics

Views

Total Views
2,234
Views on SlideShare
2,234
Embed Views
0

Actions

Likes
3
Downloads
126
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Drainage  Systems Drainage Systems Document Transcript

    • Kitchen & Bath Chapter II Drainage System Drain Systems ١
    • WC Flow of Drain: 1.5 L/S Diameter: 110 mm ٣ Suspended – WC Flow of Drain: 1.5 L/S Diameter: 110 mm ٤ ٢
    • Wash-hand basin Flow of Drain: 0.7 L/S Diameter: 50 mm ٥ Bidet Drain Flow : 0.4 L/S Diameter: 50 mm ٦ ٣
    • Bathtub Flow of Drain: 0.8 L/S Diameter: 50 mm ٧ Siphon Parquet floor Flow of Drain: 0.8 L/S Diameter: 125x75x50 ٨ ٤
    • Siphon Parquet floor Flow of Drain: 0.8 L/S Diameter: 125x75x50 ٩ Bathroom Flow of Drain: 4.2 L/S Diameter: 110 mm ١٠ ٥
    • Sink Drain Flow : 0.8 L/S Diameter: 50 mm ١١ Washing machine’s Siphon Drain Flow : 0.8 L/S Diameter: 40 mm ١٢ ٦
    • Evacuations Drawing ١٣ of the Evacuations Drawing ١٤ ٧
    • Evacuations Drawing ١٥ of the Evacuations Drawing ١٦ ٨
    • Falls ١٧ Fall Diagram ١٨ ٩
    • Falls Ventilation ١٩ Single fall ٢٠ ١٠
    • External drain ٢١ Siphon Interceptor ٢٢ ١١
    • Anti Return Valve Normal Working Situation Effective Anti-Flooding ٢٣ Anti Return Valve ٢٤ ١٢
    • “Glance” chamber with Inspection ٢٥ Inspection chamber ٢٦ ١٣
    • EUROPEAN STANDARD NF IN 124 Group 1 Group 4 Devices installed on the lanes Zone pedestrian or of the roads. cyclist. D400 Charge 40 tons. A15 Charge 1.5 tons. Group 2 Pavements, spaces parking, carparks. Group 5 Zones imposing of the loads on the B125 Charge 12.5 tons. E600 axle raised, for example docks. Charge 60 tons. Group 3 Devices intallés on the zone of Group 6 Zone imposing of the particularly the gutters. C250 Charge 25 tons. F900 high loads on the axle. Charge 90 tons. ٢٧ Grease Trap ٢٨ ١٤
    • Septic tank ٢٩ Septic tank ٣٠ ١٥
    • Biological pit ٣١ Collecting station ٣٢ ١٦
    • Microstations Rising ٣٣ Rain water ٣٤ ١٧
    • Ground Equipment Point Drainage Linear drainage ٣٥ Ground Equipment ٣٦ ١٨
    • Balcony Drain ٣٧ Roof Drain ٣٨ ١٩
    • Gutters ٣٩ Ventilation ٤٠ ٢٠