Drainage Systems

  1. 1. Kitchen & Bath Chapter II Drainage System Drain Systems ١
  2. 2. WC Flow of Drain: 1.5 L/S Diameter: 110 mm ٣ Suspended – WC Flow of Drain: 1.5 L/S Diameter: 110 mm ٤ ٢
  3. 3. Wash-hand basin Flow of Drain: 0.7 L/S Diameter: 50 mm ٥ Bidet Drain Flow : 0.4 L/S Diameter: 50 mm ٦ ٣
  4. 4. Bathtub Flow of Drain: 0.8 L/S Diameter: 50 mm ٧ Siphon Parquet floor Flow of Drain: 0.8 L/S Diameter: 125x75x50 ٨ ٤
  5. 5. Siphon Parquet floor Flow of Drain: 0.8 L/S Diameter: 125x75x50 ٩ Bathroom Flow of Drain: 4.2 L/S Diameter: 110 mm ١٠ ٥
  6. 6. Sink Drain Flow : 0.8 L/S Diameter: 50 mm ١١ Washing machine’s Siphon Drain Flow : 0.8 L/S Diameter: 40 mm ١٢ ٦
  7. 7. Evacuations Drawing ١٣ of the Evacuations Drawing ١٤ ٧
  8. 8. Evacuations Drawing ١٥ of the Evacuations Drawing ١٦ ٨
  9. 9. Falls ١٧ Fall Diagram ١٨ ٩
  10. 10. Falls Ventilation ١٩ Single fall ٢٠ ١٠
  11. 11. External drain ٢١ Siphon Interceptor ٢٢ ١١
  12. 12. Anti Return Valve Normal Working Situation Effective Anti-Flooding ٢٣ Anti Return Valve ٢٤ ١٢
  13. 13. “Glance” chamber with Inspection ٢٥ Inspection chamber ٢٦ ١٣
  14. 14. EUROPEAN STANDARD NF IN 124 Group 1 Group 4 Devices installed on the lanes Zone pedestrian or of the roads. cyclist. D400 Charge 40 tons. A15 Charge 1.5 tons. Group 2 Pavements, spaces parking, carparks. Group 5 Zones imposing of the loads on the B125 Charge 12.5 tons. E600 axle raised, for example docks. Charge 60 tons. Group 3 Devices intallés on the zone of Group 6 Zone imposing of the particularly the gutters. C250 Charge 25 tons. F900 high loads on the axle. Charge 90 tons. ٢٧ Grease Trap ٢٨ ١٤
  15. 15. Septic tank ٢٩ Septic tank ٣٠ ١٥
  16. 16. Biological pit ٣١ Collecting station ٣٢ ١٦
  17. 17. Microstations Rising ٣٣ Rain water ٣٤ ١٧
  18. 18. Ground Equipment Point Drainage Linear drainage ٣٥ Ground Equipment ٣٦ ١٨
  19. 19. Balcony Drain ٣٧ Roof Drain ٣٨ ١٩
  20. 20. Gutters ٣٩ Ventilation ٤٠ ٢٠

×