Wspe Seminar 5 May 15, 2009 LEED Certification

  • 1,284 views
Uploaded on

 

More in: Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
1,284
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
70
Comments
0
Likes
2

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. LEED v3 Constants and Change Ryan Kline, LEED AP May 15, 2009
  • 2. Agenda LEED v3 o What stays the same o What changes o Timing o USGBC vs GBCI The LEED AP of Tomorrow o Tiered System o Continuing Education o Now vs. Then
  • 3. Constants Structure o 5 main categories Toyota Motor Sales o Credits > Sub‐credits > points Torrance, CA | LEED-NC Gold Multiple Rating Systems o NC, CS, CI, etc. Credits o Language o Structure OVER 80% OF OCCUPANTS ENJOY NATURAL DAYLIGHT AND VIEWS
  • 4. Change Point Distribution o 100 + 10 points Toyota Motor Sales o Weighted credits Torrance, CA | LEED-NC Gold Credits o Demanding prereqs o Reference standards Bookshelf o BD+C o ID+C o O+M OVER 80% OF OCCUPANTS ENJOY NATURAL DAYLIGHT AND VIEWS
  • 5. Change Points LEED‐NC v2.2 LEED‐NC 2009 Sustainable Sites  14  20% 26 24% Water Efficiency 5 7% 10 9% Energy & Atmosphere 17 25% 35 32% Materials & Resources 13 19% 14 13% Indoor Environmental Quality 15 22% 15 14% 64 100 Innovation & Design 5 7% 6 5% Regional Priority 0 0% 4 4% 69 110
  • 6. Change Weight Urban Development SSc2 @ 5pts SSc4.1 @ 6pts Energy EAc1 @ 19pts!!! EAc2 @ 7pts!!! Regional Focus Bonus credits City of Seattle Police Support Facility Seattle, WA | LEED-NC Gold & LEED-CI Silver
  • 7. Change Credits WEp1 20 % water use reduction is now a prerequisite EAp2 Must perform better than ASHRAE 90.1‐2007 baseline MRc8 Paths of compliance other than FSC under consideration RPc1 Regional priority credits 1180 Peachtree QUALITY LOW VOCs ENCHANCE INDOOR AIR Atlanta, GA | LEED-NC Gold EXTENSIVE INTERIOR LANDSCAPING 30 Hudson Street Jersey City, NJ | LEED-NC Certified
  • 8. Change Regional Priority Points Earn 1 pt, up to 4 pts, for achieving any of 6 predetermined,  regionally‐critical credits Region Established by zip code; reviewed at state level 1180 Peachtree QUALITY LOW VOCs ENCHANCE INDOOR AIR Atlanta, GA | LEED-NC Gold EXTENSIVE INTERIOR LANDSCAPING 30 Hudson Street Jersey City, NJ | LEED-NC Certified
  • 9. Bookshelf Concept
  • 10. Timing
  • 11. Timing 4/27/2009 LEED v3 was launched 6/26/2009 Last day to register a project under “Pre‐2009” rating  systems 6/30/2009 Last day to take the LEED AP exam 12/31/2009 Last day for free registration upgrade to LEED v3 1/1/2010 Registration fees increase LEED Certified Projects MISSOURI GEORGIA WASHINGTON
  • 12. USGBC GBCI USGBC o LEED rating system development o LEED reference material &  resources o Advocacy o Membership GBCI o LEED professional credentials o LEED building certification o LEED Online Ford Motor Company Engineering Design Center Chicago, IL | LEED-NC Silver UNDERFLOOR AIR DISTRIBUTION SYSTEM
  • 13. LEED AP Impetus Why change? Meet John. Meet Joe. o Resume includes several LEED  o Took an exam certified projects o LEED AP o Active member of LEED  project teams o USGBC & Local Chapter  Who do you want  Member working on YOUR  o LEED AP LEED Project?
  • 14. LEED AP Tiers LEED 2009 LEED Green LEED AP LEED AP Legacy Associate Fellow LEED AP Application + Application + Peer review of Multiple Choice Multiple Choice project portfolio Exam Exam App. $50 $100 None None Reg. $150/$200 $300/$450 None None Bi-Ann. $50 $50 None $50 15 Hours 30 Hours None 30 Hours CE (min 3 LEED) (min 6 LEED) (min 6 LEED) LEED Gold Certified Projects PENNSYLVANIA WASHINGTON CALIFORNIA
  • 15. LEED AP Legacy ACTIVATE DO NOTHING 2009 Bi‐Annual  Continuing  Fee + Education  Grandfathered!!! ($50) (30 Hours) 2011 Bi‐Annual  Continuing  + GONE!!! Fee Education  ($50) (30 Hours) Future LEED Platinum Certified Projects WASHINGTON CALIFORNIA MASSACHUSETTS
  • 16. QUESTIONS?