Your SlideShare is downloading. ×
0
LEED v3 Constants and Change




                          Ryan Kline, LEED AP
                                May 15, 2009
Agenda

LEED v3
o What stays the same

o What changes

o Timing

o USGBC vs GBCI



The LEED AP of Tomorrow
o Tiered Syste...
Constants


Structure
o  5 main categories                Toyota Motor Sales
o  Credits > Sub‐credits > points   Torrance,...
Change


Point Distribution
o 100 + 10 points       Toyota Motor Sales
o Weighted credits      Torrance, CA   |   LEED-NC ...
Change Points


                             LEED‐NC v2.2   LEED‐NC 2009
Sustainable Sites            14       20%   26   ...
Change Weight


Urban Development
  SSc2 @ 5pts
  SSc4.1 @ 6pts

Energy
  EAc1 @ 19pts!!!
  EAc2 @ 7pts!!!

Regional Focus...
Change Credits

                                 WEp1 20 % water use reduction is now a prerequisite
                     ...
Change Regional Priority

                                 Points
                                   Earn 1 pt, up to 4 pt...
Bookshelf Concept
Timing
Timing

4/27/2009       LEED v3 was launched
6/26/2009       Last day to register a project under “Pre‐2009” rating 
     ...
USGBC GBCI

                                                   USGBC
                                                     ...
LEED AP Impetus
Why change?
Meet John.                             Meet Joe.
   o   Resume includes several LEED       o  ...
LEED AP Tiers
     LEED 2009

         LEED Green                LEED AP                LEED AP                  Legacy
  ...
LEED AP Legacy


        ACTIVATE                                  DO NOTHING
                                  2009
 Bi‐A...
QUESTIONS?
Upcoming SlideShare
Loading in...5
×

Wspe Seminar 5 May 15, 2009 LEED Certification

1,300

Published on

Published in: Technology, Business
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,300
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
70
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide

Transcript of "Wspe Seminar 5 May 15, 2009 LEED Certification"

  1. 1. LEED v3 Constants and Change Ryan Kline, LEED AP May 15, 2009
  2. 2. Agenda LEED v3 o What stays the same o What changes o Timing o USGBC vs GBCI The LEED AP of Tomorrow o Tiered System o Continuing Education o Now vs. Then
  3. 3. Constants Structure o 5 main categories Toyota Motor Sales o Credits > Sub‐credits > points Torrance, CA | LEED-NC Gold Multiple Rating Systems o NC, CS, CI, etc. Credits o Language o Structure OVER 80% OF OCCUPANTS ENJOY NATURAL DAYLIGHT AND VIEWS
  4. 4. Change Point Distribution o 100 + 10 points Toyota Motor Sales o Weighted credits Torrance, CA | LEED-NC Gold Credits o Demanding prereqs o Reference standards Bookshelf o BD+C o ID+C o O+M OVER 80% OF OCCUPANTS ENJOY NATURAL DAYLIGHT AND VIEWS
  5. 5. Change Points LEED‐NC v2.2 LEED‐NC 2009 Sustainable Sites  14  20% 26 24% Water Efficiency 5 7% 10 9% Energy & Atmosphere 17 25% 35 32% Materials & Resources 13 19% 14 13% Indoor Environmental Quality 15 22% 15 14% 64 100 Innovation & Design 5 7% 6 5% Regional Priority 0 0% 4 4% 69 110
  6. 6. Change Weight Urban Development SSc2 @ 5pts SSc4.1 @ 6pts Energy EAc1 @ 19pts!!! EAc2 @ 7pts!!! Regional Focus Bonus credits City of Seattle Police Support Facility Seattle, WA | LEED-NC Gold & LEED-CI Silver
  7. 7. Change Credits WEp1 20 % water use reduction is now a prerequisite EAp2 Must perform better than ASHRAE 90.1‐2007 baseline MRc8 Paths of compliance other than FSC under consideration RPc1 Regional priority credits 1180 Peachtree QUALITY LOW VOCs ENCHANCE INDOOR AIR Atlanta, GA | LEED-NC Gold EXTENSIVE INTERIOR LANDSCAPING 30 Hudson Street Jersey City, NJ | LEED-NC Certified
  8. 8. Change Regional Priority Points Earn 1 pt, up to 4 pts, for achieving any of 6 predetermined,  regionally‐critical credits Region Established by zip code; reviewed at state level 1180 Peachtree QUALITY LOW VOCs ENCHANCE INDOOR AIR Atlanta, GA | LEED-NC Gold EXTENSIVE INTERIOR LANDSCAPING 30 Hudson Street Jersey City, NJ | LEED-NC Certified
  9. 9. Bookshelf Concept
  10. 10. Timing
  11. 11. Timing 4/27/2009 LEED v3 was launched 6/26/2009 Last day to register a project under “Pre‐2009” rating  systems 6/30/2009 Last day to take the LEED AP exam 12/31/2009 Last day for free registration upgrade to LEED v3 1/1/2010 Registration fees increase LEED Certified Projects MISSOURI GEORGIA WASHINGTON
  12. 12. USGBC GBCI USGBC o LEED rating system development o LEED reference material &  resources o Advocacy o Membership GBCI o LEED professional credentials o LEED building certification o LEED Online Ford Motor Company Engineering Design Center Chicago, IL | LEED-NC Silver UNDERFLOOR AIR DISTRIBUTION SYSTEM
  13. 13. LEED AP Impetus Why change? Meet John. Meet Joe. o Resume includes several LEED  o Took an exam certified projects o LEED AP o Active member of LEED  project teams o USGBC & Local Chapter  Who do you want  Member working on YOUR  o LEED AP LEED Project?
  14. 14. LEED AP Tiers LEED 2009 LEED Green LEED AP LEED AP Legacy Associate Fellow LEED AP Application + Application + Peer review of Multiple Choice Multiple Choice project portfolio Exam Exam App. $50 $100 None None Reg. $150/$200 $300/$450 None None Bi-Ann. $50 $50 None $50 15 Hours 30 Hours None 30 Hours CE (min 3 LEED) (min 6 LEED) (min 6 LEED) LEED Gold Certified Projects PENNSYLVANIA WASHINGTON CALIFORNIA
  15. 15. LEED AP Legacy ACTIVATE DO NOTHING 2009 Bi‐Annual  Continuing  Fee + Education  Grandfathered!!! ($50) (30 Hours) 2011 Bi‐Annual  Continuing  + GONE!!! Fee Education  ($50) (30 Hours) Future LEED Platinum Certified Projects WASHINGTON CALIFORNIA MASSACHUSETTS
  16. 16. QUESTIONS?
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×