CIRCULARWATERWAY PROJECT     DHAKA
PREPARED BY:                Farhana Noor.Department of Water Resources Engineering, BUET.                  Edited by:     ...
The significance of waterway:Satellite image of Dhaka city,1984
The significance of waterway:Satellite image of Dhaka city,2003
The significance of waterway:• The comparison of the two  satellite images show how the  waterways in thy city of Dhaka  h...
Features of circular waterway:Variations of cross-sections with time
Features of circular waterway:Maximum velocity vs. water level for Balu River,Demra
Features of circular waterway:      Latral distance(m)
Features of circular waterway:Comprison of minimum bed levels &water levels
Waterway facilities:• Total network of river system 24,000 km  consisting of rivers.• canals,creeks, water bodies etc. occ...
Water Routes:
Introductory history of this project: • Cicular waterway project is   mainly taken to lessening the   Dhaka city jam in th...
The project phases:• The first phase of the Dhaka Circular  Waterway     project    includes   the  Buriganga and Turag ri...
Project Location
The organizations related to this                project:There was three organizations on to the  responsibility this proj...
The landing stations established               for 2nd phase work:1.   Tongi2.   Herbaid3.   Trimukh4.   Khardi5.   Ishapu...
The Budget of the total project:• The 1st phase of it has been  completed at a cost of Taka 36 crore  providing 29.5 km of...
The consequent circumstance of this              project: A huge public enthusiasm spreadamong people when it wasinaugurat...
The works included in the 2nd phase work:    The work of the second phase    includes:   dredging of 32 lakh cubic metres...
Hindrances to the 2nd phase project:• In the present proposed waterway system  (30km), some difficulties may be  encounter...
A canal filled with wastes
Hindrances to the 2nd phase project:• The second phase of the project failed get  ECNEC’s nod, resulting in delay in resum...
Current state of this project area:These landing stations, terminal buildings and other structures are now in a shambles ...
Current state of this project area: Some of the leaseholders have rented outthe terminal buildings to some traders forusi...
Current state of this project area:• Two private motor launches Atlas  Sun and Shaluk started carrying  passengers after t...
THANK YOU
Upcoming SlideShare
Loading in...5
×

Circular waterway project

801

Published on

Circular waterway project of Dhaka

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
801
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
19
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Circular waterway project

  1. 1. CIRCULARWATERWAY PROJECT DHAKA
  2. 2. PREPARED BY: Farhana Noor.Department of Water Resources Engineering, BUET. Edited by: Raihanul Haque KhanDepartment of Water Resources Engineering, BUET.
  3. 3. The significance of waterway:Satellite image of Dhaka city,1984
  4. 4. The significance of waterway:Satellite image of Dhaka city,2003
  5. 5. The significance of waterway:• The comparison of the two satellite images show how the waterways in thy city of Dhaka has decreased in just about 10 years.
  6. 6. Features of circular waterway:Variations of cross-sections with time
  7. 7. Features of circular waterway:Maximum velocity vs. water level for Balu River,Demra
  8. 8. Features of circular waterway: Latral distance(m)
  9. 9. Features of circular waterway:Comprison of minimum bed levels &water levels
  10. 10. Waterway facilities:• Total network of river system 24,000 km consisting of rivers.• canals,creeks, water bodies etc. occupying 11%area of the country.• Navigable for longer sizedvessels 6000 km. (during monsoon i.e. betweenmid November and end of February)• Navigable round the year 3600 km.
  11. 11. Water Routes:
  12. 12. Introductory history of this project: • Cicular waterway project is mainly taken to lessening the Dhaka city jam in this tremendous situation. It was planned to connect the water way from Sadarghat to Ashulia then Ashulia Bridge via Tongi to Kanchpur. The project was first taken to 2004.
  13. 13. The project phases:• The first phase of the Dhaka Circular Waterway project includes the Buriganga and Turag rivers from Sadarghat to Ashulia covering 29.50km of waterways .• And the second phase that combines the Balu and Shitalakhya rivers from Ashulia Bridge via Tongi to Kanchpur Bridge covers 40.50km of waterways. The project was taken up in 2004.
  14. 14. Project Location
  15. 15. The organizations related to this project:There was three organizations on to the responsibility this project:Bangladesh Inland water Transport AuthorityDhaka City CorporationLocal Government Engineering
  16. 16. The landing stations established for 2nd phase work:1. Tongi2. Herbaid3. Trimukh4. Khardi5. Ishapura6. Baraid7. Kayet para8. Demra9. Kanchpur
  17. 17. The Budget of the total project:• The 1st phase of it has been completed at a cost of Taka 36 crore providing 29.5 km of river routes.• ECNEC approved the 2nd phase work of the projectat the cost of 47.5 crores.
  18. 18. The consequent circumstance of this project: A huge public enthusiasm spreadamong people when it wasinaugurated in march last 2005.Thefirst phase of this project hascompleted and it is already in use.But the 2nd phase of this project ishindered step by step. As a result ,itis unfinished and causes differentkinds of problems.
  19. 19. The works included in the 2nd phase work: The work of the second phase includes: dredging of 32 lakh cubic metres of silt construction of four jetties construction of terminal buildings  The excavation of three canals — Rampura, Meradia and Gobindapur
  20. 20. Hindrances to the 2nd phase project:• In the present proposed waterway system (30km), some difficulties may be encountered because some low-height bridges were constructed earlier, under which, during the high water level, vessels cannot cross, and loaded vessels cannot ply during the low water level because of the low depth of water in the river. For these reasons, may be,the proposed waterway is about to be abandoned.
  21. 21. A canal filled with wastes
  22. 22. Hindrances to the 2nd phase project:• The second phase of the project failed get ECNEC’s nod, resulting in delay in resuming the work to complete the waterway. • The project will be financed under the Japan Debt Cancellation Fund, and an amount of Tk 27.67 crore has been released in the current fiscal year. The fund could not be used in the last two years due to lack of policy decision. The project was scheduled to begin in July 2005.
  23. 23. Current state of this project area:These landing stations, terminal buildings and other structures are now in a shambles for lack of maintenance and proper care. They are being used as warehouses for rod, cement, sand and other materials by the leaseholders.
  24. 24. Current state of this project area: Some of the leaseholders have rented outthe terminal buildings to some traders forusing as their warehouses and there areallegations that the drug addicts and peopleinvolved in anti-social activities have beenusing those abandoned landing stations andthe terminal buildings. As a result, thelanding stations including the buildings arefast donning the look of haunted places
  25. 25. Current state of this project area:• Two private motor launches Atlas Sun and Shaluk started carrying passengers after the inauguration of the circular waterway. But they stopped their service within a few months of their introduction as the passengers avoided the waterway as it turned commuter-unfriendly for various crises such as lack of proper navigability, mismanagement etc.
  26. 26. THANK YOU