Water Infrastructure Group
Upcoming SlideShare
Loading in...5
×
 

Water Infrastructure Group

on

  • 548 views

About Water Infrastructure Group

About Water Infrastructure Group
October 2012

Statistics

Views

Total Views
548
Views on SlideShare
547
Embed Views
1

Actions

Likes
0
Downloads
6
Comments
0

1 Embed 1

http://www.slashdocs.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Water Infrastructure Group Water Infrastructure Group Presentation Transcript

  • DESIGNBUILDOPERATEMAINTAIN
  • OUR BUSINESS MODEL IS ALIGNED TO THENEEDS OF OUR CUSTOMERS
  • WI Group Geographical coverage Townsville Over 30 project sites 7 officesHarding Dam Dalby Monkey Mia Riverland Perth 6MH WHC Mangawhai Virginia Auckland Christies Beach Sydney Water Contract Christchurch Campaspe BCI Country Towns Project Surbiton Eastern Barwon
  • DESIGNBUILDOPERATEMAINTAIN
  • DESIGN• WI Group draws on its people to provide high level technical input and design management• Retains technical capability to support WI Group business units and projects• Draws on WI Groups relationships and utilisation of specialist Consultants• Some of the staff have 20 plus years of specialised water industry design experience• WI Group maintains a design and detailing group
  • Specialist/Technical capability• Water and wastewater treatment• Biosolids drying facilities• Class A recycling facilities and schemes• Chemical dosing systems• Membrane plants (large and modularised)• Pipeline rehabilitation• Pipeline systems• Wastewater schemes• Mechanical/Electrical/Process Equipment
  • DESIGNBUILDOPERATEMAINTAIN
  • BUILD• DB, DBF, B, D • Virginia Pipeline Scheme• Projects from $200k to $50m • Eastern Irrigation Scheme• Provision of Funding options • Campaspe Water Reclamation Scheme• Fabrication facility in Adelaide • Barwon Bio solids Project• Dedicated project teams• Onsite project delivery and • Macquarie Settlement Pipeline factory fabrication of modular units • Moura Recycling plant• Risk assessment & mitigation approach • Adelaide Desal Pilot plant• Pipeline rehabilitation (pressure, • Mangawhai Wastewater sewer, drainage) scheme• Mechanical/Electrical/Process equipment
  • DESIGNBUILDOPERATEMAINTAIN
  • OPERATIONS• Virtual Control Room • Virginia Pipeline Scheme• 24/7- 3 to 25 year • Eastern Irrigation Scheme concessions • Campaspe Water• Performance standards Reclamation Scheme• Training • Barwon Biosolids Scheme• Technical Support • Mangawhai EcoCare Scheme• IMS approach• MEX- maintenance • Surbiton Class A Water management Recycling• Sampling/Testing • Adelaide Desal Pilot Plant• Emergency procedures and equipment
  • DESIGNBUILDOPERATEMAINTAIN
  • MAINTAIN• CCTV and sewer cleaning contracts – 600 km/yr• Manhole rehabilitation• Pipeline joint and coating repair• Pumping station fit outs (equipment and OH&S)• Replacement and updating mechanical/electrical and chemical dosing facilities• Specialist valve rehabilitation
  • AWARDS• 2012 Australian Concrete Repair Association Award for Excellence for Rehabilitation of Six Maintenance Holes• 2012 Institute of Public Works NSW Engineering Excellence Award for Innovation in Water Supply and Wastewater – Operations for Eurobodalla Northern Water Treatment Plant• 2012 Australian Water Association National Water Industry Safety Excellence Award for BOOS rehabilitation project• 2011 Australian Water Association Infrastructure Project Innovation Finalist for the Dalby Class A+ Wastewater Recycling Treatment Plant• 2011 Australasian Society for Trenchless Technology Rehabilitation Project of the Year Award for the Bondi Ocean Outfall Sewer rehabilitation project• 2011 Australian Water Association Water Industry Safety Excellence Award High Commendation for NSOOS Gore Creek and Burns Bay Aqueduct Rehabilitation Project• 2011 Australian Water Association Program Innovation Award Finalist for Virginia Pipeline Scheme
  • AWARDS• 2010 Institute of Public Works Engineering Excellence Award for Water Projects up to $5 million for the Dalby Class A+ Wastewater Recycling Treatment Plant• 2010 Australian Concrete Repair Association Award for Excellence for Moreton Bay Sewer Maintenance Hole Rehabilitation Project• 2010 WateReuse Association Awards Finalist in the International Project category for the Virginia Pipeline Scheme• 2010 United Nations Association of Australia World Environment Day Awards Finalist in the Excellence in Sustainable Water Management Award category for the Virginia Pipeline Scheme• 2010 Engineering Excellence Awards Finalist in the South Australian Environment and Sustainability category for the Virginia Pipeline Scheme• 2010 Civil Contractors Federation Earth Awards Finalist in New South Wales Category Two Projects $5 million to $15 million
  • AWARDS• 2009 United Nations World Environment Day Award for Excellence in Sustainable Water Management for the Surbiton Park Class A Recycled Water Plant• 2009 Institute of Public Works Engineering Australia (NSW) Engineering Heritage Award for Hay St Stormwater Channel Relining Project• 2006 International Water Association Project Innovation Award for the Eastern Irrigation Scheme• 2006 Australian Concrete Repair Association Repairer of the Year for the SWOOS rehabilitation project• 2006 Engineers Australia (NSW) High Commendation for Project Management for the SWOOS rehabilitation project• 2006 WorkCover NSW High Commendation for Best Workplace OHS Management System for the SWOOS rehabilitation project• 2005 Engineers Australia Excellence Award for Environment and Sustainability for the Campaspe Water Reclamation Scheme
  • Over $100 million invested inschemes delivering 25 GL/yearof recycled water
  • Delivering over 40% of Australia’s ClassA recycled water for agricultural andresidential use
  • CURRENT PROJECTS
  • NSOOS Rehabilitation ProjectInternal rehabilitation of Burns Bay & Gore CreekAqueducts for the Sydney Water Wet Weather Alliance
  • BCI IRRIGATION PROJECT60km of Polyethylene pipelines, Canterbury Plains New Zealand
  • BOOS REHABITATION PROJECTInternal Rehabilitation of 900m of the Bondi Ocean Outfall Sewer forSydney Water
  • EUROBODALLA Water Treatment PlantD&C Water Treatment Plant for Eurobodalla Shire Council– managed by NSW Public Works
  • VIRGINIA PIPELINE SCHEMEOne of the world’s largest high quality water recycling schemes
  • CAMPASPE WATER RECLAMATION SCHEME2005 Excellence Award for Environment and Sustainabilitypresented by Engineers Australia (Victoria)
  • EASTERN IRRIGATION SCHEME2006 Project Innovation Award for Designpresented by the International WaterAssociation
  • SURBITON PARK CLASS A RECYCLED WATER PLANT2009 United Nations Association of Australia World EnvironmentDay Award for Excellence in Sustainable Water Management
  • BARWON WATER BIOSOLIDS MANAGEMENT PROJECTAustralia’s first thermal biosolds drying facility
  • Leading the way with MBR technologyWater Infrastructure Group supplies over 40% of Australia’sClass A recycled water for residential and irrigation use. Thegroup is also leading the way in the use of advancedmembrane bioreactor technology to provide decentralised,high quality water recycling solutions for municipal and privateprojects.
  • LEADING THE WAY WITH MBR TECHNOLOGYMBR plant for Byron Shire Council at Bangalow, NSW with acapacity of 850 kL/day dry weather flow that replaced theexisting sewage treatment plant
  • LEADING THE WAY WITH MBR TECHNOLOGY1.1 ML/d MBR dry weather flow plant for Banana ShireCouncil in Moura, Queensland
  • Nightcap STP Bangalow
  • WATER INFRASTRUCTURE REFURBISHMENTS AND REPLACEMENTSDN1000 Dam Outlet Regulating Valve Replacement, Erhard NeedleValve, Site Service
  • SA WATER RIVERLAND PROJECTManufacture, assembly and testing of sixteen membrane filtrationskids for nine Riverland townships
  • SOUTHERN AND WESTERN SUBURBS OCEAN OUTFALLSEWER REHABILITATION44,000m2 underground concrete culvert refurbishmentthe largest sewer rehabilitation project in Australia for Sydney WaterJoint Venture : ETE, McConnell Dowell, Tyco Water
  • HARDING DAM WATER TREATMENT PLANT KARRATHA WADesign and build plant and buildings
  • ADELAIDE DESAL PILOT PLANTDesign and build 500KLD plant, launched Dec 2008,1 year contract to operate and maintain
  • MACQUARIE SETTLEMENT PIPELINEPrivate irrigation scheme for 17 customers usingsurplus water sourced from Hydro Tasmania
  • CCTV, ROOT CUTTING& ANCILLARY SERVICES4yr contract for all Sydney WaterArea of Operations, including BlueMts & Wollongong – over 1600km ofpipelines & over 1500 manholes
  • CURED IN PLACE LINING5 consecutive 1 yr contracts totalling over 30kmof pipelines at Nowra-Culburra beach and Greenwell Point
  • TAYLORS LAKE – OUTLET AUGMENTATIONModification of the Taylors Lake Outlet as part of theWimmera Mallee Pipeline Project
  • RYDE PUMPING STATIONRefurbishment of the 1500 diameter twin suction mains
  • BERKELEY CARRIER – LINING REPAIRSRepair five types of defects identified in the traverse report
  • MANGAWHAI COMMUNITY SEWERAGE PROJECTSewerage scheme and wastewater treatment plant fora peak population of 15000 people
  • NSOOS REHABILITATION PROJECTContract for internal rehabilitation of two aqueductsat Gore Creek (90m) and Burns Bay (160 m)
  • LEONORA DESAL PLANTChlorine Modules, SAF Pipework, CIP & Flushing System
  • EDUCTION TRUCKAn example of Water Infrastructure Group’s equipment
  • KOORABYE DESALINATION PLANT40m3/day brackish water desalination plant to producepotable water for a remote aboriginal community in theKimberley Region.
  • EDENHOPE REVERSE OSMOSIS PLANTContainerised 0.5ML/day Reverse Osmosis Plant
  • IN-HOUSE FABRICATION OF CONTAINERISED PLANTSMembrane plants for water and wastewater treatment
  • DELIVERING A SUSTAINABLE FUTURE