Company Profile Wooil 2014
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

Company Profile Wooil 2014

  • 785 views
Uploaded on

Construction, Steel Fabrication and Machine Manufacture

Construction, Steel Fabrication and Machine Manufacture

More in: Design , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
785
On Slideshare
622
From Embeds
163
Number of Embeds
3

Actions

Shares
Downloads
7
Comments
0
Likes
0

Embeds 163

http://www.ptwooil.com 134
http://wooilindo.blogspot.com 25
http://www.id.ptwooil.com 4

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Head Office/ Factory Jl.Raya Pasar kemis-Rajeg Kel.Sindangsari, Pasar Kemis Tangerang – Banten Tlp : 021-59350101 Fax : 021-59350123 Email : ptwooil@hotmail.com 1
  • 2. 1 Company Profile 2 Business Fields 3 Organization 4 Picture of Workshop 5 Equipment List 6 Project Experience 7 List of Clients 2
  • 3. 1. Company Profile 1 Location : Tangerang, Banten, Indonesia 2 Registered Name : PT. Woo il Indonesia 3 Office Address : JL.RAYA PASAR KEMIS No. 25, KEC.PASAR KEMIS, DESA SINDANGSARI, TANGERANG 15560, BANTEN, INDONESIA 4 Authorized Capital : US$ 4,200,000 5 Total Asset : US$ 14,250,000 6 Tel No. : + 62 -21- 5935-0101 / Fax No. + 62 -21-5935-0123 7 Work Shop : Shop (8,023m2) / Yard (44,560m2) 8 Established : JUNE 30, 1989 9 CEO & Major Share Holder : Jung, Sung-Koo Education & Experience : Gim Hae, South Korea Korea University, Seoul Worked for S-Oil Refinery Co., Ltd. Seoul 3
  • 4. 2. Business fields <Business fields> 1. Steel Structure Fabricator, Machining & Erection 2. Industrial Machinery Manufacturing & Erection for the Factory, Refinery and other processing plant. 3. Fabrication of Conveyor, Vessel, Storage tank and Silo. 4. Various Steel Structural Products. 5. Fabrication of Production line for Plywood, Tyre making Machinery 6. Ducting, Piping, Hydraulic ,Pneumatic and Electrical Work Head Office Jl.Raya Pasar kemis-Rajeg No.25, Kel.Sindangsari, Pasar Kemis Kab.Tangerang – Banten, Tlp : 021-59350101, Fax : 021-59350123 Email : ptwooil@hotmail.com 4
  • 5. 2. 1 Business fields 7. Plastic Extrusion Machinery – Screw Barrel, Extrusion Mould and Electric Panel 8. Transfer Car, Ware house Drive in Rack. 5
  • 6. IPCR – Indonesia Posco Chosun Refractories Cilegon - Banten Fabrication of whole refractory making facility  Structure S/Bin for Mud, D/C & H/S Mixer  Mud Mixer, D/C Mixer & H/S Mixer  Skip Hoist for Mud Mixer, D/C Mixer & H/S Mixer  Mixer Deck Mud,D/C & H/S  Transfer Car  Tar Tank 6
  • 7. KRAKATAU POSCO PROJECT Cilegon, Banten – Indonesia BLAST FURNACE  FURNACE TOP  Steel Structure, Platform & Stair  Bleeder Valve Inspection Deck  CASTHOUSE  Mould for Main Iron Runner  Mould for Tilting Runner  Main Iron Trough Cover 7
  • 8. DONG SUH Chemical Project Cikande – Banten PROCESS AREA  Steel Construction  Mazzanine Floor  Stair and Deck  Handrail BOILER HOUSE  Steel Construction COMPRESSOR HOUSE  Steel Construction PIPE RACK  Steel Construction DRYER STRUCTURE  Steel Construction WARE HOUSE  Steel Construction PACKING HOUSE  Steel Construction 8
  • 9. KING POST SAMSUNG C&T INTERNATIONAL FINANCIAL CENTER II 9
  • 10. RACK SYSTEM  Drive Rack Raw Material  Pallet Rack  Second Floor Rack  10 
  • 11. STEEL STRUCTURE DOOSAN HEAVY INDUSTRIES Mong Duong II 2x560MW (NET) Coal Fired Power Project Vietnam :  Internal Platform Silo # & Silo #2  Pipe Rack for Silo #1 & Silo #2  Pre – Heating hanging Platform  Pipe Bridges for Silo #1 & Silo #2  Maintenance Hoist  Roof Hoist  11 
  • 12. 3. Location View PT.WOOIL INDONESIA Jl.Raya Pasar Kemis-Rajeg No.25 Kel.Sindangsari, Pasar Kemis Tangerang – Banten Tlp.021-59350101, Fax.021-59350123 TOL JAKARTA – MERAK Guard Tol Kebon Jeruk TOL JAKARTA – MERAK Guard Tol Cikupa-Kedaton Our Location, see below further http://goo.gl/maps/u7Nqf http://www.panoramio.com/photo/94820277  12 
  • 13. 3.1 Organization OF Company CEO Engineering Manager Project Team Fabrication Team Quality Control Quality Assura nce Administration Division <Status of Local Manpower> • Staff • Full time • Part time : 9 Person : 25 Person : 183 Person  13 
  • 14. 3.2 Project Organization SINGLE CONTACT POINT WITH FULL RESPONSIBILITY CLIENT Project Manager FABRICATION MANAGER PROJECT CONTROL MANAGER SCHEDULE COST CONTROL DOCUMENT CONTROL MATERIAL CONTROL PROJECT ENGINEER ENGINEERING MANAGER OPTIMIZATION STUDY PROCESS SIMULATION BASIC ENGINEERING DETAILED ENGINEERING OPERATION SERVICES PROCUREMENT MANAGER PURCHASING EXPEDITING INSPECTION TRAFFIC CONTROL QA / QC MANAGER ADM MANAGER CONSTRUCTION MANAGER COMMISSIONING MANAGER CONST.MANAGEMENT FIELD ENGINEERING PROCUREMENT SAFETY FIELD QA/AC COMMISSIONING START-UP PERFORMANCE TEST  14 
  • 15. 3.3 Company Organization KOREAN INDONESIAN Managerial Staff Administration Engineers (Graduated) - Mechanical / Piping - Electrical -I&C Surveyor Drafter Field Supervisor 1 9 10 1 1 7 3 4 1 3 2 Summary 4 39 1  15 
  • 16. 3.5 Company Organization - WORKER Mobilization Description 1. 2. 3. 4. 5. 6. 7. 8. 9. Pipe Fitters Steel Fabricator Millwright or Mechanical Riggers Welders Insulators Painters Vehicle Mechanics Electricians Total Maximum Mobilization 100 100 150 40 80 130 50 20 40 710  16 
  • 17. 4. Picture of Work Shop Bending M/C Plano Miller Gun drill M/C Radial Drill M/C Sharing Scraf M/C Milling M/C Bending M/C Lathe M/C CNC Plasma & Flame Cutting M/C  17 
  • 18. 4. Picture of Work Shop CNC Plasma cutting M/C- Hypertherm Roller Con’v (Infeed & Outfeed Band Saw H650  18 
  • 19. Work Shop Work Shop Factory Guard Work Shop Work Shop  19 
  • 20. SHOT / SAND BLASTING & PAINTING AREA  20 
  • 21. No. Descriptions Qty. Unit No. Descriptions Qty. Unit 1. Overhead Crane 5 Ton 2 Set 12. Scraf Machine 2 Set 2. Forklift 5 Ton 1 Set 13. CNC Plasma Cutting Machine, Hypertherm 1 Unit 3. Forkllift 3 Ton 2 Set 14. Portable Flame Cutting Machine 6 Set 4. Milling Machine # 10. 1 Set 15. Automatic Flame Cutting Machine 3 Set 5. Milling Machine # 5. 2 Set 16. Bench Grinder 3 Set 6. Gun Drill Machine dia 19 mm – 50 mm 1 Set 17. Air Compressor, 100 HP, 50 HP, 15 HP 3 Set 7. Radial Drilling Machine 3 Set 18. Cutting Wheel Machne 2 Set 8. Plate Roll Bending Machine 15 T 2 Unit 19. Balancing Machine 1 Unit 9. Bending Machine 1 Unit 20. Lathe Machine Max 6 meter, Swing 1.5 meter 5 Set 10. Magnetic Drill 13 Unit 21. Planer Miller, wiidth 1,8 mter, length 15 mtr 1 Unit 11. Shearing Machine 2 Unit 22. Band Sawing Machine, H650, Amada 1 Unit  21 
  • 22. No. Descriptions Qty. Unit Capacity 1. DIESEL ENGINE , ENGINE DEUTZ F3L-912 TAHUN 1997 45 Set MILLER BIG BLUE TYPE : 500DX - 500A / Weld output range : 45 - 500Amp / Rated welding output : 500A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz 2. DIESEL ENGINE, ENGINE DEUTZ F3L-912 TAHUN 2002 12 Set MILLER BIG BLUE TYPE : 602DX - 600A / Weld output range : 45 - 600Amp / Rated welding output : 600A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz 3. DIESEL ENGINE, ENGINE DEUTZ F3L-912 TAHUN 2002 1 Set MILLER BIG BLUE TYPE : 401DX - 400A / Weld output range : 45 - 400Amp / Rated welding output : 400A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz 4. DIESEL ENGINE, ENGINE DEUTZ F3L-912 2 Set MILLER BIG BLUE TYPE : 300A / Weld output range : 45 - 300Amp / Rated welding output : 300A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz 5. DIESEL ENGINE, THERMAL ARC TA 20/500PS, TAHUN 2000 12 Set PERKINS 3.1524-500A / Welding current max : 500Amp / Duty cycle : 60 - 100% / Power : 36 HP (26KW) – 1500 RPM / Voltage : 230V/50Hz, 1 Phase, 12 KVA 6. WELDING RECTIFIER , TAHUN 2001 60 Set DC Rectifier SRH 444 - 500A / Merk MILLER / 3 Phase, 220V/380V - 50Hz / Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding 7. AUTOMATIC WELDING, TAHUN 2005 1 Set Merk ESAB / Double Side Horizontal 8. WELDING RECTIFIER Year 2013 50 Unit DC Rectifier SRH 444 - 500A / MILLER / 3 Phase, 220V/380V - 50Hz / Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding 9. WELDING MACHINE Co2 20 Unit INVERTER, MIG Welding Riland 350 A 10. WELDING RECTIFIER 4 Unit MILLER Delta Weld 402 11. WELDING RECTIFIER, TAHUN 1998 7 Unit DC Rectifier 300 - 400A / AECO/DAIHEN/ESAB LHF 400 / 3 Phase, 220V/380V - 50Hz Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding  22 
  • 23. No. Descriptions Qty. Unit Capacity 12. WELDING RECTIFIER TAHUN 1998 1 Unit DC Rectifier 400A / THERMAL ARC 400 GTS / 3 Phase, 220V/380V - 50Hz Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) / Titanium Welding 13. WIRE FEEDER (CO) TAHUN 2000 2 Unit DC ARC VOLTAGE 15 - 40V - 400A / LINCOLN - LN 25 / 3 Phase, 220V/380V - 50Hz MIG Welding 14. WIRE FEEDER (CO) TAHUN 2000 2 Unit DC ARC VOLTAGE 15 – 40V - 400A / MILLER / 3 Phase, 220V/380V - 50Hz MIG Welding 15. PLASMA CUTTING MACHINE 1 Unit ESAB - PCM 875 / Max. Carbon Steel : 25mm / SUS Max. : 15mm 16. GENERATOR SET SOUND PROOF 1 1 Unit Unit DENYO - 180 SPK Mitsubishi – 100 KVA 17. GENERATOR SET , SOUND PROOF 2 Unit HOKUETSU / Cap. : PDG - 35KVA 18. SANDPOT 4 Set GRACO – USA / Cap. : 1M3 19. PAINTING 2 Set Cap. : 10 Liter  23 
  • 24. No. Descriptions Qty. Unit 21. FORKLIFT 3 Unit KOMATSU/MITSUBISHI Cap. : 3 Ton 1 Unit KATO, Cap. : 30T 22. CRANE TELESCOPIC, TAHUN 1982 Capacity 23. CRANE TELESCOPIC, TAHUN 1997 1 Unit P & H, Cap. : 35T 24. CARGO CRANE, TAHUN 1997 1 Unit TADANO, Cap. : 3T 25. KOBELCO, TAHUN 1998 1 Unit YUTANI, Cap. : 0.8 M3 26. STONE WALES 1 Unit Tahun 1992 27. VEHICLE’S TRUCK ISUZU ELF 135 PS TRUCK MITSUBISHI PICK UP PANTHER PICK UP KIJANG DAIHATSU ROCKY 4WD HINO TRONTON (Blue) 4 Unit Unit Unit Unit Unit Unit Tahun 1997 Tahun 1997 Tahun 1997 Tahun 2003 Tahun 1995 Tahun 1998 2 2 1 1 1  24 
  • 25. 6. Experience Projects CLIENT / LOCATION PROJECT NAME PROJECT PERIOD PT. SK KERIS 1) Fabrication & Erection Quenching Stack 1992. 06 ~ 1993.07 TANGERANG 2) Mechanical & Piping Work For Utility Area 1993. 09 ~ 1994.02 -WEST JAVAINDONESIA 3) Fabrication & Erection Work For Steel Structure , Piping & Equipment For ISBL Area 1994. 02 ~ 1995.11 4) Erection ISP- 4 Polyester Spinning M/C Piping Work 1995. 12 ~ 1997.04 5) Modification Cp-1 & Overhaul 1997. 09 ~ 1998.02 6) Sm#2 For ISP-7a Project 1998.10 ~ 1999.05 HYUNDAI DUTA GRAHA 1) Fabrication & Erection Steel Structure Work 1996.11 ~ 1997.05 PT. CHEIL JEDANG 1) Equipment Erection & Piping Installation 1997.07 ~ 2010.12 2) DISMANTLING & ERECTION OF PADDLE MIXER 2003.07 ~ 2009.12 PT. GARUDA TWIN JAYA 1) Fabrication & Erection Tape Coating Machine 1997.09, 2004.07 BOSOWA CEMENT PROJECT 1) Fabrication & Erection Work For Steel Structure 1997.09 ~ 2010.04 PT. SAMICK INDONESIA 1) Fabrication & Erection Water Painting System 1996.04 ~ 2003.02 2) Fabrication & Erection Duct Line 2003.02 ~ 2010.05 PT. ASPEX KUMBONG 1) Fabrication & Erection Auto Welding System for Container Line 1998.06 ~ 2011.01 PT. SEPARINDO INDUSTRY 1) Fabrication & Erection Equipment & Piping Work 2001.08 ~ 2008.03 PT. DOOSAN HEAVY INDUSTY 1) SIPAT AIR DUCT PROJECT 2005.07 ~ 2006.02 2) PSA - RTGC PROJECT 2006.3 ~ 2006.11 1) Installation Press System 2006.09 ~ 2007.12 REMARK PT. GOLD STAR PAPERTECH  25 
  • 26. 6. Experience Projects CLIENT / LOCATION PROJECT NAME PT. Hankook Tyre 1) Tyre Making machinery Cikarang, West Java PROJECT PERIOD REMARK 2) Hydraulic Trans machine 2011 ~ 2012 3) Fabrication & Erection Work 4) Transfer Car 5) Catridge Roller POCSO E&C Cilegon, Banten IPCR (Refractory making Factory) 1) 2) 3) 4) 5) 6) 7) Steel Structure Fabrication for Krakatau Steel COG, Gas Holder Tank Inspection Deck, Handrail for Blast Furnace Iron Runner Mould Fabrication Iron Runner Trough Fabrication Mould Cover Fabriation Duct, Flange, etc. 2012 .11~ 2013.12 1) 2) 3) 4) Storage Tank 72 Set Steel Structure Mud Making machinery Hoist Crane 2013 .02~ 2013.09 1) 2) 3) 4) 5) 6) 7) Steel Structure for Chemical Plant Process Are Building Boiler House Constrution Compressor House Construction Ware House Constructoin Packing House Construction Pipe Rack Construction Cilegon, Banten Dong Suh Chemical Cikande, Banten 2013 .06~ 2013.09  26 
  • 27. DOOSAN HEAVY INDUSTRIES Mong Duong II wx560MW (NET) Coal Fired Power Project Vietnam 1) 2) 3) 4) 5) 6) 7) Internal Platform Silo #1 & Silo #2 Steel Structure & Pipe Rack Silo 1 & 2 Maintenance Hoist Silo 1 & 2 Roof Hoist Pipe Support & Hangers Cast Plates, Pipe Support, Hangers Pre-Heater Hanging Platform Unit 1 & 2 2013 .09~ 2013.12  27 
  • 28. 7. List of Clients List of CLIENT PT. KRAKATAU STEEL PT. ASPEX KUMBONG PT. CHEIL JEDANG PT. HANKOOK CERAMIC PT. DOOSAN HEAVY INDUSTRY PT. SAMICK INDONESIA PT. HYUNDAI HEAVY INDUSTRY PT. INNE DONGHWA PT. KALIMAS PLYWOOD PT. INDAH KIAT PT. INTI INDORAYON UTAMA PT. KAYU LAPIS PT. RIMBUNAN HIJAU PT. DONG INNE PT. WAENIBE PT. WIJAYA GROUP PT. SUMBER GRAHA SEJAHTERA PT. KOSTRAMAS JAYA PT. BASIRIH INDUSTRI PT. PUTRA SUMBER UTAMA List of CLIENT PT.SK KERIS PT. POSCO E&C PT. HANJUNG Heavy Industry PT. HASKO JAYA PT. TIRTA MAHAKAM PT. HANKOOK TYRE PT. PANCA USAHA PALOPO PT. SEPARINDO PT. LEEWON PT. BOSUNG INDONESIA PT. FEDERAL TIRE PT. GARUDA TWINJAYA PT. DONGSUNG CHEMICAL PT. DAESHIN PT. EURASIA WOOD PT. ABHIRAMA KRESNA PT. OMEGA PRIMAWOOD PT. BALIKPAPAN FOREST PT. BADE MAKMUR ORISSA PT. PRATAMA ABADI  28 