Presented to: Riaz Saehu From Indonesian Embassy, Washington DC  December 8 th , 2006 USAID LOGO HERE! Aceh Road / Bridge ...
Agenda <ul><li>Tsunami Damage and Urgency of Repairs </li></ul><ul><li>Priority Contract </li></ul><ul><li>Long-term Contr...
 
Roadway Damage
Roadway Damage
Roadway Damage
Roadway Damage
Bridge Damage
Bridge Damage
Bridge Damage
Bridge Damage
Immediate Response Government of Indonesia Military (TNI)
Immediate Response Government of Indonesia Military (TNI)
Immediate Response Government of Indonesia Military (TNI)
Immediate Response Government of Indonesia Military (TNI)
CONSTRUCTION PACKAGES LEGEND Priority Contract Task Order #1  Task Order #2     Task Order #3 JICS Alignment BANDA ACEH LA...
Priority  Construction BANDA ACEH Lambeso River Bridge 25 KM 75 Km 92 Km 50 Km SECTION 2  Km15 to Km31 ●   16 Km ●   12 Br...
 
 
 
 
 
 
 
BEFORE AFTER
 
 
 
 
LEGEND Task Order #1 Priority Contract JICS Task Order #2 Task Order #3 SECTION A  Km 5 to Km 13  ●   8 Km ●   No Bridge ●...
<ul><li>Rock Encroachments </li></ul>Before After November 2, 2006
<ul><li>Existing Pavement </li></ul><ul><li>Failures </li></ul>before after
 
 
TASK ORDER NO.2 CALANG TO MEULABOH CALANG <ul><li>Assumptions </li></ul><ul><li>Existing design for JICS bridge (6m wide t...
CONCEPT ANALYSIS – TASK ORDER #2 Proposed Bypass Alignment (Km 220) Calang – Meulaboh Scale 1 : 30000 Option 3B Option 3C
TASK ORDER NO.2 TASK ORDER NO.2  Km 220  to Km 233  ●   13 Km ●   2 Bridges ● 4 Culverts COMPLETION DATE: 30 SEPTEMBER 200...
To Meulaboh
 
 
 
TASK ORDER NO.3 MEULABOH bypass CALANG <ul><li>Assumptions </li></ul><ul><li>Existing design for JICS bridge (6m wide to r...
TO#3 TASK ORDER NO.3 239 COMPLETION DATE: 30 SEPTEMBER 2009 243 OPTION 1 OPTION 2 Existing Road JICS Alignment
<ul><li>IDENTIFY ROW PLANS </li></ul><ul><li>Preliminary Plan/profiles with 30m ROW </li></ul><ul><li>Adjust ROW for High ...
GOI – LA Mechanisms ●  Laws relating to LA ●  Establishment of LAC Mechanism ●  Price determination ●  Measurements ●  Inv...
LAND ACQUISITION CALANG BANDA ACEH LEGEND Land Areas & Owners  Identified Land Purchased
LAMNO LEGEND Task Order #1 Priority Contract JICS Task Order #2 PROJECT OVERVIEW Total parcels to be purchased - 963 Total...
Desa Keutapang Desa Lamjuhang Desa Mns Cot Desa Glee Bruek Desa Pudeng Desa Pasie SECTION 1 55+500 to 65+128 Pudeng river ...
Land Acquisition  WIKA Priority Section Section 1 Total km to be purchased   -  9.5km  (not including government land)  To...
Desa Lamsenia Desa Lamkruet Desa Pulot Desa Deah Mamplan Desa Layeun Desa  Meunasah Bak’U SECTION 2 15+221 to 29+593 Raba ...
Land Acquisition  WIKA Priority Section Section 2 Total km to be purchased   - approx 16 km  Total parcels to be purchased...
Desa Krueng Kalla SECTION 3  –  44+300 to 45+802 Kalla river GOI target date: 1 December 2006 Not Begun Measurement/Data C...
Land Acquisition  WIKA Priority Section Section 3 Total km to be purchased   -  approx 1.5km  Total parcels to be purchase...
Desa Glee Putoh Desa Meunasah Weh Desa Leupee Desa Lamme Desa Lhuet Desa Meuntara Desa Babah Dua Desa Teumareum Desa Kuala...
Land Acquisition   WIKA Priority Section Section 4 Total km to be purchased   - approx 13km  Total parcels to be purchased...
LEGEND Task Order #1 Priority Contract JICS Task Order #2 PROJECT OVERVIEW Total parcels to be purchased - 2760 Total purc...
Desa Jantang LHOONG  46+150 to 52+014 GOI target date: 1 December 2006 Desa Baroh Blang Me Desa Tengoh Blang Me Desa Lamku...
Land Acquisition   International Contract Total km to be purchased   - approx 5.9 km  Total parcels to be purchased - 383 ...
Desa Meudheun Desa Sapek Desa Lamtui Desa Glee Putoh Desa Lambaro Desa Ceunamprong JAYA  70+400 to 101+200 GOI target date...
Land Acquisition   International Contract *  Corrected for station equation Total km to be purchased   - approx 20.08 km  ...
Desa Lhok Kruet SAMPOINIET  101+200 to 127+900 GOI target date: 15 December 2006 15 January 2007 Desa Patek Desa Blang Dal...
Land Acquisition   International Contract * Corrected for station equation Total km to be purchased   - approx 26.655 km  ...
SETIA BAKTI & KRUENG SABEE  127+900 to 152+857 GOI target date: 20 November 2006 30 November 2006 Desa Dayah Baro Desa Gam...
Land Acquisition   International Contract * Corrected for station equation Total km to be purchased   - approx 19.729 km  ...
Land Acquisition   International Contract Total km to be purchased   - approx 3.910 km  Total parcels to be purchased - 12...
Land Acquisition Tracking
LAND ACQUISITION TRACKING
Community Outreach Information and Data Coordination and Facilitation
Community Outreach <ul><li>Rounds II and III of Public Consultations  </li></ul><ul><li>Consultations with local governmen...
Coordination and Facilitation <ul><li>Facilitate and assist BRR and Land Acquisition Committees with ROW issues  </li></ul...
Information and Data <ul><li>Creation and maintenance of database of information for use by Parsons, BRR and other relevan...
Environmental Protection Aceh Road/Bridge Reconstruction And Rehabilitation Project
Summary – Mitigation includes: <ul><li>Prevention (most desirable).   </li></ul><ul><li>Remediation.   </li></ul><ul><li>O...
BEST MANAGEMENT PRACTICES <ul><li>Environmental Review Document  ( ERD ) </li></ul><ul><ul><li>Check box: 17 Best Manageme...
Membangun dam, bak penampungan,  energy dissipaters , dan upaya lainnya untuk mengontrol aliran air (Lihat rancangan terin...
EROSION CONTROL
BEST MANAGEMENT PRACTICE BMP-1  to Decrease Erosion and Sediment BMP-2  to avoid obstructing water flow/to enhance drainag...
EROSION CONTROL REQUIRED
Brush Mattress – River Bank
Lhoong River
Lhoong River – No Siltation Fence
BEST MANAGEMENT PRACTICES <ul><li>BMP-6  to Increase Public Safety </li></ul><ul><li>BMP-7  to Increase Worker Safety </li...
BEST MANAGEMENT PRACTICE <ul><li>BMP-17  to minimize contamination due to  Spills or Hazardous Materials.  </li></ul><ul><...
OIL SPILL – Asphalt Plant
Ponding Oil – Asphalt Plant
BEST MANAGEMENT PRACTICES <ul><li>-   BMP-14  to reduce and mitigate ecological impacts by introducing ecological compensa...
Toilet Facilities – Tidak Boleh
Leupung toilet – Tidak Boleh Toilet facility
BEST MANAGEMENT PRACTICES <ul><li>BMP-11  to minimize and control the disposal of Solid, Chemical and Sanitary Wastes </li...
Close-up of Sewage System
Sewage System
Constructed Wetlands
SILTATION FENCE
SEDIMENTATION PONDS - Bridge Siltation Fence Sedimentation Ponds
SEDIMENTION POND – Siltation fence needed.
Filling sand bags for Lhoong River
Waste Material – reuse for planting
BEST MANAGEMENT PRACTICES <ul><li>BMP-12  to Minimize Impacts to Flora and Fauna </li></ul><ul><li>BMP-10  to Minimize Imp...
ROAD KILL <ul><li>Ocelot – Km 100 </li></ul>
ROAD KILL  (Monitor Lizard (varanus salvator)
HOW LOUD IS TOO LOUD?    STANDARD: 70 dBA <ul><li>>85 dBA  over time, will cause hearing loss </li></ul><ul><li>Maximum ex...
PEOPLE
BEST MANAGEMENT PRACTICES <ul><li>BMP-4  to Minimize Dust Pollution: </li></ul><ul><li>BMP-5  to Minimize Noise </li></ul>...
Road Location - Compensate for wetland destroyed.
Road Construction in Wetland
ABANDONED ROAD – COMPENSATION   Take up – Reuse – Replant.
MANGROVE PLANTS - LOCAL
MANGROVE PLANTING DENSITY
SAND DUNE – BLOCKING OUTLET
FLOOD AREA – BRIDGE & 6 VILLAGES
SAND DUNE CHANNEL
<ul><li>Environmental  Preparedness for Spills and other emergencies </li></ul><ul><li>Contingency Planning </li></ul><ul>...
PLANS Required <ul><li>Spill Prevention Control and Countermeasures (SPCC) Plan  </li></ul><ul><li>Emergency Response Plan...
JUST IN CASE!
<ul><li>Thank You </li></ul>
Upcoming SlideShare
Loading in …5
×

Ppt 8 12 2006

759 views

Published on

Presented to Indonesian Ambassador for US.

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
759
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Government Land STA 64+900 - 65+128 (Geureute)
  • This map will need to be updated when we know signatures have been collected (both from pemilik tanah and tokoh pemda) for Gleebruk and Pudeng. Pasi still has a way to go I think. Also re the government land that is indicated in the map for Mns Lhok, Yuswar has to check this land in the field but it seems as though we made a mistake and should not have coloured in 62+300 - 62 +650 on the maps we sent to BRR!
  • Measurements have only begun in Deah mamplan. The other areas should remain white.
  • Coordination with Parsons to prioritize villages for consultation either in WIKA priority areas or other areas where construction will begin upon signing of contract and ROW. Develop appropriate outreach materials including location of road alignment in individual villages, renderings of road, information provided by BRR regarding the land acquisition process, and the construction process.
  • Ppt 8 12 2006

    1. 1. Presented to: Riaz Saehu From Indonesian Embassy, Washington DC December 8 th , 2006 USAID LOGO HERE! Aceh Road / Bridge Reconstruction and Rehabilitation Project
    2. 2. Agenda <ul><li>Tsunami Damage and Urgency of Repairs </li></ul><ul><li>Priority Contract </li></ul><ul><li>Long-term Contract </li></ul><ul><ul><li>Banda Aceh to Calang (Task Order No.1) </li></ul></ul><ul><ul><li>Calang to Meulaboh (Task Order No.2) </li></ul></ul><ul><ul><li>Meulaboh Bypass (Task Order No.3) </li></ul></ul><ul><li>Land Acquisition </li></ul><ul><li>Community Outreach </li></ul><ul><li>Environmental Protection </li></ul>
    3. 4. Roadway Damage
    4. 5. Roadway Damage
    5. 6. Roadway Damage
    6. 7. Roadway Damage
    7. 8. Bridge Damage
    8. 9. Bridge Damage
    9. 10. Bridge Damage
    10. 11. Bridge Damage
    11. 12. Immediate Response Government of Indonesia Military (TNI)
    12. 13. Immediate Response Government of Indonesia Military (TNI)
    13. 14. Immediate Response Government of Indonesia Military (TNI)
    14. 15. Immediate Response Government of Indonesia Military (TNI)
    15. 16. CONSTRUCTION PACKAGES LEGEND Priority Contract Task Order #1 Task Order #2 Task Order #3 JICS Alignment BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50 30 September 2009 Task Order No.3 30 September 2009 Task Order No.2 30 September 2009 Task Order No.1 31 December 2007 Priority Contract COMPLETION DATE CONTRACT
    16. 17. Priority Construction BANDA ACEH Lambeso River Bridge 25 KM 75 Km 92 Km 50 Km SECTION 2 Km15 to Km31 ● 16 Km ● 12 Bridges ● 19 Culverts SECTION 1A & 1B Km 55 to Km 65 ● 10 Km ● 3 Bridges ● 8 Culverts SECTION 3 Km 46 to Km 47 ● 1Km ● 1 Bridge ● No Culvert SECTION 4 Km 79 to Km 92 ● 13 Km ● 8 Bridges ● 16 Culverts LAMNO Total Length = 40 Km LEGEND : Major Bridges COMPLETION DATE: 31 DECEMBER 2007 Raba River Bridge Lhoong & Meunasah River Bridges 0 KM
    17. 25. BEFORE AFTER
    18. 30. LEGEND Task Order #1 Priority Contract JICS Task Order #2 Task Order #3 SECTION A Km 5 to Km 13 ● 8 Km ● No Bridge ● 9 Culverts SECTION B Km 30 to Km 44 ● 14 Km ● No Bridge ● No Culvert SECTION C Km 47 to Km 52 ● 6 Km ● 2 Bridges ● 3 Culverts SECTION D Km 62 to Km 78 ● 16 Km ● 5 Bridges ● 5 Culverts SECTION E Km 92 to Km 152 ● 60 Km ● 18 Bridges ● 48 Culverts TASK ORDER NO.1 banda aceh to calang COMPLETION DATE: 30 SEPTEMBER 2009 BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50
    19. 31. <ul><li>Rock Encroachments </li></ul>Before After November 2, 2006
    20. 32. <ul><li>Existing Pavement </li></ul><ul><li>Failures </li></ul>before after
    21. 35. TASK ORDER NO.2 CALANG TO MEULABOH CALANG <ul><li>Assumptions </li></ul><ul><li>Existing design for JICS bridge (6m wide to remain) </li></ul><ul><li>Road will become National Highway </li></ul><ul><li>Pavement structure to 10 years design life </li></ul>LEGEND Construct New Alignment JICS Alignment to remain MEULABOH COMPLETION DATE: 30 SEPTEMBER 2009 220 233 239 200 175
    22. 36. CONCEPT ANALYSIS – TASK ORDER #2 Proposed Bypass Alignment (Km 220) Calang – Meulaboh Scale 1 : 30000 Option 3B Option 3C
    23. 37. TASK ORDER NO.2 TASK ORDER NO.2 Km 220 to Km 233 ● 13 Km ● 2 Bridges ● 4 Culverts COMPLETION DATE: 30 SEPTEMBER 2009 220 233
    24. 38. To Meulaboh
    25. 42. TASK ORDER NO.3 MEULABOH bypass CALANG <ul><li>Assumptions </li></ul><ul><li>Existing design for JICS bridge (6m wide to remain) </li></ul><ul><li>Road will become National Highway </li></ul><ul><li>Pavement structure to 10 years design life </li></ul>LEGEND Construct New Alignment JICS Alignment to remain MEULABOH COMPLETION DATE: 30 SEPTEMBER 2009 220 233 239 200 175
    26. 43. TO#3 TASK ORDER NO.3 239 COMPLETION DATE: 30 SEPTEMBER 2009 243 OPTION 1 OPTION 2 Existing Road JICS Alignment
    27. 44. <ul><li>IDENTIFY ROW PLANS </li></ul><ul><li>Preliminary Plan/profiles with 30m ROW </li></ul><ul><li>Adjust ROW for High Fills/Cuts/Bridges </li></ul><ul><li>Obtain GOI Approval </li></ul>2. SURVEYORS STAKE-OUT CENTERLINE & ROW 3. GOI IDENTIFIES AFFECTED PROPERTIES, CALCULATES AREAS & STARTS ACQUISITION PROCESS 4. GOI ISSUES SIGNED DRAWINGS WHEN ACQUISITION COMPLETED 5. START CONSTRUCTION
    28. 45. GOI – LA Mechanisms ● Laws relating to LA ● Establishment of LAC Mechanism ● Price determination ● Measurements ● Inventory / assets list ● Appraisal ● Landowner agreements Ratification LA Procedures LAC Pemda District Provincial BRR ● Working Group ● KPPN Khusus Payment ● Verification of data ● Order to pay ● Direct to bank account Release of Land for Construction
    29. 46. LAND ACQUISITION CALANG BANDA ACEH LEGEND Land Areas & Owners Identified Land Purchased
    30. 47. LAMNO LEGEND Task Order #1 Priority Contract JICS Task Order #2 PROJECT OVERVIEW Total parcels to be purchased - 963 Total purchased to date – 144 (as of 06.12.06) Remaining - 819 Priority Contract BANDA ACEH CALANG MEULABOH 25 150 175 200 225 75 100 125 50
    31. 48. Desa Keutapang Desa Lamjuhang Desa Mns Cot Desa Glee Bruek Desa Pudeng Desa Pasie SECTION 1 55+500 to 65+128 Pudeng river Lhoong river Desa Meunasah Lhok GOI target date: 1 December 2006 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
    32. 49. Land Acquisition WIKA Priority Section Section 1 Total km to be purchased - 9.5km (not including government land) Total parcels to be purchased - 229 Total km purchased to date - 5.5 km (28.11.06) Total purchased to date - 102 Remaining - 4km Remaining - 127 * WIKA contract begins STA 55+500 ** Corrected for station equation 1 December 2006 14 0.977** 62+300 61+350 Lhoong Pasi 1 December 2006 41 0.850 61+350 60+500 Lhoong Pudeng 1 December 2006 24 0.925 60+500 59+575 Lhoong Glee Bruek Complete 45 2.650 64+950 62+300 Lhoong Meunasah Lhok Complete 16 1.375 59+575 58+200 Lhoong Meunasah Cot Complete 35 1.525 58+200 56+675 Lhoong Keutapang 1 December 2006 54 1.369** 56+675 51+850 Lhoong Lamjuhang* GOI target date Total parcels Distance To From Sub-District Location
    33. 50. Desa Lamsenia Desa Lamkruet Desa Pulot Desa Deah Mamplan Desa Layeun Desa Meunasah Bak’U SECTION 2 15+221 to 29+593 Raba river Dutch river Sara river GOI target date: 31 January 2007 (Lhok Nga) : 15 January 2007 (Leupung) Desa Mon Ikeun Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
    34. 51. Land Acquisition WIKA Priority Section Section 2 Total km to be purchased - approx 16 km Total parcels to be purchased - 352 Total km purchased to date - 0 km Total parcels purchased to date - 0 Remaining - 16 km Remaining - 352 ** Corrected for station equation 15 January 2007 50 2.018 30+300 27+575 Leupung Layeun 15 January 2007 45 1.725 27+575 25+850 Leupung Pulot 15 January 2007 30 1.450 25+850 24+400 Leupung Lamsenia 15 January 2007 32 1.175 24+400 23+225 Leupung Meunasah Bak’u 15 January 2007 106 5.315** 23+225 19+525 Leupung Deah Mamplam 31 January 2007 75 3.725 19+525 15+800 Lhok Nga Mon Ikeun 31 January 2007 14 0.579 15+800 15+221 Lhok Nga Lamkruet GOI target date Total parcels Distance To From Sub-district Location
    35. 52. Desa Krueng Kalla SECTION 3 – 44+300 to 45+802 Kalla river GOI target date: 1 December 2006 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
    36. 53. Land Acquisition WIKA Priority Section Section 3 Total km to be purchased - approx 1.5km Total parcels to be purchased - 60 Total km purchased to date - 1.01 km Total parcels purchased to date - 43 Remaining - 0.49 km Remaining - 17 ** Corrected for station equation 1 December 2006 60 1.552** 46+150 44+300 Lhoong Krueng Kalla GOI target date Total parcels Distance To From Sub-District Location
    37. 54. Desa Glee Putoh Desa Meunasah Weh Desa Leupee Desa Lamme Desa Lhuet Desa Meuntara Desa Babah Dua Desa Teumareum Desa Kuala Desa Bahagia Desa Meudangghon Desa Kareung Ateuh Desa Kuala Unga SECTION 4 – 79+325 to 92+221 Lambeso river GOI target date: 31 January 2007 Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND N
    38. 55. Land Acquisition WIKA Priority Section Section 4 Total km to be purchased - approx 13km Total parcels to be purchased - 322 Total km purchased to date - 0 km Total parcels purchased to date - 0 Remaining - 13 km Remaining - 322 * WIKA contract begins STA 79+325 ** Corrected for station equation 31 January 2007 28 3.520** 88+720 90+700 Jaya Kuala Unga 31 January 2007 61 2.800 90+700 87+900 Jaya Kareung Ateuh 31 January 2007 54 2.000 87+900 85+900 Jaya Meudangghon 31 January 2007 10 1.100 85+900 84+800 Jaya Bahagia 31 January 2007 15 1.000 84+800 83+800 Jaya Kuala 31 January 2007 27 1.200 83+800 82+600 Jaya Teumarem 31 January 2007 10 0.375 82+600 82+225 Jaya Babah Dua 31 January 2007 19 0.300 82+225 81+925 Jaya Meuntara 31 January 2007 22 0.500 81+925 81+425 Jaya Lhuet 31 January 2007 14 0.225 81+425 81+200 Jaya Lamme 31 January 2007 18 0.625 81+200 80+575 Jaya Leupee 31 January 2007 28 0.950 80+575 79+625 Jaya Meunasah Weh 31 January 2007 16 2.841** 79+625 75+550 Jaya Glee Putoh* GOI target date Total parcels Distance To From Sub-distruct Location
    39. 56. LEGEND Task Order #1 Priority Contract JICS Task Order #2 PROJECT OVERVIEW Total parcels to be purchased - 2760 Total purchased to date – 354 (as of 06.12.06) Remaining - 2406 Task Order #1 BANDA ACEH LAMNO CALANG MEULABOH 25 150 175 200 225 75 100 125 50
    40. 57. Desa Jantang LHOONG 46+150 to 52+014 GOI target date: 1 December 2006 Desa Baroh Blang Me Desa Tengoh Blang Me Desa Lamkuta Blang Me Desa Lamgeuriheu Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
    41. 58. Land Acquisition International Contract Total km to be purchased - approx 5.9 km Total parcels to be purchased - 383 Total km purchased to date - 3.4 km Total parcels purchased to date - 225 Remaining - 2.5 km Remaining - 158 1 December 2006 55 0.750 51+850 51+100 Lhoong Lamgeuriheu 1 December 2006 78 1.300 51+100 49+800 Lhoong Lamkuta Blang Me 1 December 2006 22 0.250 49+800 49+550 Lhoong Tengoh Blang Me 1 December 2006 89 1.750 49+550 47+800 Lhoong Baroh Blang Me 1 December 2006 139 1.650 47+800 46+150 Lhoong Jantang GOI Target Date Total Parcel Distance To From Sub-District Village
    42. 59. Desa Meudheun Desa Sapek Desa Lamtui Desa Glee Putoh Desa Lambaro Desa Ceunamprong JAYA 70+400 to 101+200 GOI target date: 31 January 2007 Priority Section Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
    43. 60. Land Acquisition International Contract * Corrected for station equation Total km to be purchased - approx 20.08 km Total parcels to be purchased - 467 Total km purchased to date - 0 km Total parcels purchased to date - 0 Remaining - 20.08 km Remaining - 467 31 January 2007 152 12.480* 101+200 88+720 Jaya Ceunamprong 31 January 2007 84 2.841* 79+625 75+550 Jaya Meulha/Glee Putoh 31 January 2007 22 0.725 75+550 74+825 Jaya Lamtui 31 January 2007 68 1.725 74+825 73+100 Jaya Lambaro 31 January 2007 34 1.100 73+100 72+000 Jaya Sapek 31 January 2007 107 1.600 72+000 70+400 Jaya Meudheun GOI Target Date Total Parcel Distance To From Sub-District Village
    44. 61. Desa Lhok Kruet SAMPOINIET 101+200 to 127+900 GOI target date: 15 December 2006 15 January 2007 Desa Patek Desa Blang Dalam Desa Gampong Baru Desa Kuala Bakong Desa Jeumpheuk Desa Babah Nipah Desa Kuala Ligan Desa Meunasah Kulam Desa Crak Mong Desa Krueng No Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
    45. 62. Land Acquisition International Contract * Corrected for station equation Total km to be purchased - approx 26.655 km Total parcels to be purchased - 676 Total km purchased to date - 0 km Total parcels purchased to date - 0 Remaining - 26.655 km Remaining - 676 GOI Target Date Total Parcel Dist. To From Sub-District Village 15 January 2007 165 3.825 127+900 124+075 Sampoiniet Patek 15 January 2007 13 0.725 124+075 123+350 Sampoiniet Blang Dalam 15 January 2007 21 0.850 123+350 122+500 Sampoiniet Gampong Baru 15 January 2007 37 2.500 122+500 120+000 Sampoiniet Kuala Bakong 15 January 2007 55 1.725 120+000 118+275 Sampoiniet Jeumpheuk 15 January 2007 21 1.375 118+275 116+900 Sampoiniet Babah Nipah 15 January 2007 76 3.812* 116+900 113+100 Sampoiniet Kuala Ligan 15 January 2007 94 2.500 113+100 110+600 Sampoiniet Lhok Kruet 15 January 2007 44 1.825 110+600 108+775 Sampoiniet Meunasah Kulam 15 January 2007 65 2.175 108+775 106+600 Sampoiniet Crak Mong 15 January 2007 85 5.456* 106+600 101+200 Sampoiniet Krueng No
    46. 63. SETIA BAKTI & KRUENG SABEE 127+900 to 152+857 GOI target date: 20 November 2006 30 November 2006 Desa Dayah Baro Desa Gampong Blang Desa Keutapang Desa Panton Makmur Desa Lhok Buya Desa Sayeung Desa Lhok Timon Desa Geulumpang Desa Sawang Not Begun Measurement/Data Collection Administration Collection of Signatures Verification/Payment Satker BRR Government Land Land Purchased LEGEND
    47. 64. Land Acquisition International Contract * Corrected for station equation Total km to be purchased - approx 19.729 km Total parcels to be purchased - 1110 Total km purchased to date - 3 km Total parcels purchased to date - 98 Remaining - 16.729 km Remaining - 1012 GOI Target Date Total Parcel Dist. To From Sub-District Village 20 December 2006 79 1.190 147+640 146+450 Setia Bakti Lhok Buya 20 December 2006 174 2.450 146+450 144+000 Setia Bakti Gampong Baro 20 December 2006 312 3.300 144+000 140+700 Setia Bakti Lhok Timon 20 December 2006 266 6.000 140+700 134+700 Setia Bakti Lhok Geulumpang 30 November 2006 279 6.789* 134+700 127+900 Setia Bakti Sawang
    48. 65. Land Acquisition International Contract Total km to be purchased - approx 3.910 km Total parcels to be purchased - 124 Total km purchased to date - 1 km Total parcels purchased to date - 31 Remaining - 2.91 km Remaining - 93 GOI Target Date Total Parcel Dist. To From Sub-District Village 15 January 2007 31 1.580 151+550 149+970 Krueng Sabee Keutapang 15 January 2007 22 0.690 149+970 149+280 Krueng Sabee Dayah Baro 15 January 2007 9 0.225 149+280 149+025 Krueng Sabee Gampong Blang 15 January 2007 62 1.385 149+025 147+640 Krueng Sabee Panton Makmur
    49. 66. Land Acquisition Tracking
    50. 67. LAND ACQUISITION TRACKING
    51. 68. Community Outreach Information and Data Coordination and Facilitation
    52. 69. Community Outreach <ul><li>Rounds II and III of Public Consultations </li></ul><ul><li>Consultations with local governments on worker camp locations, designs and procedures </li></ul><ul><li>Assist contractor with sensitizing non-local work force to local cultural norms </li></ul><ul><li>Develop and implement mechanism to address conflicts during the construction process </li></ul>
    53. 70. Coordination and Facilitation <ul><li>Facilitate and assist BRR and Land Acquisition Committees with ROW issues </li></ul><ul><li>Coordinate with FHI and NCBA in development of proactive livelihood initiatives for women </li></ul><ul><li>Coordinate with FHI and local gov’t on issues relating to worker health </li></ul><ul><li>Facilitate implementation of greenway program with SPD and ESP </li></ul><ul><li>Facilitate funding and construction of tsunami memorial </li></ul>
    54. 71. Information and Data <ul><li>Creation and maintenance of database of information for use by Parsons, BRR and other relevant stakeholders </li></ul><ul><li>Disseminate road and MOT information to communities </li></ul><ul><li>Assist with dissemination of environmental information to communities and relevant stakeholders </li></ul>
    55. 72. Environmental Protection Aceh Road/Bridge Reconstruction And Rehabilitation Project
    56. 73. Summary – Mitigation includes: <ul><li>Prevention (most desirable). </li></ul><ul><li>Remediation. </li></ul><ul><li>Ongoing maintenance and operating practices. </li></ul><ul><li>Offsetting actions. </li></ul>
    57. 74. BEST MANAGEMENT PRACTICES <ul><li>Environmental Review Document ( ERD ) </li></ul><ul><ul><li>Check box: 17 Best Management Practices </li></ul></ul><ul><li>Monitoring Plan </li></ul><ul><ul><li>Check mitigation measures </li></ul></ul><ul><li>Non-Compliance Notification – Inform contractor </li></ul><ul><li>Monitoring Report – Inform project proponents </li></ul>
    58. 75. Membangun dam, bak penampungan, energy dissipaters , dan upaya lainnya untuk mengontrol aliran air (Lihat rancangan terinci). Jika dibutuhkan, sedimentasi akan ditampung pada kolam sementara atau permanen. Kolam tsb dirancang utk menampung aliran air utk masa 20 tahun hujan, lalu dikeringkan dan sedimentasi dikuras. Subkontraktor akan melakukan program monitoring kualitas efluen. Build dams, settling basins, energy dissipaters, and other measures, to control downstream flows (See design details). If necessary, sediment shall be trapped in temporary or permanent sediment basins. The basins shall be designed to accommodate runoff from a local 20‑year storm and shall be pumped dry and all sediment removed after each storm. The site subcontractor shall institute effluent quality monitoring programs. Mempersiapkan rencana pemompaan utk pekerjaan di bawah muka air. Rencana pemompaan air akan ditinjau dan disetujui oleh Pemerintah Amerika dan Pemerintah RI sebelum dimulainya konstruksi. Provide a dewatering plan for work at minus water levels. The dewatering plan shall be reviewed and approved by the U.S. Government and the GOI prior to the beginning of construction Ya BMP-1 Untuk mengurangi erosi dan sedimentasi Menyediakan saluran, tanggul, gorong-gorong, dan pencegahan lain utk memperlambat & mengendalikan aliran air dari lokasi konstruksi, mengendalikan air permukaan dan untuk melindungi saluran. BMP-1 to Decrease Erosion and Sediment Provide ditches, berm, culverts, and other measures to mechanically retard and control runoff from the construction site, to control surface water and to protect drainage courses. Tahap 3 - Tentukan Praktik Pengelolaan Terbaik Mitigasi Praktik Pengelolaan Terbaik (Tandai Kegiatan yang Sesuai): Step 3 - Prescribe Best Management Practices (BEP’s) Mitigation Best Management Practice (BMPs) (Check Appropriate Action):
    59. 76. EROSION CONTROL
    60. 77. BEST MANAGEMENT PRACTICE BMP-1 to Decrease Erosion and Sediment BMP-2 to avoid obstructing water flow/to enhance drainage pattern: BMP-3 to minimize impacts to natural resources
    61. 78. EROSION CONTROL REQUIRED
    62. 79. Brush Mattress – River Bank
    63. 80. Lhoong River
    64. 81. Lhoong River – No Siltation Fence
    65. 82. BEST MANAGEMENT PRACTICES <ul><li>BMP-6 to Increase Public Safety </li></ul><ul><li>BMP-7 to Increase Worker Safety </li></ul>
    66. 83. BEST MANAGEMENT PRACTICE <ul><li>BMP-17 to minimize contamination due to Spills or Hazardous Materials. </li></ul><ul><li>- SPCC Plan: Develop a Spill Prevention, Control and Countermeasures plan. </li></ul><ul><li>- Equipment Staging and Maintenance </li></ul><ul><li>- Fueling Area </li></ul><ul><li>- Hazardous Material Staging Area </li></ul><ul><li>- Hazardous Waste Storage Area </li></ul>
    67. 84. OIL SPILL – Asphalt Plant
    68. 85. Ponding Oil – Asphalt Plant
    69. 86. BEST MANAGEMENT PRACTICES <ul><li>- BMP-14 to reduce and mitigate ecological impacts by introducing ecological compensation measures. </li></ul><ul><li>- BMP- 15 provides for all its employees adequate health care, water, and sanitation facilities as stated in the approved Site Safety and Health (SSHP) Plan. </li></ul><ul><li>- BMP-16 Basic planning considerations for an Emergency Response (ERP) Plan. </li></ul>
    70. 87. Toilet Facilities – Tidak Boleh
    71. 88. Leupung toilet – Tidak Boleh Toilet facility
    72. 89. BEST MANAGEMENT PRACTICES <ul><li>BMP-11 to minimize and control the disposal of Solid, Chemical and Sanitary Wastes </li></ul><ul><li>BMP-12 to Minimize Impacts to Flora and Fauna </li></ul><ul><li>BMP-13 to Minimize Disease Transmission </li></ul>
    73. 90. Close-up of Sewage System
    74. 91. Sewage System
    75. 92. Constructed Wetlands
    76. 93. SILTATION FENCE
    77. 94. SEDIMENTATION PONDS - Bridge Siltation Fence Sedimentation Ponds
    78. 95. SEDIMENTION POND – Siltation fence needed.
    79. 96. Filling sand bags for Lhoong River
    80. 97. Waste Material – reuse for planting
    81. 98. BEST MANAGEMENT PRACTICES <ul><li>BMP-12 to Minimize Impacts to Flora and Fauna </li></ul><ul><li>BMP-10 to Minimize Impacts from Borrow Pit and/or Quarry Excavation </li></ul>
    82. 99. ROAD KILL <ul><li>Ocelot – Km 100 </li></ul>
    83. 100. ROAD KILL (Monitor Lizard (varanus salvator)
    84. 101. HOW LOUD IS TOO LOUD? STANDARD: 70 dBA <ul><li>>85 dBA over time, will cause hearing loss </li></ul><ul><li>Maximum exposure time: 8 hours </li></ul><ul><li>110 dBA : Max. time : 1 minute and 29 seconds – will cause hearing loss </li></ul><ul><li>75-85 dBA : flush toilet </li></ul><ul><li>95 dBA : electric drill </li></ul><ul><li>125 dBA : chain saw </li></ul><ul><li>120 dBA : jet plane </li></ul>
    85. 102. PEOPLE
    86. 103. BEST MANAGEMENT PRACTICES <ul><li>BMP-4 to Minimize Dust Pollution: </li></ul><ul><li>BMP-5 to Minimize Noise </li></ul><ul><li>BMP-8 to Increase Relation of Socio Economic </li></ul><ul><li>BMP-9 to Minimize Land-Take Issues </li></ul>
    87. 104. Road Location - Compensate for wetland destroyed.
    88. 105. Road Construction in Wetland
    89. 106. ABANDONED ROAD – COMPENSATION Take up – Reuse – Replant.
    90. 107. MANGROVE PLANTS - LOCAL
    91. 108. MANGROVE PLANTING DENSITY
    92. 109. SAND DUNE – BLOCKING OUTLET
    93. 110. FLOOD AREA – BRIDGE & 6 VILLAGES
    94. 111. SAND DUNE CHANNEL
    95. 112. <ul><li>Environmental Preparedness for Spills and other emergencies </li></ul><ul><li>Contingency Planning </li></ul><ul><li>Training </li></ul><ul><li>Capacity Building </li></ul><ul><li>Notification Procedures </li></ul><ul><li>Simulation Exercises </li></ul>
    96. 113. PLANS Required <ul><li>Spill Prevention Control and Countermeasures (SPCC) Plan </li></ul><ul><li>Emergency Response Plan (ERP) </li></ul><ul><li>Site Safety and Health (SSHP) Plan </li></ul><ul><li>Borrow Excavation & Restoration Plan (BERP) </li></ul>
    97. 114. JUST IN CASE!
    98. 115. <ul><li>Thank You </li></ul>

    ×