Curriculum vitae

389 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
389
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Curriculum vitae

  1. 1. Curriculum vitae Designed, produced and photographs by Alan Watson for Alan Watson
  2. 2. Index History Contracts and references/appraisals Multimedia H & S induction Certificates Contact Details
  3. 3. 1995 - 2006Profile WFC Interiors Senior Site Manager/Site Manger A candidate with a number of excellent references from a variety of employers and clients,where he has undertaken projects of up to £6m. With an exceptional background in the Duties as above on various refurbishment and fit-out contracts. Projects included;retail, refurbishment and fit-out projects for clients such as David Lloyd Leisure, Esporta, Q · Oceana, Leeds. Complete fit-out of nightclub. Value £6m.Hotels and The Royal Society of Medicine, he has worked on many “live” environments to · The One Eyed Cat, Truro, Cornwall. Conversion of a Grade 2 listed chapel, endertight programmes and fast-track contracts. His nature and communication skills are well English Heritage, into a bar/restaurant. Value £700,000.suited to this type of work where liaison with clients and sometimes the public are critical. · David Lloyd Leisure, Woking and Enfield. TPC Contract. Value £2mIs now looking for an opportunity where he can use his existing skills with a reputable · Liquid & Diva, Shrewsbury. Complete fit-out of a nightclub. Value £3m.company. · Rendezvous Casino, Southend and Brighton. · Le Meridian Hotel, Picadilly. Refurbishment of Health Club.Qualifications · Esporta, Stoke-on-Trent. Fit-out from shell of health club/gym. · Tiger Tiger, Birmingham. Complete fit-out of 30,000 sq. ft. nightclub/bar Site Manager Safety Training Scheme (SMSTS) – Reg. 1582355 · Telford Super bowl. Refurbishment. Value £750,000. CSCS Site Managers Test – Reg. 1582355 First Aid at Work – Cert. ONFK61403 1990 – 1995 PASMA – Re. 197633 ARW Building Services Fire Marshall Trained Proprietor Abrasive Wheels – 1, 24, 41 and 42 Owner and operator of general building company that was a Member of the Guild of Master Career History Craftsmen. Projects included;2011 – 2012 · St. Mary’s Church, Hampstead. Conversion of part of the vicarage into toilets andWFC Interiors kitchen area under English Heritage.Senior Site Manager · Sudbury Business Centre, Sudbury. Two phase project converting squash courts and shower rooms into office space.Site Manager responsible for management of workforce, documentation, health and safety, · Drums Inc., Hornchurch. Conversion of a butcher’s shop into a drum shop andweekly sub-contractor meetings, client meetings, maintaining build programme and budget recording studio.etc. Project was; · The University Womens Club, London. Refurbishment and decoration of main hall· David Lloyd Leisure, Hampton. Removal of existing tennis court, new outdoor pool, and drawing room under English Heritage.indoor plant room, strip-out and remove internal tennis courts, new kids area, threeactivity rooms, new food area, refurbishment of shower cubicles etc. Value £1.6m. 1990 St. Mary’s Church2006 – 2011 Clerk of WorksFileturn LtdSenior Site Manager Clerk of Works for the completion of refurbishment and remedial works. The contract was featured in English Heritages Architectural magazine. It included various small works andDuties as above on various refurbishment and fit-out contracts. Projects included; maintenance contracts across the south east and London.· Cote Brassiere, Bristol. Strip and fit-out of a restaurant, Value £770,000.· Royal Society of Medicine, London. Refurbishment of 44 bedroom/bathrooms and 1985 – 1990meeting/dining rooms. Value £1.5m. Cooper Builders Ltd· Victory Services Club, London. Strip-out and refurbishment of 75 rooms in the Site Agent/ForemanCentenary Wing. All internal walls removed to exterior shell. The Club remained“live” at all times. Value £4m. Began at Coopers as a joiner and progressed up to a Site Foreman. Projects included;· Q Hotels, the Hampton Court Hotel, London. Refurbishment of 50 bedrooms and · 26 Ferncroft Avenue, Hampstead. Refurbishment of house and stables under Englishconversion of exterior tennis court to function/guest area. The hotel remained Heritage.opened at all times. · Olympia Conference Centre, London. Conversion of the entire store area into the· Busaba Restaurant, Hoxton. Full restaurant fit-out. auditorium.· Walton Hall Hotel and Spa, Warwickshire. Refurbishment of the main house · Chelsea Mews, London. Fit-out for the Kuwaiti Royal Family.apartments to bedrooms, entrance hall, function rooms, etc. This was the last phaseof an English Heritage project. Value £6m. 1975 – 1984 Completed my apprenticeship in Carpentry and Joinery and worked for various contractors and companies. This included installing hardwood joinery and windows, maintenance and office installation (partitioning, ceiling installation etc.) at Ford Motors and general shop fitting contracts.
  4. 4. Contracts A selection of contracts with references and appraisals . All documents scanned from originals, available on request
  5. 5. David Lloyd Leisure, Hampton Position: Senior Site Manager (WFC)
  6. 6. David Lloyd Leisure, Hampton Position: Senior Site Manager 1.6 million pound protect (2011) Contract•Removal of existing tennis court and install new outdoor swimming pool ,with internal pool plant room. •Strip out and remove internal tennis courts and install new Kid’s area including toilets 3 Activityrooms with stores, new climbing frame, main area with food area.•Bar area refurbishments with new bench seating lounge and children’s area. •Refurbish both sets of shower cubicles •Refurbishment in various areas. •New land drainage and services •Night and day shifts•ALL WORKS CARRIED OUT IN A LIVE CLUB, finished on time, minimal snagging, minimal disturbance to the club.
  7. 7. David Lloyd Leisure, Hampton Position: Senior Site Manager 1.6 million pound protect (2011)
  8. 8. Fileturn Ltd. Fileturn House, 44 Reigate Hill, Reigate, Surrey, RH2 9FF Tel: 01737 242525 www.fileturn.co.uk. (2006 to 2011)Started and finished as Senior Site Manager
  9. 9. Cote (Bristol) Fileturn Ltd. Senior Site Manager£770,000 pound contract. (Click to Start)
  10. 10. The Royal Society of Medicine, Wimpole street, London,W1 Position: Senior Site Manager
  11. 11. The Royal Society of Medicine,Wimpole street, London,W1 Position: Senior Site Manager £1.5 million + pounds44 room society bedroom/bathroom refurbishment (2009).
  12. 12. The Royal Society of Medicine, Wimpole street, London,W1 Position: Senior Site Manager
  13. 13. The Curlew. Position: Senior Site Manager (Bodium, Sussex) (2010)Internal structure completely stripped to timber struts, both levels.
  14. 14. The Curlew. (Bodium Sussex) 6 Weeks contract. Note: See letter from Andrew Hart (Fileturn title page) For reference to The Curlew.
  15. 15. The Victory Services Club Position: Senior Site Manager 4 million pound room refurbishment, 75 rooms. All internal walls removed to exterior shell. Club remained ‘live’ at all time.
  16. 16. The Victory Services Club Position: Senior Site Manager
  17. 17. The Victory Services Club Position: Senior Site Manager
  18. 18. The Victory Services Club Position: Senior Site ManagerNote. Before being awarded the contract, the professional team Note. The pictures in the club magazine where taken by myself. They(including myself) had to attend an interview with Sir William McAlpine had employed a professional photographer , but asked permission to(pictured above) to assess our suitability to carry out the contract. use my bedroom shots, which was a nice boost to my ego!
  19. 19. The Hampton Court Hotel. Q Hotels Position: Senior Site Manager 50 bedroom refurbishment(2007) Hotel remained open at all times.
  20. 20. The Hampton Court Hotel. Q Hotels Position: Senior Site ManagerNote. The plaque opposite was presented to me bythe hotel manager on completion. I turned the finial tothe gazebo, as per the architects specification.
  21. 21. The Hampton Court Hotel. Q Hotels Position: Senior Site ManagerThis area used to be the club’s centre tennis court, converted into an area for functions and guests.
  22. 22. Derek Carter Contracts Manager I inserted the opposite email, as Derek’sunprompted reply to my email wishing him well in his new job, was a nice commendation.
  23. 23. Busaba (Hoxton) Position; Senior Site Manager
  24. 24. Walton Hall Hotel & Spa First contract with Fileturn Ltd. (Senior Site Manager) The last phase of the 18 month contract. I believe it was a 6 + million pound contract. Under English Heritage. My responsibility was the refurbishment of the main house (pictured) bedrooms (conversion from apartments into bedrooms), entrance Hall, Function rooms, toilets and public areas, snagging & clearing site.
  25. 25. Walton Hall Hotel & Spa
  26. 26. WFCInterior Consultant & contractors From 1995-2006 Positions: Joiner-Site Manager- Senior Site Manager
  27. 27. Oceana (Leeds)6 million pound project, restaurant and bars. Position. Senior Site Manager.
  28. 28. Oceana (Leeds)6 million pound project, restaurant and bars. Position. Senior Site Manager.
  29. 29. The One Eyed Cat Truro, Cornwall (2005/6)Position: Senior Site Manager. £700,00 pound contract. Conversion of Chapel into Bar/Restaurant. Grade 2 listed Building. Under English Heritage
  30. 30. David Lloyd Leisure, Enfield Position: Senior Site Manager
  31. 31. David Lloyd Leisure, Enfield Position: Senior Site Manager 2.5 million pound project
  32. 32. David Lloyd Leisure, (Woking). Position: Senior Site Manager (2002) 2 million + pound (TPC) contract
  33. 33. David Lloyd Leisure, (Woking). Position: Senior Site Manager (2002) 2 million + pound (TPC) contract
  34. 34. Liquid & Diva (Shrewsbury) Position: Senior Site Manager (2002)
  35. 35. Rendezvous Casino Position: Senior Site ManagerSouthend-on-Sea (2001) and Brighton (2002)
  36. 36. Rendezvous Casino Position: Senior Site ManagerSouthend-on-Sea (2001) and Brighton (2002)
  37. 37. Le Meridien Hotel Piccadilly Position: Site Manager (2005)
  38. 38. Esport’a (Stoke-on-Trent) Multi million pound project, Shell fit-out. Position. Senior Site Manager.
  39. 39. Esport’a (Stoke-on-Trent) Multi million pound project, Shell fitout. Position. Senior Site Manager.
  40. 40. TigerTiger (Birmingham) Position: Senior Site Manager 30,000. sq ft Night club
  41. 41. Summer Row (Birmingham) 1.5 million pound project, Shell fit out. Position. Senior Site Manager.Fit out over five floors, and main stair. One of my most challenging protects, I arrived on site week 1 of a 12 week program, the shell had no roof and the site crane through the building, we still finished before the shell contractor.
  42. 42. Telford Superbowl Position: Site Manager £750,000. Refurbishment
  43. 43. The Balcony Nightclub, Isle of Wight. Site Manager, Refurbishment.
  44. 44. WFC Interior Consultant & contractors From 1995-2006 Positions: Joiner-Site Manager- Senior Site ManagerMartin Scragg (Architect)
  45. 45. WFC Contracts from 1995 to 2000
  46. 46. The University Women’s Club As featured on TV A Miss Maples, story was filmed at the Club Point of interest. The site was open, at the club one Saturday morning, when the duty manager requested if work could cease, and someone would like to see me in the adjoining property, As I was let in to the property, I was greeted by Bob Hoskins, he was recording the sound track for Roger Rabbit. and would I mind stop noisy works while he finished recording.
  47. 47. Cooper Builders Ltd Hudson Road, Albany Road, Leigh-on-sea, Essex 1985-1990 Positions: Joiner-Foreman-Site Manager
  48. 48. 26 Ferncroft Ave (Luxury apartments) Hampstead, London. Position: Site Manager (Cooper Builders Ltd)9 months contract of a refurbishments of house and stables (ex Chinese embassy) .Under English Heritage.
  49. 49. 26 Ferncroft Ave (Luxury apartments) Hampstead, London.Position: Site Manager (Cooper Builders Ltd)
  50. 50. 26 Ferncroft Ave (Luxury apartments) Hampstead, London.Position: Site Manager (1989) (Cooper Builders Ltd)
  51. 51. St Marys Church Hampstead Position: Clerk of the works. (1991) 1 million pound + contract, new roof and refurbishment. Under English Heritage.
  52. 52. St Marys Church Hampstead Position: Clerk of the works. 1 million pound contract, new roof and refurbishment. Under English Heratige.
  53. 53. Olympia Conference Centre Position: Site Manager (1987)Conversion from the entire top level store area into the now auditorium.
  54. 54. Chelsea Mews For aMember of the Kuwait Royal family Position: Site Manager (1988/89)
  55. 55. Coomb Hill Estate (Kingston) Position: Site Manager (Cooper Builders Ltd)(1989)New house from foundation to completion.
  56. 56. Hammersmith & Fulham Council. Included three main contracts. • A conversion from an industrial laboratory to a Coroners Court. •A quadrant shape extension to a Nursery School.•New reception area to Hammersmith Collage.
  57. 57. Health & Safety Multimedia induction. Multimedia induction. •Having taken an early interest in H&S I started on a multimedia Induction in 2000, and have improved it over the years. •The Induction can be updated and customised for individual projects. •There are several videos incorporated and downloaded from the HSE. •Music and videos have been included for easy digestion. •An average Induction normally takes approximately 25 minutes. Copy on request.
  58. 58. Certificates
  59. 59. Certificates
  60. 60. Certificates
  61. 61. Certificates
  62. 62. Contact Details  Mr Alan Watson  watsonalan3@aol.com  Mobile. 0788 75 74 765  Landline. 01603 811 696

×