Your SlideShare is downloading. ×
0
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

San Vicente Dam Raise Update - May 2013

251

Published on

Update on the San Vicente Dam Raise project provided at the San Diego County Water Authority Engineering & Operations Committee Board Meeting - May 2013

Update on the San Vicente Dam Raise project provided at the San Diego County Water Authority Engineering & Operations Committee Board Meeting - May 2013

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
251
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
10
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Engineering &Operations Committee MeetingMay 23, 2013Jerry Reed
  • 2. Raised Dam2
  • 3. Spillway3
  • 4. 4Downstream Step Repair
  • 5. Upstream Liner Installation5
  • 6. Low Level Outlet Gate StructureLow Level Outlet PipeExisting DamCofferdamBedrockTarget  EL 594EL 625Future RCC DamActive ReservoirFlood Buffer6
  • 7. Low Level Outlet Gate Structure7
  • 8. Outlet Tower8
  • 9. 9Outlet Tower Gates
  • 10. 10Fish Screen
  • 11. 11Lower Level Outlet108-inch Diameter PipeCity 66-inchDiameter PipeEmergencyDischargeOutlet WorksWater Authority90-inchDiameter Pipe
  • 12. Plunger and Gate Valve Installation12
  • 13. Picture of BFV flying in from Crane,update on Monday13108-inch Diameter Butterfly ValveInstallation
  • 14. 108-inch Diameter Butterfly Valve14
  • 15. Contractor’s Baseline ScheduleStart-up TestingDecommission Exist OW108” Valve Actuator DelaySchedule UpdateNOVEMBER2013FINISH15(Construction Contract Duration)Complete Outlet Works7 MonthsCommence Reservoir FillCONTRACTORS BASELINE SCHEDULERESERVOIRFILLTOEL.640FALL2014-2017
  • 16. Award Package 5 Marina Construction -Summer of 2013Complete Filling to Height of Existing DamAward Package 4 Bypass Pipeline Construction -Summer of 2014Begin Filling to Full Height of Raised DamUpcoming Activities16

×