Life Technologies: Carlsbad Site Water Conservation Project 2009 - Life Technologies

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    Life Technologies: Carlsbad Site Water Conservation Project 2009 - Life Technologies - Presentation Transcript

    1. Life Technologies – Carlsbad Site Water Conservation Project 2009 Greg Waterbury Environmental Sustainability Manager June 2, 2009
    2. Life Technologies – Carlsbad Site Water Audit Water Usage and Savings Estimates Water Audit Water Usage and SavingsSavings Estimates Water Audit Water Usage and Estimates Auditors: Kennedy & Jenks Approximate Water Use Process Water Use/ Area gal/yr acre-ft/yr Estimated water savings/yr Autoclaves (3 units) 4,492,800 13.79 3,594,280 RO/DI Room 2,038,516 6.26 784,045 Cooling Towers 6,165,326 18.92 531,137* Clean Steam Generators 2,365,200 7.26 1,892,160 Total Estimated Savings 15,061,842 46.22 6,801,622 *Central plant Energy Conservation Measures project improvements - estimated water savings likely to be higher: • 2.0 MM gallons Cooling Tower • 1.5 MM gallons Central plant and VAV • 3.5 MM gallons Total 2
    3. Water Conservation Projects Phase 1 - Autoclave water conservation: kit/trap cooling modification. Limits the amount of water used for trap cooling to as use basis as opposed to continual flow. Trap cooling water Baseline monitoring - RO/DI purified water system piping reconfiguration to increase efficiency of RO system RO pump - water rejection RO/DI water system train (1 of 2) 3
    4. Water Conservation Projects Phase 2 - Central Plant Energy Conservation Measures $1MM central plant capital project estimated water savings = 3.5MM gallons annually estimated electrical savings = 3.2MM kWh annually estimated cost savings = $482,000 annually (ROI 1.9 yr) Phase 3 - Irrigation capital project proposal - swap out nozzles and controller Estimated Savings for Total Site Conversion (Pleasanton) Approximate turf area irrigated with spray heads on Site = 82,000 Square Feet Gallons of water saved from conversion = 1,730,385 gallons per year Estimated Savings for Conversion of the Site = $5,781.00 4

    + San Diego County Water AuthoritySan Diego County Water Authority, 4 months ago

    custom

    369 views, 0 favs, 0 embeds more stats

    Life Technologies: Carlsbad Site Water Conservation more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 369
      • 369 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 1
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories