Discover the discovery
Upcoming SlideShare
Loading in...5
×
 

Discover the discovery

on

  • 462 views

 

Statistics

Views

Total Views
462
Views on SlideShare
462
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Discover the discovery Discover the discovery Presentation Transcript

  • S H U TTL E P R O C E S S IN G ( B e f o r e F lig h t A c t iv it ie sR a r e ly S e e n B y Th e D G S n e rO lV E b l i c - - - I e C a Pu R ) D IS C O V E R Y
  • External Tank Arrives by Barge from MS
  • External TankVertical Assembly Building
  • RemovingExternal TankFrom Carrier
  • External Tank Enters VAB
  • External Tank in VAB
  • Preparing to Lift the Tank to Vertical
  • Lifting Tank
  • Solid RocketsAre Attached
  • Engines AreAttached To Solids
  • Engines Are Attached To The Shuttle In The Shuttle Processing Facility
  • Shuttle In Sling Ready For Lift In VAB
  • Shuttle Has BeenMoved To VAB AndAnd Will Be Attached To External Tank
  • Shuttle is Attached
  • PayloadPreparation Room (PPR)
  • Cargo Package For ISS
  • New Module For ISS
  • Payload Ready ToBe Moved to The Launch Pad
  • Payload Carrier Leaves PPR
  • Payload Being Moved To Launch Pad
  • Lifting PayloadInto Position For Insertion IntoDiscovery When It Arrives At The Pad
  • Shuttle Discovery Leaves VAB
  • Shuttle & Crawler TRIP: Length--- 3 ½ mi Time--- 6-8 hours Launch Pad
  • Crawler Control
  • DISCOVERYARRIVES AT PAD
  • READY FOR LAUNCH
  • We Have Lift Off