Your SlideShare is downloading. ×
0
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Recent Work Samples of Peng Wang

574

Published on

Work samples from Portman and HOK

Work samples from Portman and HOK

Published in: Design, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
574
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Work Samples - Peng Wang
  • 2. Zayed Center, Lahore High-rise Mixed- -use Complex Company: HOK Group, DC Office Role: Designer Supervisor: Duncan Lyons, Design Principal
  • 3. Bird’s Eye View Rendering
  • 4. Area Summary • Total: 4,802,800 SF. • Office: 1,368,000 SF. • Hotel: 530,000 SF. • Apartments: 2,170,400 SF. • Retail: 696,200SF. • Cineplex: 38,200 SF. • Car Parking: 2,800 Cars
  • 5. Harbour Station, Woodbridge, VA High-rise Service Apartment Complex rise Company: HOK Group, DC Office Role: Designer Supervisor: Duncan Lyons, Design Principal
  • 6. Shanghai Jin Hongqiao Center High-rise Office + Low rise Low-rise Retail Company: John Portman & Associates Role: Design Architect Supervisor: Kinka Wong, Project Director
  • 7. Bird’s Eye View Rendering
  • 8. Design Concept – City Gate Shanghai Gate, Bird’s Eye View Rendering
  • 9. Ground Floor Plan & North Elevation
  • 10. Typical Low-RiseTower Plan & South Elevation RiseTower
  • 11. Hilton Bayfront Hotel & Convention Center San Diego, CA High-rise Hotel + Convention Center rise Company: John Portman & Associates Role: Design Architect Supervisor: Kinka Wong, Project Director
  • 12. Bird’s Eye View Rendering
  • 13. Project Data l Hilton Bayfront Hotel l 1190 room convention center hotel l 92,900 sq. meters l Two Large ballrooms (3160 sq. meters and 2230 sq. meters) l 15,330 sq. meters total meeting space l Three restaurants
  • 14. Design Experience •The site was prone to eartquakes, requiring •The site had been a ship building yard special structure throughout the building previously, so there was a necessity to remediate the soil •Our assignment during this project was to work with the developer to design and address voluminous project conditions. •The site location adjacent to the bay had salt- laden air, complicating details which had metal exposed to the air
  • 15. Ground Floor Plan, Views of Spa & Bar
  • 16. Vertical Transportation • From early design development to substantial completion took 3.5 years. • Vertical transportation including elevator core/lobby and escalator lobby were part of my responsibility from design concept through construction document phase.
  • 17. Guestrooms • From early design development to substantial completion took 3.5 years. • Trying to get more guestrooms to enjoy the bay view.

×