Week report

  1. 1. East Delta WTP WTP Water Hammer - Damage Sphere Checking the water hammer vessel water rise andnot go down so that mean sphere damaged and to Checked page 1/12
  2. 2. East Delta WTP WTP Water Hammer - Damage Sphere Sphere Welding Carck and fll with water page 2/12
  3. 3. East Delta WTP WTP Water Hammer - Damage Sphere Sphere Welding Carck and fll with water page 3/12
  4. 4. East Delta WTP Spare Parts No new for Spare parts page 4/12
  5. 5. East Delta WTP Flash Mixer Dry Run damage Dry Run damage because of twisted a round the mixer page 5/12
  6. 6. East Delta WTP Flash Mixer Dry Run damage They assembly the switch but not connected yet page 6/12
  7. 7. East Delta WTP Filter 03,04 Refill with New Filter Media The empty 03 and refill 04 page 7/12
  8. 8. East Delta WTP Filter 03,04 Refill with New Filter Media The empty 03 and refill 04 page 8/12
  9. 9. East Delta WTP Chlorine Sherkia CO take Drum valve to mainten , till now not installed page 9/12
  10. 10. East Delta WTP Thickener Thickener empty or full and pipe blocked and pumps stopped page 10/12
  11. 11. Regular Check No Unit Activates Intake 1- Checking Raw Water Pump pressure,temprature,power and gland packing leakage. 1 2- Checking water hammer system working or not. 2 Distribution Shift Checking flow, pressure, chlorine dosing and float fix or not. Chlarifier Checking sludge pumping units, cleaning and greasing of knife,air pressure, bridge and mixers. 3 4 Thickener Checking pump pressure, pipeline blocking and thickener level. Filters 1- Checking backwash , backwash waste ,boosters and dewatering. 5 2- Air system ,compressors,dryer,pressure,…,etc. 3- Checking filters flow , levels , backwash tank level. 6 Under Ground Reservoir Checking rediusal chlorine smaple plan and tanks levels Treated Water Pump 1- Checking pump priming system. Station 2- Checking Treated Water Pump pressure,temprature,power and mechanical seal leakage. 7 3- Checking water hammer system working or not. 4- Checking measurement devices. Chlorine 1- Checking drums, vacuum units , changeover unit and piping. 8 2- Checking dosing cabient, dosing , feeding pressure. 3- checking Caustic Soda Pump. Chemical 1- Checking dosing pumps, strianers, pressure , flow and piping. 9 2- Checking Tanks levels and cleaning. 10 Evaporation ponds 1- Checking air pressure , cleaning and greasing of knife. Activites and Remarks for week No Unit Remaks 1 Intake 2 Distribution Shaft 3 Clarifier 1- Fixing of the flash mixer dry run was bad and cause damage to it. 3 Thickener 1- Thickener empty or full and piping blocked and pumps stopped 4 Filters 1- Filter 03,04 Refill with New Filter Media 2- Backwash pumps was stopped because someone played by button. 3- Backwash pump 42 coupling extension handed over to AC till install new H-Shape rubber 5 Chlorine 1- Sherkia CO take Drum valve to mainten , till now not installed 2- General cleaning of drum store 7 Chemical 1- Plastic fall in tanks during filling. Central dewatering 8 Station 9 Evaporation ponds 1-opened valve closed and operation shloud from panel. 10 Under Ground Reservoir Rediusal Chlorine sample pump not working. Treated Water Pump Water hammer maintenance 11 Station
  12. 12. 12 Insturctions .lenieregyp

×