SHUTTLE PROCESSING (Before Flight Activities RarelySeen       By The General Public)DISCOVER --- DISCOVERY
External Tank Arrives by Barge from MS
External TankVertical Assembly Building
RemovingExternal TankFrom Carrier
External Tank Enters VAB
External Tank in VAB
Preparing to Lift the Tank to Vertical
Lifting Tank
Solid RocketsAre Attached
Engines AreAttached To  Solids
Engines Are Attached To The Shuttle In The Shuttle Processing Facility
Shuttle In Sling Ready For Lift In VAB
Shuttle Has BeenMoved To VAB AndAnd Will Be Attached  To External Tank
Shuttle is Attached
PayloadPreparation Room     (PPR)
Cargo Package For ISS
New Module For ISS
Payload Ready ToBe Moved to The  Launch Pad
Payload Carrier Leaves PPR
Payload Being Moved To Launch Pad
Lifting PayloadInto Position For   Insertion IntoDiscovery When It Arrives At The         Pad
Shuttle Discovery Leaves VAB
Shuttle & Crawler                    TRIP:                    Length--- 3 ½ mi                    Time--- 6-8 hours   Laun...
Crawler Control
DISCOVERY ARRIVES  AT PAD
READY FOR LAUNCH
We Have Lift Off
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Nasa
Upcoming SlideShare
Loading in...5
×

Nasa

281

Published on

Vipul.R.SOlanki___Bharja

Published in: Technology, Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
281
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Nasa

  1. 1. SHUTTLE PROCESSING (Before Flight Activities RarelySeen By The General Public)DISCOVER --- DISCOVERY
  2. 2. External Tank Arrives by Barge from MS
  3. 3. External TankVertical Assembly Building
  4. 4. RemovingExternal TankFrom Carrier
  5. 5. External Tank Enters VAB
  6. 6. External Tank in VAB
  7. 7. Preparing to Lift the Tank to Vertical
  8. 8. Lifting Tank
  9. 9. Solid RocketsAre Attached
  10. 10. Engines AreAttached To Solids
  11. 11. Engines Are Attached To The Shuttle In The Shuttle Processing Facility
  12. 12. Shuttle In Sling Ready For Lift In VAB
  13. 13. Shuttle Has BeenMoved To VAB AndAnd Will Be Attached To External Tank
  14. 14. Shuttle is Attached
  15. 15. PayloadPreparation Room (PPR)
  16. 16. Cargo Package For ISS
  17. 17. New Module For ISS
  18. 18. Payload Ready ToBe Moved to The Launch Pad
  19. 19. Payload Carrier Leaves PPR
  20. 20. Payload Being Moved To Launch Pad
  21. 21. Lifting PayloadInto Position For Insertion IntoDiscovery When It Arrives At The Pad
  22. 22. Shuttle Discovery Leaves VAB
  23. 23. Shuttle & Crawler TRIP: Length--- 3 ½ mi Time--- 6-8 hours Launch Pad
  24. 24. Crawler Control
  25. 25. DISCOVERY ARRIVES AT PAD
  26. 26. READY FOR LAUNCH
  27. 27. We Have Lift Off
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×