See how OWS helped a customer save over a million US Dollars by leveraging its innovative model of SEZ based warehousing. The customer wanted to lease out their rig after completion of job in one......

See how OWS helped a customer save over a million US Dollars by leveraging its innovative model of SEZ based warehousing. The customer wanted to lease out their rig after completion of job in one concession block to another. However, instead of their traditional methodology of exporting the rig to Jebel Ali, OWS handled the export and re-import from its Vizag SEZ based facility. This not only gave a direct cost saving of over a million USD in mobilization-demobilization costs, it also drastically reduced the downtime of the rig due to in-transit idle time. The client was thus able to start earning from the rig faster than originally planned.

More in: Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
483
On Slideshare
482
From Embeds
1
Number of Embeds
1

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 1

http://www.linkedin.com 1

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. This information is confidential and was prepared by OWSWAFA STAR 6 Rig Movement by OWS15th October – 23rd December, 2011Email:info@ows.net.inWebsite: www.ows.net.inOffice phone: +91 22 67698932
  • 2. This information is confidential and was prepared by OWS 2OWS - India Rig Movement_ 1Apr 2012_v1Project OverviewClient: ETA Star, UAERig Name: WAFA STAR 6OWS Scope of work:• Safe movement of the rig & related accessories• Loading, unloading & transshipment• Customs clearance for exporting rig to Vizag SEZ• Canceling old EC after exporting the rig to Vizag SEZ• New EC application to import rig for new block• Customs clearance for importing rig for HDCPL blockProject Timeline (target): 28 daysProject Timeline (achieved): 58 days**Force Majeure invoked due to loading site being hit bycyclone; site closed down for 22 days
  • 3. This information is confidential and was prepared by OWS 3OWS - India Rig Movement_ 1Apr 2012_v1Timeline of the Rig MoveLoad point : TTPFinal destination : MulankaIntermediary stop: Vizag SEZTotal Vehicles : 281 Nos.1st Vehicle from TTP: 15th Oct 2011Vehicle Reported at SEZ: 17th Oct 2011Last Vehicle from TTP: 12th Dec 2011Last Vehicle from SEZ: 23rd Dec 2011
  • 4. This information is confidential and was prepared by OWS 4OWS - India Rig Movement_ 1Apr 2012_v1Consolidated Route Information – clarification neededSource and destination DistanceTTP to Vishakhapatnam 1125 kmTTP to Chennai 340 kmVishakhapatnam to Mulanka (Rig Site) 420 kmTTP to Mulanka 875 kmAdditional route information• Majority of the route from TTP to Mulanka via Vizag is either astate or national highway• 60 km before rig site the road is a single, narrow and unevencountry road• Low lying over-head electric cables in the area required accurateroute survey and planning• ODC cargo moved in intervals to avoid traffic jam• OWS executive deployed to ensure smooth flow of traffic• Minor issues with local village community mutually resolved byOWS with the help of ETA
  • 5. This information is confidential and was prepared by OWS 5OWS - India Rig Movement_ 1Apr 2012_v1Highlights of the rig movementHeaviest Weight Handled : 50MTLongest Vehicle : 60 FtLongest Consignment : 55 FtTotal Vehicles placement : 281 Nos.Best Daily Dispatch achieved: 27 trailers loaded, customscleared and dispatched in asingle day including all ODCBunk houses
  • 6. This information is confidential and was prepared by OWS 6OWS - India Rig Movement_ 1Apr 2012_v1The project involved movement of ODC & heavy lift cargoTotal Tonnage Handled335 Metric Ton• 30 ODC bunk houses• Generators• ODC general storage tanks• Water/diesel tanks• Baskets & frames• Drill collars• Hooks• Giant wire rope reels• Miscellaneous items related to RIG operations
  • 7. This information is confidential and was prepared by OWS 7OWS - India Rig Movement_ 1Apr 2012_v1Force Majeure invoked due to cyclonePictures of loading site after cycloneCoping with adversity – an OWS SolutionGravel, crushers and rollers were brought to site to stabilize parts of the muddy loading site sothat heavy lift equipment could be used even while most of the site was still water logged. Thishelped save an estimated 5-7 days of additional down time after the cyclone
  • 8. This information is confidential and was prepared by OWS 8OWS - India Rig Movement_ 1Apr 2012_v1Pictures of some major & other consignments
  • 9. This information is confidential and was prepared by OWS 9OWS - India Rig Movement_ 1Apr 2012_v1Material Handling at TTP, Vizag SEZ and MulankaTTP50 T Hydraulic Crane : 2OWS Executives : 4Supervisor : Mr. Pankaj Surani, DirectorVizag SEZ50 T Hydraulic Crane : 114 T Hydra Crane : 2OWS Executives : 3Supervisor : Capt. Mahapatra, Director Ops.Mulanka50 T Crane : 1100 T Crane : 1OWS Executives : 2Supervisor : Mr. Harjit Sigh, Warehouse Mgr.
  • 10. This information is confidential and was prepared by OWS 10OWS - India Rig Movement_ 1Apr 2012_v1Storage Space at Vizag SEZ• 42,000 sq. ft. concretized area provided by OWS for storage in Vizag SEZ• Lead time of 48 hours for dispatch of material post receipt of new EC
  • 11. This information is confidential and was prepared by OWS 11OWS - India Rig Movement_ 1Apr 2012_v1• Incident free completion of the project• Complete compliance with all regulatory requirements (Customs, DGH, etc.)• OWS adapted to extreme weather conditions to ensure speedy execution• Overall successful project execution due to following steps taken by OWS:-Complete understanding of the client’s requirements-Proposed most economical alternative to ensure compliance with all laws of the land-Extensive route survey undertaken to plan movement of ODC cargo-OWS personnel deployed at loading & off-loading site to help cross-site coordination• Total savings achieved by ETA Star versus NBA*: USD 1.2 million*Next Best Alternative (NBA) estimated by OWS on inputs from ETA StarSummary
  • 12. This information is confidential and was prepared by OWS 12OWS - India Rig Movement_ 1Apr 2012_v1Thank you!CONTACT INFORMATIONEmail: info@ows.net.inWebsite: www.ows.net.inOffice phone: +91 22 67698932