Your SlideShare is downloading. ×
Format of the project
Format of the project
Format of the project
Format of the project
Format of the project
Format of the project
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Format of the project

255

Published on

c zxfeasd

c zxfeasd

Published in: Art & Photos
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
255
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Format of the Project : A Project Report On “……….Project Title……..” At Name of the Company Submitted by Name of the student Roll No. In partial fulfillment ofBachelor of Business Administration For the year 2011-2012 submitted to University of PuneISB&M College of Commerce Nande Village, Mulshi
  • 2. General Instructions:1] Typed copies in “ Black “ colour2] Font size should be 12, Times New Roman3] One and half line spacing4] a sub heading at the bottom of a page must have atleast two full lines below it or else it should be carried over to the next page.5] Last word of any line or page should not be split using Hyphen.6] page borders should not be used. Chronology of the project report:1] Title Page : Name of the topic Name of the company Course name Student name
  • 3. Roll No. UoP Name of the institute Academic Year2] Bonafide certificate [ signed by the internal guide and director [ double spacing].3] Copy of the letter submitted by the institute to the Company.4] Company Certificate5] Students acknowledgement[ Thanks giving toCompany, director, guide, staff]6] Executive Summary7] list of tables8] list of figures9] list of symbols10] Index- chapters
  • 4. Index [ with page nos]Chp 1 - Introduction Topic Organisation Objective of project studyChp 2 - Concepts related to studyChp 3 - Organisation : History Growth Organisational StructureChp 4 - Research Methodology Sample design Sources of collection of data Methods and techniques LimitationsChp 5 - Analysis and Interpretation of DataChp 6 - [A] Observation and Findings [B] Conclusion and Suggestions
  • 5. Appendices – QuestionnaireBibliographyReferences :1]2]3]4]5] Notice1] Every student should make a separate project report.The coping of the other’s projects is not allowed.2] Whenever required you may take the guidance from Internal guide.3] Last date for submission of rough final report is 15/02/2012
  • 6. 4] Last date for submission of final bound report is 20/02/20125] Internal marks would not be forwarded to the University of Pune, unless project reports are submitted in specified time.6] Late submissions will be marked “ absent”.7] Two bound report copies to be submitted on or before 28/02/2012 Vaidehi ISB&M

×