• Like
Shints & Factory Profile April 2012
Upcoming SlideShare
Loading in...5
×

Shints & Factory Profile April 2012

  • 586 views
Uploaded on

Shin Textilie Soultions\'s Own Factory - Gore Licensed Factory with 4,000 workers

Shin Textilie Soultions\'s Own Factory - Gore Licensed Factory with 4,000 workers

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
586
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Shin Textile Solutions & Factory Profile
  • 2. TABLE OF CONTENTS 2• COMPANY INFORMATION• MAIN FACTORY INFORMATION• FACTORY CAPABILITIES• QUALITY CONTROL PROCESS• MAIN CUSTOMERS WORLDWIDE• CONTACT INFORMATION
  • 3. SHIN TEXTILE SOLUTIONS CO., LTD. 3Company NameHQ : Shin Textile Solutions Co.,Ltd. Since April 2004USA Branch : Shin Textile Solutions, America Inc. since Feb. 2012AddressHQ : 801,E&C Venture Dream Tower II Bldg,197-10, Guro 3 Dong, Guro-Gu,Seoul, KoreaUSA Branch : Fort Lee, NJWebsite Telephone Faxwww.shints.com 82-2-6330-2000 82-2-6330-2019Contact InformationName K.S.Shin Tel. 82-70-4006 -3701 Title CEO & President Email shin@shints.com Victoria Shin 1-404-642-8666 Sales Manager of USA victoriashin@shints.comStaff of HQ : 45 employeesSales, Logistic, Material sourcing, Accounting, Developing Samples
  • 4. SHINTS BVT CO., LTD. 4Factory NameSHINTS BVT CO.,LTDAddressThach Khoi commune, Hai Duong City, Hai Duong Province, VietNam(60km far from Hanoi, Vietnam)Contact InformationName Michael Lee Tel. ++ 84 320 861 729 Title General Manager Email michael@shintsbvt.comGore licensed factory for Outdoor, Bike, Motorcycle and SnowmobileGarmentsSpecialized in making 100% waterproof seam-sealed and welded technicalgarments for Outdoor, Motor Cycle, Bicycle, Snow Sports, TechnicalUnderwear, Running wear with flat needle machine.CapabilityTotal area of the factory - 37,000m2Shop floor area - 16,000m2Workers – 4,000Production Line - 50Production Capability - 1,500,000 pieces/year
  • 5. 5 Factory Capability Special EquipmentProfessional Development Team
  • 6. FACTORY CAPABILITY 6 Total area of the factory - 37,000m2 Shop floor area - 16,000m2 Workers – 4,000 Production Line - 50 Production capability - 1,500,000 pieces/year
  • 7. MAIN PRODUCTS CAPABILITY PER MONTH 7 Seam Sealed Garments Softshell & - Motorcycle 20,000 pcs Wind Stopper - Outdoor 100,000 pcs 200,000 pcs - Gore 50,000 pcs Sports Outerwear Accessory - 100,000pcs Balaclava, Masks 100,000 pcs Technical Underwear & Bike Pants 100,000pcs
  • 8. SPECIAL EQUIPMENT - LASER CUTTING 8
  • 9. SPECIAL EQUIPMENT – WELDING & PRESS 9Welding Press Machine for Transfer Print
  • 10. SPECIAL EQUIPMENT – SEAM SEALING 10 Seam Sealing Seam Sealing for Gore
  • 11. SPECIAL EQUIPMENT – TPR MACHINE 11
  • 12. SPECIAL EQUIPMENT – SILK PRINTING 12
  • 13. SPECIAL EQUIPMENT – EMBROIDERY 13
  • 14. SPECIAL EQUIPMENT – 4-NEEDLE SEWING 14
  • 15. MD DEPARTMENT – 34 MDs 15
  • 16. CAD DEPARTMENT – 59 STAFF 16
  • 17. SAMPLE DEPARTMENT 17 Developing House in Seoul Office  Making all proto samples  Making basic patterns with Lectra CAD system  3 sewing workers and 3 pattern makers Sample House in Main Factory  Making developing samples and sales and approval samples  Lectra CAD system  150 sewing workers and 40 pattern makers
  • 18. QUALITY CONTROL PROCESS 181 2 3First Material Inspection Second Material Inspection Cutting part Inspection beforeWarehouse in Seoul in factory sewing Check each piece of cuttingCheck quality of materials Check quality of materialsbefore shipping to factory parts of outshell (color) before before production sewing 5 4 Seam taping inspection for Middle inspection during taped garments sewing process Random checking for water- Check all working instructions tightness of taped seams and taping conditons before before closing out and inside closing outshell and lining. 7 6 Final inspection for finished Pre-final inspection for finished garments before packing garments Piece by Piece inspection for Check all descriptions before every garment before packing trimming garments. 8Random packing Inspection after finishing packing
  • 19. CUSTOMERS WORLDWIDE 19 Europe / Outdoor Apparel  USA  Trangoworld – Spain  TUMI –Outerwear  Jack Wolfskin – Germany  FOX – Motor Cycle Apparel  Schoffel – Germany  Salewa – Italy  Canada  La Sportiva - Italy • Bombardier – Motor Cycle/Snow Europe / Motor Cycle Apparel  Korea  Alpinestar – Italy • Berghous – Outdoor  Dainese – Italy • BlackYak – Outdoor  KTM – Austria / Germany • New Balance - Outdoor
  • 20. Contact Us 20Main Office in Seoul, KoreaKeumSik Shin - CEOEmail : shin@shints.comTel : 82-2-6330-2000 / 82-70-4006-3701New York OfficeVictoria Shin - Sales ManagerEmail : victoriashin@shints.comTel : 404-642-8666 T nk you! ha