Parquedoisirmaos

157 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
157
On SlideShare
0
From Embeds
0
Number of Embeds
11
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Parquedoisirmaos

  1. 1. •TRIPLICAÇÃO DA ÁREA DO PARQUE DOIS IRMÃOS 387 + 774 = 1.161
  2. 2. QUADRO FINANCEIRO DA COMPENSAÇÃO AMBIENTAL - CPRHTermo deCompromisso TCNºEmpreendimento / Empreendedor Valor DISPONÍVEL em conta corrente - (R$)011/2004 Termoelétrica da Termopernambuco / TERMOPE S/A 379.979,40066/2005 Estaleiro Atlântico Sul / EAS 39.513,94081/2005 Bravel 5.935,18001/2006 S/A PAulista 33.206,44002/2006 MGBRBA 356.625,48050/2007 PetroquímicaSuape 5.299.691,84007/2013 FIAT 5.603.571,00012/2013 RNEST - Refinaria 138.174.339,33014/2013 CTR Petrolina 8.962,33TOTAL DISPONÍVEL 149.901.824,94Termo de Compromisso TC nº Empreendimento / Empreendedor Valor da CA A RECEBER (R$)066/2005 Estaleiro Atlântico Sul / EAS 4.538.564,43067/2008 PE 051 - SETUR 251.000,0001/2013 Barragem Morojozinho - COMPESA 110.805,8802/2013 ETE Paiva - COMPESA 224.637,5905/2013 Barragem Engenho Maranhão - COMPESA 813.630,8606/2013 Barragem Engenho Pereira - COMPESA 742.452,3407/2013 FIAT 14.444.444,5413/2013 Estaleiro Promar 1.051.955,2014/2013 CTR Petrolina 26.886,9816/2013 Barragem Igarapeba - SRHE 2.526.852,6417/2013 Barragem Barra de Guabiraba - SRHE 1.140.154,4822/13 TERMOPE 3.080.050,48TOTAL A RECEBER – JÁ FORMALIZADO 28.951.435,42
  3. 3. COMPENSAÇÃO AMBIENTAL DA CPRH – TERMOS EM ANDAMENTOEmpreendimento / Empreendedor Valor da CA (R$)Via Mangue – 2ª Etapa 1.677.135,05Rodovia de Contorno do Cabo (Via Expressa) 1.122.671,33Estaleiro CMO 1.664.600,00Barragem Gatos 203.888,33Barragem Panelas II 800.849,72Barragem Serro Azul 6.071.622,80Barragem Brejão 943.579,54Sistema Adutor do Agreste 7.739.500,74Ramal do Agreste 6.130.327,46TOTAL 26.354.174,97TOTAL GERAL = R$ 205.207.435,33

×