CORE final workshop introduction
Upcoming SlideShare
Loading in...5
×
 

CORE final workshop introduction

on

  • 1,147 views

Introduction to CORE ESSnet (research network) final workshop

Introduction to CORE ESSnet (research network) final workshop
Luxembourg - Eurostat - 11 January 2012
http://www.essnet-portal.eu/core-0

Statistics

Views

Total Views
1,147
Views on SlideShare
674
Embed Views
473

Actions

Likes
0
Downloads
3
Comments
0

2 Embeds 473

http://vaccaricarlo.wordpress.com 472
http://webcache.googleusercontent.com 1

Accessibility

Categories

Upload Details

Uploaded via as OpenOffice

Usage Rights

CC Attribution-NonCommercial-ShareAlike LicenseCC Attribution-NonCommercial-ShareAlike LicenseCC Attribution-NonCommercial-ShareAlike License

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    CORE final workshop introduction CORE final workshop introduction Presentation Transcript

      • CORE ESSnet
        (COmmon Reference Environment) final meeting
        Carlo Vaccari Istat / University of Camerino
      • Italy
      • Outline
      • CORE project:
        • introduction: CORA, partners, meetings
        • WorkPackages (WPs) list
        • WPs main results
      • Meeting Agenda
      • Future?
      • CORA project
        A for Architecture -> E for Environment CORA ESSnet (3Q2009-4Q2010) results :
      • Survey on existing software -> SAB inventory
      • Architecture:
        • Two dimensions
        • Layered
        • Platform independent
        • GSBPM compliant
      • Prototypes
      • CORE workpackages
      • WP1: Project management
      • WP2: Design of the information model
      • WP3: Generic interface design for interconnecting sub-processes
      • WP4: Workflow solutions for process management
      • WP5: G eneric interface and scenario for .NET
      • WP6: G eneric interface and scenario for Java
      • WP7: Project dissemination and integration cost reporting
      • Partners and meetings
      Countries: it (coord.), fr , nl , no , pt , se Third parties (Universities): Athens , Camerino Meetings held:
      • Kick-off - Luxembourg 17-18 January 2011
      • Lisbon meeting – 28-29 March 2011
      • Paris meeting – 20-21 June 2011
      • Rome meeting - 3-4 October 2011
      • Final meeting in Luxembourg - 11-12 January 2012 workshop to present CORE results to Eurostat
      • Workpackages dependencies
      • CORE WP2
      Information model (del 2.2) for the statistical process, designed in accordance with these principles:
      • CORA requirements
      • Rectangular data sets : rows and columns
      • Strong typing : each column one value type only and so a data set is (strongly) typed - also rules and parameters are typed
      • Data set Kinds : constrain the data sets that can be transferred (micro data, dimensional, classifications, ...)
      • Business objects: usage of XML to support modeling business objects outside CORE, such as the GSIM
      • CORE WP3
      WP3 Architecture - technical definition of unique environment for:
      • Designing
        • Statistical processes in terms of abstract services
        • Exchanged data and metadata
      • Running
        • Designed processes by invoking wrapped tools
      • CORE WP3
      CORE Data:
      • Domain descriptor: meta-model with entities and entity properties ( open to DB | RDF | GSIM integration)
      • CORE data model (according to the information model) : Rectangular data set, Data set kind ...
      • Mapping model: mapping CORE data to Domain Descriptor
      Integration API : making a tool a CORE service, i.e. translating inputs and outputs of the tool in a completely transparent and automatic way
      • CORE WP4
      Most important result: workflow tools evaluation Requirements list based on CORE and NSIs needs
      • Comparison based on four different axes:
        • Modeling : g raphical interface, m odel translation
        • Integration : c ommunication technology, standards , u ser management, v ersioning ...
        • Execution : m onitoring, t raceability
        • General : u sability, m anual/automatic steps ...
      • CORE WP5 and WP6
      • These WPs provide working solutions that permits the automatic execution of selected GSBPM sub-processes starting from WP3 results
      • WP5 provides an implementation in .NET while WP6 provides an implementation in Java
      • In the afternoon DEMO for two environments
      • CORE WP7: dissemination
        Web site , project wiki and many presentations in 2011:
      • NTTS Brussels 22-24 February: Istat
      • MSIS Luxembourg 23 – 25 May: Istat & Camerino
      • MeTTeg Camerino Italy 30 June – 1 July: Camerino
      • SISAI Luxembourg 7 – 8 June: Istat
      • Meeting organized by Senior Statistician of the Statistical Service of Greece, Crete July: UoA
      • Working group for "Technology innovation" by the General Secretariat of Research&Technology, Greece, September: UoA
      • METIS workshop Geneva 5 – 7 October: CBS & SSB
      • ITDG Luxembourg 18 – 19 October: Istat
      • ESSnet workshop Cologne, Germany 27 – 28 October: SSB
      • HLG-BAS workshop Geneva 31 October – 1 November: Istat
      • CORE WP7 - Costs
      Collection from
        • Implementation library for Generic interface (WP3)
        • Subprocesses integration in .NET (WP5) & Java (WP6)
      Integration Cost Reporting - categories to use:
        • Data conversion
        • Service embedding
        • Integration API.
      Costs include time spent on design, build and test Now collecting data
      • Final meeting Agenda
      9.30 – 10.00 Opening (Eurostat) 10.00 – 10.30 CORE Project Introduction (Istat) 10.30 –11.15 CORE Model (CBS) 11.15 – 11.30 Coffee 11.30 - 12.00 CORE Architecture (Istat) 12.00 –12.15 Workflow Solutions (Insee) 12.15 – 13.00 Q&A session 13.00 – 14.00 Lunch Break 14.00 –15.30 DEMO Sessions (Istat and CBS) 15.30 – 16.30 Open Discussion & Conclusions
      • Final remarks
      Rich results in 13 months: requirements -> general model -> software Relevance of work atmosphere Good cooperation between countries: WPs shared Big advancements in meetings: importance of presence -> beside wiki tools like webconference? Good cooperation with other groups : SAB , GSIM , HLG , MSIS , METIS , SDMX ESSnet (deliverable) Competences, skills and tools to be preserved Need sponsorship inside NSIs, in Eurostat and in other groups
        • Future?
      • CORE next steps:
        • CORE is NOT a package, but a “new way of working” -> industrialization & NSI involvement
        • CORE needs:
          • for industrialization : environment tested in NSIs -> generate requirements -> implementation
          • for adoption : Eurostat sponsorhip
      Connections outside CORE:
        • HLG-BAS: more cooperation needed (sprints and others)
        • Mutual review with OCMIMF on GSIM
        • SDMX integration and support to SAB