Your SlideShare is downloading. ×
0
Siemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa project
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Siemens - UNIDO SPX Prasa project

615

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
615
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Major Project DataCustomer: PRASATechnology: Electronic Interlocking, Axle counters, SATCOSOffer submission / revised: 30.06.2009 23.08.2010 30 06 2009 / 23 08 2010Contract signature: 13.04.2011Project Duration: 60 monthsProject Value: R 1000 MillionPRASA – National Re-Signalling Project Confidential / © Siemens AG 2011Page 1 L. Lefebvre, I MO RA, June 2011 Industry Sector, Mobility Division
  • 2. Scope of project  Midway/Lenz interim solution  Upgrade 15 stations to Electronic Interlocking as well as outdoor equipment  Construct a new CTC building (GNC)  Change local control stations to remote control stations  Connect all new and upgraded stations to the GNC (in phases)  Implement a telecoms network on existing fibre backbone p g  Relocate substation telecontrol monitor to new CTC  Relocate ICS (for current ICS Stations) to new CTC  Transmit CCTV images from various stations to new CTC  Perform small overhead and track works changes  Upgraded 4 and build 11 new relay rooms at specific sitesPRASA – National Re-Signalling Project Confidential / © Siemens AG 2011Page 2 L. Lefebvre, I MO RA, June 2011 Industry Sector, Mobility Division
  • 3. Outsourced Local Scope • Civil construction (GNC and relay rooms) • Outdoor installation (trenching cable laying (trenching, laying, equipment fitment) • Cable (copper & fibre) • Concrete products (equipment containers, signal bases, tiles) • Fabricated steel (cabinets signal structures (cabinets, structures, gantries, etc)PRASA – National Re-Signalling Project Confidential / © Siemens AG 2011Page 3 L. Lefebvre, I MO RA, June 2011 Industry Sector, Mobility Division

×