UEMC Co Profile

UEMC Co Profile

Published in: Business, Real Estate

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
868
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. UEM CONSTRUCTION SDN BHD http://www.uembuilders.com/uemc_n/
  • 2. UEM Builders (Singapore) Pte Ltd UEM Builders-Ansal API Pvt Ltd CORPORATE STRUCTURE
  • 3.
    • Roads
    • Rail
    • Drainage
    • Bridges
    • Utilities
    • Landscaping
    • Hospitals
    • Airports
    • Townships
    • Stadiums
    • Industrial Parks
    • Residential & Commercial
    - Earth cutting and filling - Ground treatment - Retaining wall system Infrastructure
  • 4. Year USD Million Revenue
  • 5.
    • 40 years’ experience in engineering & construction
    • 880 experienced professional staff (Engineers, Architects, QS, Accountants)
    • USD 315 million paid up capital
    • USD 1.3 billion total assets
    • Machineries available for local and international projects
    • USD 80mil worth of equipment in India, Malaysia and Qatar
    UEM Builder's Strengths & Resources
  • 6. http://www.uembuilders.com/uemc_n/ LANDMARK PROJECTS
  • 7.
    • 848 km of tolled expressway
    • Completed in 1993
    • Project cost: USD 1.8 bil.
    • Role: Concessionaire, Project Management, Construction
    NORTH SOUTH EXPRESSWAY
  • 8. KUALA LUMPUR INTERNATIONAL AIRPORT Integrated Development Development Area 100 km 2 Development Period 7 years Gross Development Value (GDV) USD 3.6 bil Role Project Management Construction (Satellite Building)
  • 9. NATIONAL SPORTS COMPLEX
    • 100,000 seat capacity National Stadium (outdoor stadium)
    • 16,000 seat Putra Stadium (indoor stadium)
    • 3,700 seat National Aquatic Centre (swimming complex)
    • Completed in 1998
    • Project cost: USD 400 million
    • Role: Concessionaire, Project Management, Construction
  • 10. KUALA LUMPUR LIGHT RAIL TRANSIT
    • Total length: 29 km (22 km elevated, 5 km underground and 2 km at-grade)
    • First world’s longest driverless LRT system completed in 1999
    • Capacity: 25,000 passengers/hr/direction
    • Project cost: USD2.04 billion
    • Role: Concessionaire, Project Management, Construction.
  • 11. http://www.uembuilders.com/uemc_n/ COMPLETED PROJECTS
  • 12. NORTH SOUTH EXPRESSWAY CENTRAL LINK Construction and O&M of 45 km of tolled expressway PENANG BRIDGE Operation and Maintenance of 13.5 km bridge NORTH SOUTH EXPRESSWAY MALAYSIA SINGAPORE SECOND CROSSING Construction and O&M of 44 km of highways including 2 km bridge Construction and O&M of 955 km tolled Highway EXPRESSWAYS
  • 13.
    • Construction of several packages amounting to 203 km dual two lanes tolled expressway.
    • Involved in implementation of heavy repair works and routine maintenance of the completed 848 km expressway since 1994.
    • Completed in May 1995.
    • Project cost: USD 630 million.
    NORTH-SOUTH EXPRESSWAY
  • 14.
    • Construction of 45 km of tolled expressway linking NKVE to Nilai North Interchange at NSE. Gateway to KLIA airport and Cyberjaya/Putrajaya.
    • Involved in implementation of heavy repair works and routine maintenance of the completed 60 km expressway since 1997.
    • Completed in December 1997.
    • Project cost: USD 236 million.
    NORTH SOUTH EXPRESSWAY CENTRAL LINK
  • 15.
    • Construction of 44 km of dual two/three lane tolled expressway and 2 km of bridge linking Johor to Singapore and to Johor City & NSE.
    • Involved in implementation of heavy repair works and routine maintenance of the completed 44 km expressway since 1997.
    • Completed in December 1997.
    • Project cost: USD 310 million.
    MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE
  • 16. NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING
    • North South Expressway – Proposed Third Lane Widening and Modification for Non-Stop Through Traffic for Packages 1, 2A, 2B, 3A, 3B, 4, 5 and 5A.
    • Commenced:
    • Package 1 -July 2005 (Completed)
    • Package 2A,2B,3A,3B & 4 –Aug 2005 (Completed)
    • Package 5 – August 2005 (Completed)
    • Package 5A –July 2005 (Completed)
    • Value : USD 253 million
  • 17. PENANG BRIDGE WIDENING
    • Construction of widening of the existing Penang Bridge.
    • Involvement of rejuvenation of the existing east side approach embankment foundations alongside extending the existing substructure of the main viaduct and providing longitudinal beams and construction of Uni-Directional Ramps to mainland side.
    • Completed on August 2009.
    • Project cost: USD 143 million.
  • 18. COMPLETED HIGHWAYS IN INDIA
  • 19. MAJOR HIGHWAYS COMPLETED IN INDIA
    • Construction & Maintenance (for 15 years) of
    • Tuni - Anakapalli, NH 5, Andhra Pradesh
    • Length : 59 km.
    • Project Cost (@ EPC) : USD 48 mil.
    • Construction & Maintenance (for 15 years) of
    • Tambaram-Tindivanam,NH 45,Tamil Nadu
    • Length : 93 km.
    • Project Cost : USD 63 mil.
    • Tumkur–Haveri-NH4, Pkg. 2,4,5-Karnataka
    • Length : 200 km.
    • Project Cost (@ EPC) : USD 152.7 mil.
  • 20. MAJOR HIGHWAYS COMPLETED IN INDIA
    • Etawah to Sikandra-NH 2, Uttar Pradesh – Pckg.1C
    • Length : 72km.
    • Project Cost : USD 63 mil.
    • Bhiwandi-Kalyan-Shil Phata, Maharastra
    • Length : 25 km.
    • Project Cost : USD 17 mil.
    • Kerala State Transport Project Phase-1
    • Length : 127 km.
    • Project Cost : USD 50 mil.
  • 21.
    • Upgrading of existing R1 Expressway
    • Length: 6.6km dual 3-lane highway
    • Completed: April 1998
    • Project cost: USD23 million
    MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES
  • 22. PROJECT IN QATAR
    • Qatar Primary Routes - Salwa Road Phase 1
    • Upgrading 81 km dual 4 lane highway linking Qatar-Saudi Border at Salwa to Doha
    • Total project cost: USD 265 million.
    • Completed: December 2008
  • 23. LIGHT RAIL TRANSIT SYSTEM Construction of total 29km elevated, underground and at grade track including stations for the driverless automated Light Rail Transit. ELECTRIFIED DOUBLE TRACK Construction of total 182km of Electrified Double Track Railway Lines between two major cities TRANSPORTATION
  • 24. PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR
    • Completed: 1999
    • Value: USD 494.3 million
    Project involved the construction of 29 km track way for Light Rail Transit System in Kuala Lumpur involving 22 km elevated track, 5 km underground tunnel and 2 km at-grade track. Construction of 5 underground LRT stations, 17 above-ground and 2 at-grade stations throughout the LRT system. Longest driverless automated LRT in the world. Implemented in November 1994 and completed in June 1999.
  • 25.
    • Construction of 155 bridge crossings for the 182 km electrified railway line linking Rawang to Ipoh.
    • Project Cost: USD 436 million.
    • 31 st March 2007
    IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING
  • 26. NATIONAL SPORTS COMPLEX Construction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities. KUALA LUMPUR INTERNATIONAL AIRPORT (KLIA) Construction of Satellite Building and ancillary works for the Malaysia’s largest airport. BUILDINGS & FACILITIES JSNAC Construction of Johor State New Administration Centre in Johor MARDI Agriculture Centre Construction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities. MINISTRY OF FINANCE II BUILDING Construction of Government Building for the Federal Government Administrative Centre in Putrajaya. NATIONAL HEART INSTITUTE Construction of new healthcare facilities for the extension of the National Heart Institute.
  • 27. NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR
    • Completed: 1998
    • Value: USD 286 million
    100,000 capacity National Stadium (outdoor stadium), 3,700 seat National Aquatic Centre (swimming complex) and 16,000 seat Putra Stadium (indoor stadium). Implemented in January 1994 and completed in July 1998 for the XVI Commonwealth Games.
  • 28. COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR
    • Completed: 1998
    • Value: USD 77.7 million
    • Gross Floor Area: 198,774 m²
    Construction of multi storey apartment blocks complete with recreational facilities. 1,500 units were built in total.
  • 29. KUALA LUMPUR INTERNATIONAL AIRPORT, SATELLITE BUILDING, SEPANG
    • Completed: 1998
    • Value: USD 157 million
    • Gross Floor Area: 148,000 m².
    Design and construction of the satellite building and its ancillary works as part of the Kuala Lumpur International Airport Complex. Project implementation in joint venture with international construction companies as consortium partners.
  • 30. EAST MALAYSIA HOSPITALS The planning, design, construction, equipping, commissioning and maintenance of six hospitals with a combined total of 976 beds were delivered to the Ministry of Health Malaysia in stages from 2002 till 2005. Five of the hospitals are located in the state of Sabah in East Malaysia, namely Lahad Datu, Keningau, Kuala Penyu, Pitas and Kunak. One more hospital is located in the state of Sarawak, also in East Malaysia, in Sarikei.
    • Completed: 2005
    • Value: USD 256 million
  • 31. Sarikei, Sarawak
    • Completed: December 2005
    • Value: USD 74 million
    • Total of 268 beds
    • Gross Floor Area: 40,000 sq. ft
    EAST MALAYSIA HOSPITALS Pitas, Sabah
    • Completed: June 2005
    • Value: USD 24 million
    • Total of 76 beds
    • Gross Floor Area: 15,284 m 2
  • 32. EAST MALAYSIA HOSPITALS Kuala Penyu, Sabah
    • Completed: May 2005
    • Value: USD 22 million
    • Total of 76 beds
    • Gross Floor Area: 15,284 m 2
    Kunak, Sabah
    • Completed: May 2005
    • Value: USD 24 million
    • Total of 76 beds
    • Gross Floor Area: 15,284 m 2
  • 33. EAST MALAYSIA HOSPITALS Keningau, Sabah
    • Completed: September 2002
    • Value: USD 58 million
    • Total of 212 beds
    • Gross Floor Area: 63,477 m 2
  • 34. EAST MALAYSIA HOSPITALS Lahad Datu, Sabah
    • Completed: January 2002
    • Value: USD 61 million
    • Total of 268 beds
    • Gross Floor Area: 68,1000 m 2
  • 35. Sarikei Hospital, Malaysia (268 Beds) EAST MALAYSIA HOSPITALS
    • Completed: December 2003
    • Value: USD 74 million
    • Total of 268 beds
    • Gross Floor Area: 40,000 sqft.
  • 36. UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE, TRONOH, PERAK
    • Completed: October 2005
    • Value: USD 7.7 million
    • Gross Floor Area: 5,659 m²
    The construction and completion of this uniquely designed ‘floating’ mosque at Bandar Seri Iskandar, Perak has a capacity to accommodate 4,000 people. The enclosed main prayer area is air-conditioned and can accommodate 1,000 people. The covered prayer area, accommodating 3,000 people, which was previously ventilated naturally, has been changed into an air-conditioned system.
  • 37.
    • Commenced: 10 September 2004
    • Completion: 6 November 2005
    • Value: USD90.5 million
    Construction and completion of 64 units of 3-storey link home and sewerage pump, Danau Villa Link Home, Taman Desa, Kuala Lumpur. DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR
  • 38. MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA
    • Commenced: 4 December 2002
    • Completed: 30 April 2007
    • Value: USD 60 million
    • Gross Floor Area: 67,108 m²
    Design, construction and completion of office buildings to house agencies under the Ministry of Finance at the New Federal Government Administrative Centre in Putrajaya. 2 office blocks, 8 and 10-storey high with each housing two levels of basement car parks. Scope of works include interior design works.
  • 39. CASA DESA CONDOMINIUM, KUALA LUMPUR
    • Commenced: 11 July 2005
    • Completed : 31 March 2008
    • Value: USD 24 million
    • Gross Floor Area: 9,794 m 2
    For the 410-unit Casa Desa Condominium, the contract package consists of substructure works and superstructure works. Project involves construction of 7 blocks of condominium buildings including earthworks, bored piling and pile caps.
  • 40.
    • Project : Agriculture Exposition Centre (Phase 2) – MARDI, Serdang
    • Commenced : 27 November 2007
    • Completed : 30 June 2008
    • Value : USD 64 million
    • Gross Floor Area: 25,000 m²
    AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG
  • 41. JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC), PHASE 1, JOHOR
    • Commenced: November 2005
    • Completed: August 2008
    • Value: USD 62 million
    The development of the JSNAC on a 320-acre site located at Bandar Nusajaya, 25 km from Johor Bahru, Johor is divided into three precincts comprising the Government precinct (273 acres), VIP residences and Istana reserve (17 acres) and government housing reserve (30 acres). Phase 1 of this development is divided into five packages where three packages, has been awarded. Project involves the construction of office buildings for the new state administrative centre in Johor.
  • 42. STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYA
    • Commenced: November 2005
    • Completed: February 2009
    • Value: USD 63 million
  • 43. UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR
    • Commenced: 1 June 2005
    • Completed: December 2008
    • Value: USD 45 million
    • Gross Floor Area: 35,000 m²
    This project involves the design and construction of a 29-storey office building with an 8-storey annex building at KL Sentral. The scope of works involves interior design.
  • 44. PLUS HEADQUARTERS, SUBANG
    • Development of one block of 10-storey office tower at Subang Toll, Petaling Jaya, Selangor Darul Ehsan
    • Commenced : 15 January 2007
    • Completed : December 2008
    • Value : USD 29 million
  • 45. NATIONAL HEART INSTITUTE, KUALA LUMPUR
    • Commenced: 5 September 2005
    • Completed: March 2009
    • Value: USD 64.6 million
    • Gross Floor Area: 32,840 m ²
    Design, construction, supply and commissioning and maintenance of new healthcare facilities for the extension of the National Heart Institute. This project is divided into four phases and works entail the renovating and refurbishing of existing facilities.
  • 46. COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR
    • Construction of 21 multidisciplinary buildings comprising classrooms, workshops/labs, cafeterias, recreation facilities, auditorium and administration buildings with a total area of 63,000 m 2 and external infrastructure for campus area of 300,000 m 2 .
    • Project cost: USD 100 million.
    • Completed: October 2006
  • 47.
    • Project : 548 Units (5 Blocks) Apartment
    • Using Industrialised Building System (IBS) Method
    • Commenced : September 2006
    • Exp. Completion : March 2008
    • Value : USD 39 million
    • Gross Floor Area: 60,500 m²
    GOVERNMENT APARTMENTS, PUTRAJAYA
  • 48.
    • Proposed Basement Structural Works for Universal Studio
    • Commenced: March 2008
    • Completed: July 2008
    • Value: USD 4.5 million
    • Gross Floor Area: 65,800 m²
    RESORTS WORLD AT SENTOSA, SINGAPORE MC04-F1
  • 49. http://www.uembuilders.com/uemc_n/ ON-GOING PROJECTS
  • 50. BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR
    • Design, construction and completion of 2 office towers (32 and 38-storeys), 1 block of 8-storey annex comprises of car parks and 1 unit PPU
    • Commenced : 1 June 2009
    • Exp. Completion : December 2011
    • Value : USD 26 million
    • Gross Floor Area: 188,000 m²
  • 51. PENANG SECOND BRIDGE
    • Project : Design, Construction and Completion of the Penang Second Bridge.
      • Package 2 : Super-structure Works of Approach Spans.
      • Overall length - 24 km
      • Length over water - 17 km,
      • Main span : Length - 250 meters
      • Height clearance (above water) – 30 meters
      • Number of vehicle lanes – 2 + 1 for motorcycles (each direction)
    • Commenced : June 2009
    • Exp. Completion : March 2013
    • Value : USD 473 million
  • 52. PHG’-S’GOR RAW WATER TRANSFER PROJECT
    • Pahang - Selangor Raw Water Transfer Project Lot 1-1, Water Transfers Tunnel & Related Works (2,260 Mld.)
    • Commenced : June 2009
    • Exp. Completion : May 2014
    • Value : USD 400 million
    • Length: 44.6km ; Diameter: 5.2m
  • 53.
    • 1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh
    • Project : Construction of various building and engineering works at Sushant Golf City, Lucknow U.P. India.
    • Commenced : 1 April 2008
    • Exp. Completion : February 2012
    • Value : USD 497 million
    • Total Development Area : 1,765 acre
  • 54.
    • Project : 4000 units Housing Project for the National Housing Scheme, Brunei.
    • Commenced : 2 February 2010
    • Exp. Completion : February 2014
    • Value : USD 290 million
    • Total Development Area: 309 hectares
    4000 UNITS HOUSING PROJECT, BRUNEI
  • 55. NEW LCC TERMINAL AT KLIA, SEPANG
    • Project : Design, Construction and Completion, Testing, Commissioning and Maintenance of Main Terminal Building, Satellite Building, Sky Bridge and Piers.
    • Commenced : 16 August 2010
    • Exp. Completion : April 2012
    • Value : USD 316 million
  • 56. Thank You This document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this document may be reproduced, stored or transmitted in any forms or by any means without written permission of United Engineers (Malaysia) Berhad. This document is designed to provide information in relation to the subject matter covered for this presentation and should not be used for any other purpose. Whilst every care has been taken in its preparation, no person should draw conclusions purely on the basis of the material contained herein. If assistance is required, reference should be made to the relevant professional of United Engineers (Malaysia) Berhad.

×