Endo note 10 preparation of straight canal

1,452 views

Published on

Dr. Özkan ADIGÜZEL

Published in: Education, Travel, Technology
0 Comments
3 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,452
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
67
Comments
0
Likes
3
Embeds 0
No embeds

No notes for slide

Endo note 10 preparation of straight canal

  1. 1. Preparation Of Straight Root Canal8/10/2009 Endo 10 1
  2. 2. Non-vital tooth Initial access9/12/2009 Endo 10 2
  3. 3. Cutting into the pulp Removal pulp roof9/12/2009 Endo 10 3
  4. 4. Use of Briault probe9/12/2009 Endo 10 4
  5. 5. Extension of access cavity9/12/2009 Endo 10 5
  6. 6. Completed access cavity.9/12/2009 Endo 10 6
  7. 7. Use of barbed broach Root canal irrigation9/12/2009 Endo 10 7
  8. 8. Direct line access9/12/2009 Endo 10 8
  9. 9. Prepare coronal part with gate bur9/12/2009 Endo 10 9
  10. 10. Tooth length hl Working length9/12/2009 Endo 10 10
  11. 11. Apical anatomy Apex Apical foramenApical constriction 9/12/2009 Endo 10 11
  12. 12. Fist bound file Master K- File9/12/2009 Endo 10 12
  13. 13. Master H- File Apical stop After preparing first 0.5mm step9/12/2009 Endo 10 13
  14. 14. 1mm Second step 1.5mmThird step Prepared apical third 9/12/2009 Endo 10 14
  15. 15. Summary of tapering apical part9/12/2009 Endo 10 15
  16. 16. Trial filling Insertion of finger spreader Lateral condensation9/12/2009 Endo 10 16
  17. 17. Obturated canal Temporary restoration 9/12/2009 Endo 10 17
  18. 18. Crown restoration with GIC and LCC9/12/2009 Endo 10 18

×