Your SlideShare is downloading. ×
Three Gorges Dam
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Three Gorges Dam

3,458
views

Published on

Published in: Technology, Business

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
3,458
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Three Gorges Dam Case study of hard engineering
  • 2. Your task ….
    • Produce an A4 fact file giving background information on the Three Gorges Dam, include details about location, date of completion etc
    • Create a table to give economic , social and environmental costs and benefits of the project
  • 3. Three Gorges Dam environmental (impact on surroundings including the land, water and air as well as features of the built up areas) Social (effects on people, their health, lifestyle, community) Economic (costs and finances at a variety of scales, from individuals up to government) Benefit Cost
  • 4. references
  • 5. http://news.bbc.co.uk/player/nol/newsid_5000000/newsid_5000200/5000294.stm?bw=bb&mp=wm&news=1&bbcws=1 http://www.youtube.com/watch?v=T2JMVxnMqxU http://www.youtube.com/watch?v=a6ioHuJOm3I
  • 6. More references….
    • Guardian
    • Geofact sheet 114
    • www.guardian.co.uk/gall/0,,835373,00.htm
    • l