Bogota

  1. 1. Traffic and Transport Research Program Bogota`s transportation ProjectsAre We able to do what We need ? Eng. MSc. Carlos Moncada National University of Colombia Munich, October, 2012
  2. 2. BOGOTA - COLOMBIA Traffic and Transport Research Program According to the 2005 National Census has a population of 7.4 Million inhabitants. Total area: 1.776 km² - Total Density 4.146 inhab/ Km²
  3. 3. BOGOTA – DENSITY Traffic and Transport Research Program
  4. 4. TOTAL TRIPS- MODAL SHARE Traffic and Transport Research Program 1% 3% 1% 3% bicycle 1% 2% 20% school informal intermunicipal motorbike other foot9% car taxi 4% TransMilenio 46% Public transport 10% On a working day 17.611.061 trips are made. Source: “Informe de indicadores de Movilidad de Bogota 2011” Steer Davies & Gleave Limited.
  5. 5. ORIGINAL BUSINESS MODEL BOGOTA’S Granted permits to operate without clear SECRETARY of control mechanisms TRANSPORT and assigns fares Exploits Get income based TRANSPORT authorizations to on the number and COMPANY not take risks operate routes Receives a fixed VEHICLE Pay to operate income and assumes OWNER some risks Pay a fixed Earn per passenger value to the transported and DRIVER assumes the majority owner of business risks Pay for the USER service
  6. 6. EXPECTED COVERAGE OFTRANSMILENIO BY 2032
  7. 7. TRANSMILENIO SYSTEM Traffic and Transport(PHASE I – II- III) Research Program • What’s the success ??? TM Source: Alcaldía Mayor Bogotá DC: Documento Técnico Fase III TransMilenio S.A ( December 2004)
  8. 8. TRUNK LINES OF TRANSMILENIO(PHASES I-IV) Source: TransMilenio and IDU, 2006
  9. 9. AVERAGE TRAVEL TIME IN BOGOTA Traffic and Transport Research Program Source: Observatorio de Movilidad de Bogotá y la Región con base en datos de la Secretaría Distrital de Movilidad. (Junio 2010) Camara de Comercio de Bogotá www.camara.ccb.org.co
  10. 10. Traffic and TransportBOGOTA - COLOMBIA Research Program
  11. 11. WHAT ARE THE NEEDS ? DEMOGRAPHIC CHANGE INCREASING MOTORIZATION GROWING UNIFORMLY URBANIZATION CLIMATE CHANGE
  12. 12. BOGOTA’S TRANSPORTATION Traffic and Transport Research ProgramPROJECTS  TransMilenio  Underground  Tramway  Intelligent Transportation System (ITS)  Cable car’s  Bicycle Paths  Integrated system
  13. 13. BOGOTA’S TRANSPORTATION Traffic and Transport Research ProgramPROJECTS Source: Secretaria Distrital de Movilidad de Bogotá. (May 2012)
  14. 14. UNDERGROUND SYSTEM Traffic and Transport Research Program Length: 29 Km and 28 stations, where 18,7 km are underground, 3,6 km are over the surface,. Commercial speed: 35 km/h Estimated demand: 800.000 persons per day Cost of the initial investment: USD $1.900 Mio Cost per kilometer: USD $90 millions Cost person / kilometer: USD $112
  15. 15. TRAMWAY LINES Traffic and Transport Research Program Source: Secretaria Distrital de Movilidad de Bogotá. (May 2012)
  16. 16. TRAMWAY Traffic and Transport Research Program
  17. 17. Traffic and Transport Research ProgramCABLE CARCable car system in thesouth of the city is targetedto the low social classpopulation and will be initiallyconnected with TransMileniosystem, and later on with theunderground system. Itsconstruction will begin on2013.
  18. 18. BICYCLE PATHS Traffic and Transport Research Program Source: Instituto de Desarrollo Urbano IDU. www.idu.gov.co; Revista Económica Supuestos, Universidad de los Andes “Evaluación de la ciclorutas como política pública en Bogota: Estado Actual y retos”
  19. 19. BICYCLE PATHS MAP Traffic and Transport Research Program
  20. 20. INTEGRATED SYSTEM Traffic and Transport Research Program
  21. 21. ITS (INTELIGENT Traffic and Transport Research Program TRANSPORTATION SYSTEM)Modernization of the traffic light system.Permanent information to the users and tomobility authorities through traffic monitoringElectronic detection of offendersLevel improvements on transit servicesDecrease on accidentally indexes Source: Concejo de Bogota, www.concejodebogota.gov.co; Movilidad y Señales de transito (2009)
  22. 22. Traffic and TransportITS (INTELIGENT Research ProgramTRANSPORTATION SYSTEM) It’s been estimated a total investment of USD $146 million It includes traffic lights, cameras, traffic control center, equipment for operation and maintenance, and road safety for pedestrian. Source: www.interactic.org.co/index “Alcaldía de Bogotá firmó convenio con ETB y Universidad Distrital para sistema inteligente de transporte” www.bogota.gov.co Sistema Inteligente de Transporte: Distrito moderniza semaforización (2010)
  23. 23. Traffic and TransportTOTAL INVESTMENT COST Research Program PROJECT COST USD $ Million PHASE I - II PHASE III PHASE IV TransMilenio 682 730 700 Underground (UFL) 1.900 Tramway First Line 1.500 ITS 146 South Cable 120 Bicycle Paths 60 Total investment of USD $ 5.400 Millions
  24. 24. Traffic and Transport BUT ALL THESE STRATEGIES Research Program MEET OUR NEEDS ? Transport systems are measures for mitigation not to solve the real problem Until now there is no strategy for the 46 % of trips (pedestrians) Change land use and reorganize our city planning will be less expensive TOD and land use policies are more effective than increase infrastructure of transport Transport policies (like our BRT) require not only technical approach but also a strong legal framework and land use control if you are looking for efficient measures It is required to follow the master’s plan and accomplish the goals to meet the needs of population
  25. 25. Traffic and Transport Research Program Thanks so much Carlos Alberto Moncada A.National University of Colombia camoncadaa@unal.edu.co

×