• Save
Faqs
Upcoming SlideShare
Loading in...5
×
 

Faqs

on

  • 124 views

faq

faq

Statistics

Views

Total Views
124
Views on SlideShare
124
Embed Views
0

Actions

Likes
0
Downloads
1
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft Word

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Faqs Faqs Document Transcript

  • FAQs: 1. Tell us about your most recent assignment or current job position? My recent assignment is with <Client Of Latest Project> as QA Analyst, also Lead.. Worked on <no.of> projects within Nationwide since last <no.of Years> so used both Mercury QTP tool My major responsibilities are like: 1. Creating test plans and test cases based on the functional requirements document using Quality Center and Once test cases are created I used to do automation scripts based on those test cases. 3. When I worked with LISA or QTP, I use to record scripts and modified them based on the End user expectations. 4. While modifying I used to insert lot of verification points using Filters (output values - QTP) , also page load verifications using Assertions (Page CheckPoints -QTP) . 5. Also build some basic Java assertions (Page Checkpoints - QTP) …for verification of field properties like its length, existence of field, its label verification …….. 6. I also used to configure my script to run in different Environments by setting all environment properties under Configuration files.(Environment Variables /Files- QTP) 7. Used to run script with different scenarios by inserting all the input fields into the dataset and parameterizing those column names with in script. 7. I also inserted failure logs into my script, so that I can inform to my team or open a defect based on the priority when bugs are found. 8. Use to attend to my team meetings and also testing meetings. 9. Weekly I use to submit my report to the Testing team manager and Project Manager. 10. I also used to keep track of the issues identified and close issues after verification.