0
Bogdan Mircea Tomescu
Control & Instrument Engineer
Profile
Experienced Control&Instrument Engineer/Supervisor with expertise in:
   Design

   FAT / SAT

   Commissioning ...
Work experience (1)
June-Oct 2008:                     Sep-Oct 2007:
    IT/Control System Trainer,         Senior Design
...
Work experience (2)
May-June 2006:                         Mar 2002- Dec 2003:
    Mark VI Specialist, Elf                ...
Activities & Skills (1)
Electrical & Instrument   Training of DCS, F&G and ESD
Trainer                   Telecom trainin...
Activities & Skills (2)
                    Philosophy/Control   narratives for DCS, ESD, Fire&Gas,
Detail/basic E&I
    ...
Activities & Skills (3)
Electrical & Instrument    Experience   to perform variety of complex
Surveyor                   ...
Activities & Skills (4)
                         Verifiesthat the pre-commissioning,
E&I Commissioning /
                ...
Activities & Skills (5)
               All related technical matters, and liaison with other
Project E&I     discipline e...
Tools used (1)
Management           KPI (Matrikon),
Information System   Yokogawa Exaquantum/PIMS,
                     XP...
Tools used (2)
Substation          VSD System,
Management          SR750, SR489, SR 745, SR 469

CMMS                Maxim...
References



         http://www.linkedin.com/in/tomescu
       Section “Recommendations For Mircea”
Upcoming SlideShare
Loading in...5
×

Bogdan Mircea Tomescu Presentation

941

Published on

presentation

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
941
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Bogdan Mircea Tomescu Presentation"

  1. 1. Bogdan Mircea Tomescu Control & Instrument Engineer
  2. 2. Profile Experienced Control&Instrument Engineer/Supervisor with expertise in: Design  FAT / SAT  Commissioning / Start-up, Maintenance  Project Management.  More than 12 years experience in onshore / offshore (FPSO) Oil&Gas industry with extensive experience in: control system,  real time monitoring of production,  key performance indicators,  management information system.  Developping sustained relationships with internal management, project team, clients and external vendors.
  3. 3. Work experience (1) June-Oct 2008: Sep-Oct 2007: IT/Control System Trainer, Senior Design   Snamprogetti, ENI Group, UAE Control&Instrument Engineer, WorleyParsons Europe Ltd, UK Project Name: Ruwais 3rd NGL  Train Project, Project Name: Optimization for  Client: GASCO, UAE  Surface Production System of Petrom Jan-June 2008: Client: OMV Group, Romania  Design ICSS Team Leader,  Tecnomare SpA, ENI Group, Feb 2005-Aug 2007: Italia Project Manager / Project Project Name: Kashagan   Experimental Project, Engineer, OMV Group, Kazakhstan Romania Client: Agip KCO, Italy  Project Name: Turnkey Projects  for Petrom’s refineries Client: OMV Group, Romania 
  4. 4. Work experience (2) May-June 2006: Mar 2002- Dec 2003: Mark VI Specialist, Elf Control&Instrument Engineer,   Petroleum Nigeria Limited, Total Snamprogetti, Oman Group, Nigeria Project Name: Qualat LNG  Project Name: Production Client: Chiyoda-Foster Wheeler,   Storage and Offloading (FPSO) OMAN vessel, Bonga Field Client: Elf Petroleum Nigeria  Sep 1996 – Feb 2002: Limited, Nigeria Control & Instrument  Engineer, Petrom SA, Romania Jan 2004-Jan 2005: Project Name: Commissioning /  E&I Supervisor, Petrom SA,  Maintenance for Control System OMV Group, Romania in refinery Project Name: Modernization of Client: Petrom SA, Romania   Petrom refineries Client: OMV Group, Romania 
  5. 5. Activities & Skills (1) Electrical & Instrument Training of DCS, F&G and ESD Trainer Telecom training Electrical (substation station) training
  6. 6. Activities & Skills (2)  Philosophy/Control narratives for DCS, ESD, Fire&Gas, Detail/basic E&I HVAC systems design engineer  Participant to establish Safety Integrity Level (SIL) according IEC 61508/61511, BS EN 54 standards  Procurement of control systems; Follow-up; Check P&IDs, C&E diagrams of the vendors/client versus their bit map serial link, client P&IDs and specifications, Cable lists, I/O lists, segregation and assignment of I/O signals  Update and development of all philosophies, specifications, data sheets and drawings  Check control system specifications for control and safety systems, logic diagrams, fire and gas logic diagrams, instrument database, alarms design sequence of events and archive design, logic diagrams for operational petrochemical interlocks
  7. 7. Activities & Skills (3) Electrical & Instrument  Experience to perform variety of complex Surveyor inspection jobs within the discipline.  Write inspection reports, non-compliance reports; prepare and maintain inspection reports.  Review inspection waiver requests.  Familiarized with subcontractor Quality Plans, ITP’s and procedures.
  8. 8. Activities & Skills (4)  Verifiesthat the pre-commissioning, E&I Commissioning / commissioning & start up requirements are maintenance accounted for into engineering documents Engineer / Supervisor  Project planning & scheduling  Configuration/maintenance of SMART instruments/valves  BENTLY NEVADA Vibration Monitoring Systems  Commissioning MARK VI system, antisurge system CCC  Performing loop check, provision of technical assistance to vendors’ specialists for equipment energization and start-up, trouble shooting, instruments re-calibration
  9. 9. Activities & Skills (5)  All related technical matters, and liaison with other Project E&I discipline engineers Engineer  Preparation of Statement of Requirement and Cost Estimates for projects.  Preparation of Scope of Work, Specifications and drawings, Enquiry packages with Bid forms  Attendance of project Tests and Inspections  Task management, program issue, staffing forecast, organize training for key users and end users; support for post implementation issues, progress reports  Control the activities of sub-contractors  Identify and collate the costs involved in order to develop an overall budget  Managed SAT and System Integration Tests  Responsible for ensuring Site Standards and compliance according with QA procedures
  10. 10. Tools used (1) Management KPI (Matrikon), Information System Yokogawa Exaquantum/PIMS, XPIMS (Aspen) (Enterprise Resource Planning) System Project Management MS Project 2003, Primavera 3.0 ABB with Symphony DCI, DCS / ESD / F&G Yokogawa Centum CS 3000 (ProSafe-RS), Foxboro I/A Series, Honeywell TDC 3000, Fisher Rosemount RS3 & Triconex Tricon1131, PLC SIEMENS SIMATIC S5 & S7, Bentley Nevada 3500, Honeywell, BMS (Macchi), GE Speedtronic Mark VI, Allen Bradley SLC500, Twido PLC (Schneider)
  11. 11. Tools used (2) Substation VSD System, Management SR750, SR489, SR 745, SR 469 CMMS Maximo 5.2, SAP PM/MM Database Oracle 9i, MS Access 97/2003, Smartplant/Intools Oil transport Amos monitoring System OS Windows NT4; 2000/2003 Enterprise server; UNIX Operating System Office expert level for MS Word 2000/2007, Excel 2000/2007, Visio 2000/2007, Publisher 2000/2007, PowerPoint 2000/2007
  12. 12. References http://www.linkedin.com/in/tomescu Section “Recommendations For Mircea”
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×