Petrobras oim presentation rev tt nov 2010 vsersion

1,147
views

Published on

OIM Petrobras Presentation

OIM Petrobras Presentation

Published in: Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,147
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Add cross section
  • Transcript

    • 1. TRELLEBORG MARINE SYSTEMSOFFSHORE INTEGRATED MOORING PRESENTATION
    • 2. TRELLEBORG AB – Corporate Overview
      Sales by Region
      Asia
      • Total sales ~ US$ 3.5 Billion*
      • 3. Employing ~ 20,000 people*
      • 4. Present in 40 countries worldwide
      • 5. Manufacturing in ~100 plants
      • 6. Globally, among largest non-tire rubber players
      Americas
      Europe
      * Incl recent acquisitions, proforma
      2
    • 7. Our Trelleborg Marine Systems offices are located at Sao Paulo & Rio de Janeiro
      Trelleborg Offshore (a different business unit) have gained vendor qualification with Petrobras for their range of subsea equipment.
      3
    • 8. TRELLEBORG AB – Business Areas
      Trelleborg
      Engineered Systems
      Trelleborg
      Sealing Solutions
      Trelleborg
      Automotive
      Trelleborg
      Wheel Systems
      Trelleborg MarineSystems
      (Business Unit)
      Trelleborg Marine Systems –Mooring, Trellex, Fentek, Seaward
      4
    • 9. 5
      OFFSHORE INTEGRATED MOORING
      Company History
      • Formerly called Harbour Marine Engineeringestablished in 1972
      • 10. Acquired by Trelleborg in 2006 name changed toTrelleborg Marine Systems
      • 11. Focus on design & manufacture of mooring monitoring & berthing systems for fixed as well as floating terminals.
    • HISTORY – SUPPLY TO PETROBRAS FACILITIES
      Offshore:
      TUPI FPSO – TANDEM MOORING SYSTEM
      Supplied to BW Offshore
      CASCADE &CHINOOK FPSO - TANDEM MOORING SYSTEM
      Supplied to BW Offshore
      JUBARTE FPSO P57 – TANDEM MOORING (QRH)
      Supplied to SBM Inc.
      6
    • 12. HISTORY – SUPPLY TO PETROBRAS
      Onshore Terminals
      BR Salvador Terminal
      Scope of Supply : Complete mooring load monitoring & remote release systems.
      Supplied via representatives Laser Tech Brazil (Formerly GHF)
      Guanabarra NG & Pecem LNG Terminals
      Scope of Supply : Complete mooring load monitoring & remote release systems.
      Supplied via representatives Laser Tech Brazil (Formerly GHF)
      7
    • 13. OUR KEY STRENGTHS
      In-house mechanical and instrumentation design capabilities to provide standard as well as custom mooring, berthing and offloading solutions.
      ISO 9001 & ISO 14001 with Lloyds Register Accreditations
      Over 60 FPSO ship sets of tandem mooring equipment supplied since 1980
      Largest supplier of integrated mooring berthing systems for on shore LNG facilities
      First to develop the integrated STS solution now installed on the first of the FSRU vessels such as Golar Freeze & Golar Frost.
      Dedicated in house Maintenance & Services Group offering routine contract and break down maintenance services worldwide.
      8
    • 14. 9
      October 2, 2008
      PRESENTATION FOCUS
      Ship to Ship Integrated Mooring & Berthing
      Transfer of crude FPSO & LNG for FSRU applications
      Tandem Mooring & Offloading
      Conventional stern Tandem Offloading for FPSO
      Mooring Systems with integrated Hose & Reel package
      Spread Mooring
      Shallow water, long chain, multi leg mooring systems for FPSO
      OFFSHORE APPLICATIONS
    • 15. Ship to Ship Mooring
      for Oil & Gas Transfer
      10
    • 16. SHIP TO SHIP MOORING & BERTHING
      • QRH with capstan, load monitoring and high security remote release systems
      • 17. RTK GPS Approach & Berthing
      • 18. Portable Workstations - Carry On Board
      • 19. Environmental - Met Ocean
      • 20. Fenders & deployment systems
      • 21. Fairleads & Chocks
      • 22. Rope reelers augmentation to LNGC mooring
      • 23. Class Approval DNV, ABS, RINA & Lloyds
      11
    • 24. STS - GOLAR FREEZE & GOLAR FROST
      12
      Golar Freeze for Dubai LNG
      Golar Frost for Livorno LNG
      GolarKhannur West Java LNG
      FSRU of 287m long volume 125,000 cubic meters of LNG
      • STS Quick Release Hooks
      • 25. Load Monitoring
      • 26. Remote Release
      • 27. RTK Berthing Aid
      • 28. RINA Class Approval – FSRU Frost
      • 29. DNV Class Approval - FSRU Freeze
    • STS - TI AFRICA & TI ASIA
      13
      TI AFRICA
      ULCC largest double hulled vessels of 380m long 440,000 DWT
      • STS Quick Release Hooks
      • 30. Load Monitoring
      • 31. Remote Release
      • 32. RTK Berthing Aid
      • 33. Fender Deployment System
      • 34. Tandem Mooring
      • 35. Lloyds Register Class approval
      TI ASIA
    • 36. STS Mooring Hooks during commissioning 2009
      14
      Golar Freeze
      Commissioning – Ti Africa
    • 37. Instrumentation & Integration
      15
    • 38. INTEGRATED CCR SERVER & WORKSTATIONS
      • Mooring line tension display
      • 39. Mooring set up & alarm level configuration
      • 40. Mooring tension warnings
      • 41. Approach & Berthing speed, distance & position display
      • 42. Met Ocean Wind Wave Current
      • 43. Telemetry Communications of Mooring, Berthing & Met Ocean to Secondary Vessel
      • 44. Integrated Data Logging
      16
    • 45. 17
      Integration concept for STS originated from onshore LNG mooring & berthing
    • 46. Berthing & Approach Systems
      18
    • 47. GPS Based Technology
      Satellite Navigation Systems - DGPS & RTK technology
      • Monitors the relative closing speed & distance between two vessels for STS or Tandem Mooring applications.
      • 48. Provides Primary & Secondary vessels with berthing data with integrated feed from Met Ocean sensors.
      • 49. Primary vessel fitted with the fixed system. Secondary vessel is supplied with the portable carry on board unit.
      19
      Bridge Unit
      STS or tandem
      Berthing
      Navigation
    • 50. 20
      Information can be displayed over a wireless network or telemetry between vessels to:
      • Carry On Board Workstations
      • 51. Fixed workstations integrated with load monitoring emergency release & ship to
      • 52. Large Main Display Board installed on board the Primary vessel i.e. FSRU or FPSO
    • Tandem Mooring & Offloading Systems
      21
    • 53. 22
      TANDEM MOORING SOLUTIONS
      Shuttle tanker Tandem Mooring Winches
      With Emergency Quick Release Mooring to full load
      Load Monitoring Local & CCR with Load History recording
      GPS approach monitoring
      Load alarm options deck or CCR load alarm stations
    • 54. 23
      FPSO TANDEM MOORING
      Hawser hook with load monitoring and remote release
      Hawser reeler (vertical or horizontal) with hawser
      Trelleborg hose and hose reeler
      Certified by classification society (i.e.. DNV, ABS, Rina, Lloyds)
    • 55. 24
      Quick Release Hawser Hooks
      • Class Certified
      • 56. OCIMF compliant
      • 57. SWL 250t or 400t
    • 25
    • 58. 26
      I have called it the “LIMP- D- HOOK” or LDH.
    • 59. 27
    • 60. Vertical Tandem Mooring Winch – Tupi FPSO
      21inch 150m integral buoyancy hawser with 76mm dia. chafe chains
      400t Quick Release
      Load Monitoring
      Remote Release
      28
    • 61. 29
    • 62. Offloading Hose
      & Hose Reel Systems
      30
    • 63. Trelleborg Offloading Hoses
      31
      • Dual & Double carcass manufactured by Trelleborg
      • 64. API 17K certified
      • 65. Unique flexibility & recess flange design allows for a compact reeler drum.
    • 32
      IMO & OCIMF compliant design
      Stores up to 340m of 20inch hose
      Capacity 35t pull
      Spooling system & fairlead to reduce abrasion to hose
    • 66. Spread Mooring
      33
    • 67. 34
      Bow Spread Mooring
    • 68. Spread Mooring Equipment List
      Chain stoppers Dual Pawl Type or Quick Release to suit chain up to 127 mm diameter with optional :
      Load Monitoring System
      Load Alarm Stations
      Local and remote display at CCR
      Chain Tensioners - Using winch or jack
      Hazardous Area Compliant
      Class Approved
      Fixed or transferable within a stopper group.
      Chain Fairleads & Chutes
      Fixed & Sheave type,
      Swivelling above & below water configurations
      Chain to 127mm
      35
    • 69. Q
      36
      10 Point Spread Mooring
      Chain - 1200 metres 105mm U3
      Load Monitoring to 800t
      Releasable 0 to 600t
      MBL > 1200t
      Chain Size 89mm
      Load Monitoring to 250t
      Releasable 0 to 250t
      MBL > 580t
    • 70. DUAL PAWL TYPE CHAIN STOPPERS 76 - 120mm Chains
      37
    • 71. 38
      Fenders – Pneumatic or Foam
      Fender Deployment Systems
      for STS
    • 72. FENDER DEPLOYMENT - DAVITS
      Fender deployment davits are designed to store the fender either on deck or outboard over the side of the vessel.
      • Hydraulic or Electric operation
      • 73. Lift capacity to 15t
      • 74. API or IEC design
      • 75. High dynamic FOS for open sea deployment applications such as FLNG
      39
      6 Fender Deployment FPSO - Ti Africa ULCC
      Out board fender storage proposed for Livorno FLNG
    • 76. FENDERS – PNEUMATIC & FOAM
      40
      Pneumatic Fenders
      • Up to 4.5m diameter & 12 m long
      • 77. Complete with Tyre & Chain net
      • 78. Rigging in chain, wire or synthetic rope
      Foam Fenders
      • Up to 3.8m diameter & 6 m Long
      • 79. Do not require Chain net
      • 80. Virtually unsinkable
      • 81. Closed cell foam & 28mm polyurethane skin
    • 41
      CommissioningTraining Maintenance
    • 82. 42
      Questions?