Living in harmony with Nature
Challenges in implementing Renewable Energy
in Tall Buildings
June, 2016
Tejwant Navalkar
Living in harmony with Nature
 RENEWABLE ENERGY – AN INTRODUCTION
 GRIHA RENEWABLE ENERGY REQUIREMENTS
 LEED – NC RENEWABLE REQUIREMENTS
 IGBC – GREEN HOMES REQUIREMENTS
 CASE STUDY – A 240.7m tall Building
• Building Features
• Solar Hot Water Schematic
• Solar PV Requirements
• Challenges in implementing Renewable Energy
 POSSIBLE SOLUTION
 CASE STUDY for IMPLEMENTING THE SOLUTION
 NEED TO REVIEW THE GREEN RATING APPROACH
AGENDA
Living in harmony with Nature
 SOLAR PHOTOVOLTAIC (PV) SYSTEMS
 SOLAR THERMAL SOLUTIONS
 WIND TURBINE
 BIO-GAS FOR COOKING & ELECTRICITY
GENERATIONC
RENEWABLE ENERGY : An Introduction
Living in harmony with Nature
Living in harmony with Nature
 CRITERIA – 6 (Outdoor Lighting) - 1 point
 Minimum 25% of total outdoor lighting fixtures or
15% of total connected load, whichever is higher,
has to be provided with solar lighting
 CRITERIA – 18 (Renewable Energy Utilization) - Max 5 points
 Rated capacity of Renewable Energy system should
be minimum 1% of internal lighting and space
conditioning connected loads in the building
(MANDATORY)
 Rated capacity of Renewable Energy system meets annual
energy requirements from 5% upto 30% of internal
lighting connected load (Upto 4 points)
GRIHA : RENEWABLE ENEGY REQUIRMENTS
Living in harmony with Nature
 CRITERIA – 19 (Renewable Energy based Hot Water Generation)
- Max 3 point
 Annual energy saved by Renewable Energy system is
20% to 50% of annual energy required for water heating
to meet the hot water requirement of the building.
(1 point)
 Annual energy saved by Renewable Energy system is
50% to 70% of annual energy required for water heating
to meet the hot water requirement of the building.
(1 point)
 Annual energy saved by Renewable Energy system is
above 70% of annual energy required for water heating
to meet the hot water requirement of the building.
(1 point)
GRIHA : RENEWABLE ENEGY REQUIRMENTS
Living in harmony with Nature
 TOTAL POINTS FOR RENEWABLE ENERGY
GRIHA : RENEWABLE ENERGY REQUIRMENTS
Criteria Description Max points
Criteria – 6 Outdoor Lighting 1
Criteria – 18 Mandatory
Renewable
Energy Usage
1
Criteria – 18 Optional
Renewable
Energy Usage
4
Criteria – 19 Renewable
Energy based Hot
Water generation
3
TOTAL 9
This accounts for about 9% of the total 104 points for GRIHA
Living in harmony with Nature
GRIHA : RATING SYSTEM
Points Scored Rating
50 - 60
1 star
(*)
61 - 70
2 stars
(**)
71 - 80
3 stars
(***)
81 - 90
4 stars
(****)
91 - 100
5 stars
(*****)
Living in harmony with Nature
Living in harmony with Nature
LEED – NC : RENEWABLE ENERGY REQUIREMENTS
 EA CREDIT – 2 (Renewable Energy Usage) - Max 3 point
 Supply minimum 2.5% of the building’s total energy use
through use of on-site renewable energy systems.
(1 point)
 Supply between 2.5% & 5% of the building’s total energy
through use of on-site renewable energy systems..
(1 point)
 Supply between 5% & 7.5% of the building’s total energy
through the use of on-site renewable energy systems..
(1 point)
Living in harmony with Nature
LEED : RATING SYSTEM
Points Scored Rating
26-32 Certified
33-38 Silver
39-51 Gold
52-69 Platinum
Certified 26-32 points, Silver 33-38
points, Gold 39-51 points, Platinum
52-69 points
Renewable Energy accounts for about 4.5% of the total 69 points
for LEED
Living in harmony with Nature
Living in harmony with Nature
IGBC – GREEN HOMES : RENEWABLE ENERGY REQUIREMENTS
 ENERGY CREDIT – 4 (Solar Water Heater) - Max 3 point
 Provide solar water heating system to satisfy hot water
requirement for domestic purposes.
 The minimum hot water requirement for domestic purposes
should be calculated for 25 litres per person per day.
 Points are awarded as below:
Hot water through Solar Water Heater
as a percentage of the total Hot water
requirements
Points
 50% 1
 75% 2
 95% 3
Living in harmony with Nature
IGBC – GREEN HOMES : RENEWABLE ENERGY REQUIREMENTS
 ENERGY CREDIT – 6.0 (On-Site Renewable Energy)
Max 4 points
 Install renewable energy systems for atleast 2.5% of annual
consumption of the building.
 Points are awarded as below:
Renewable Energy as a percentage of
the total annual consumption
Points
 2.5 % 1
 5.0 % 2
 7.5 % 3
 10.0 % 4
Living in harmony with Nature
Living in harmony with Nature
CASE STUDY – 200.47m Tall Building
The Proposed Residential Project is spread over
365,735 sq.ft of land and is located Central Mumbai.
The Project has the following features:
 G + Podium floor(5nos) + atrium + 59floors
with 2BHK, 3BHK and 4BHK flats and 5BHK
(Penthouses)
 Sale Building having height of approximately
240.7m
Living in harmony with Nature
CASE STUDY – 200m Tall Building
 BASIC PROJECT DATA :
 Built-up Area : Approximately 44,700 sqm
 Terrace Area : About 400 sqm in two levels
 Total Flats : 148 (Mix of 2BHK, 3BHK, 4BHK & Penthouses)
 Expected occupancy : 1100
 Total Water Requirements : 140,000 litres/day
 Hot Water Requirements : 55,000 litres/ day
 Building Lighting & Conditioning Connected Load : 3,800KW
 Internal Lighting Connected Load : 2018KW
 Total Outdoor & Façade Lighting : 60KW
Living in harmony with Nature
CASE STUDY – 200m Tall Building
 GRIHA RENEWABLE ENERGY REQUIRMENTS for the BUILDING :
Criteria Description Renewable
Energy Required
Criteria – 6 Outdoor Lighting 10 KW
Criteria – 18 Mandatory
Renewable
Energy Usage
38 KW
Criteria – 18 Optional
Renewable
Energy Usage
60 KW
Criteria – 19 Renewable
Energy based Hot
Water generation
55,000 Litres Solar
Heater
Living in harmony with Nature
CASE STUDY – 200m Tall Building
 LEED-NC RENEWABLE ENERGY REQUIRMENTS for the BUILDING :
Criteria Description Renewable
Energy
Required
EA CREDIT – 2 2.5% of Maximum
Demand
50 KW
EA CREDIT – 2 5% of Maximum
Demand
100 KW
EA CREDIT – 2 7.5% of Maximum
Demand
150 KW
Internal Lighting Connected Load :
2018KW
Living in harmony with Nature
CASE STUDY – 200m Tall Building
 IGBC GREEN HOMES RENEWABLE ENERGY REQUIRMENTS for the
BUILDING :
Criteria Description Renewable
Energy
Required
Energy Credit – 4.0 Use of Solar Water
heater
55,000 solar
heater
Energy Credit 6.0 10% of Maximum
Demand
200 KW
Living in harmony with Nature
CASE STUDY – 200m Tall Building
 CONSTRAINTS IN IMPLEMENTING RENEWABLE ENERGY :
 Limited Terrace Area (400sqm in two levels)
• This can accommodate 7,000 litres solar heater OR
• This can accommodate 20 KW Solar PV Panels (Mandatory
requirement for GRIHA itself is 38KW)
 Tall building casts shadow on solar panels if mounted at the
podium level
 Intermediate Break pressure Hot water tanks required to be
installed at each of the fire break floors
 Circulating pumps required between solar heater and the
intermediate hot water tanks
 Re-Circulating pumps required for each hot water tank to
ensure instant hot water at the tap
Living in harmony with Nature
CASE STUDY – 200.47m Tall Building
 CONSTRAINTS IN IMPLEMENTING RENEWABLE ENERGY :
 With multiple toilet shafts for each flat, measurement of hot
water consumption not practicable
 Solar Lighting system shaded by shadow cast by the Tall
building
 Close density of trees required as per Green Rating system,
these cast shadow on solar street lights
 Long cable lengths from the Terrace to the main LT
distribution panel
Living in harmony with Nature
Living in harmony with Nature
 POSSIBLE SOLUTIONS IN IMPLEMENTING
RENEWABLE ENERGY in TALL BUILDINGS :
 Provide covered shades fitted with Solar PV
modules over Swimming Pools
 Use of Integrated Building PV modules on
vertical faces of the Building.
POSSIBLE SOLUTIONS (1/2)
Living in harmony with Nature
 ALLOW CREATION OF OFF-SITE RENEWABLE SOLUTIONS :
 The building proponent creates Renewable Energy facilities
at an off-site location.
 The extent of Renewable Energy usage created in the off-
site location is adjusted against the short-fall in the tall
building under consideration
 This off-site creation should be viewed as equivalent to
having created an on-site solution.
 The Renewable Energy points would thus be gained by the
building proponent at the current location
 This would ensure that a Tall Building does not lose upto
9% under GRIHA or upto 4.35% due to constraints
imposed by a Tall Building
POSSIBLE SOLUTIONS (2/2)
Living in harmony with Nature
Living in harmony with Nature
 SHIKSHAN KENDRA FOR ADIVASIS :
 Shikshan Kendra, in the heart of the tribal villages of
Dahanu District, promotes children education and provides
day care center for young toddlers from 0-4 years.
 The centre also provides pre-primary education to children
from nearby villages.
 A teachers training program, is also being conducted here,
for whom a residential hostel with a mess is provided.
 Other self sustaining and revenue generation activities like
printing press, screen printing, painting programs, farming
and many others are conducted here.
 Major problem is frequent electricity outages for 6-8 hours
a day during summer. Thus the inmates of this campus of
deprived of electricity to study and carry the activities
CASE STUDY : OFF-SITE ADJUSTMENT
Living in harmony with Nature
CASE STUDY : OFF-SITE ADJUSTMENT
Living in harmony with Nature
 ELECTRICAL LOADS FOR SHIKSHAN KENDRA FOR ADIVASIS :
CASE STUDY : OFF-SITE ADJUSTMENT
Living in harmony with Nature
 HOT WATER REQUIREMENTS FOR SHIKSHAN KENDRA :
CASE STUDY : OFF-SITE ADJUSTMENT
Sr No Description Hot Water
(Litres/day)
1 Domestic Use 5,000
2 Kitchen 1,500
3 Laundry 1,000
TOTAL 7,500
Living in harmony with Nature
 RENEWABLE ENERGY REQUIREMENT AT SHIKSHAN KENDRA :
CASE STUDY : OFF-SITE ADJUSTMENT
Sr No Description Renewable
Energy
1 Solar Photovoltaic System 100 KW
2 Solar Water Heater 10,000 litrres
By installing the above Renewable Energy solutions at the off-site
location, the Building proponent would be able to :
 Meet the GRIHA Mandatory requirement
 Get additional 6 points under GRIHA Criteria 6, 18 & 19
 OR Get additional 2 points under LEED EA Credit – 2
 OR Get additional 4 points under IGBC Green Homes
Credit 4.0 and Credit 6.0
Living in harmony with Nature
Living in harmony with Nature
 ALLOW CREATION OF OFF-SITE RENEWABLE ENERGY SOLUTIONS
TO OFFSET RENEWABLE ENERGY REQUIREMENT OF TALL URBAN
BUILDINGS :
 By Village electrification.
 By Providing electrification to urban and semi-urban centres,
suffering from frequent power outages.
 By Creating Renewable Solutions in townships.
 Through Creation of Solar or Wind Installations to upload
Renewable Energy to the Grid.
NEED TO REVIEW GREEN RATINGS FOR RENEWABLE ENERGY
Living in harmony with Nature
Tejwant Navalkar : +91-9821411436
tmndfx@dfxsystems.org
Contact Details
DFX Systems Pvt Ltd
Engineering & Renewable Energy Solutions
Your Partner
in
Designing For eXcellence
www.dfxsystems.org
Living in harmony with Nature

More Related Content

What's hot

Innovative thermal energy storage technologies (Vincent O'Brien)
Innovative thermal energy storage technologies (Vincent O'Brien)Innovative thermal energy storage technologies (Vincent O'Brien)
Innovative thermal energy storage technologies (Vincent O'Brien)campone
 
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...GBC Finland
 
Indira Paryavaran Bhawan-Net Zero building
Indira Paryavaran Bhawan-Net Zero buildingIndira Paryavaran Bhawan-Net Zero building
Indira Paryavaran Bhawan-Net Zero buildingShailja km
 
Turbo energy limited (active india)
Turbo energy limited (active india)Turbo energy limited (active india)
Turbo energy limited (active india)Mudra Redkar
 
Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawanShamitha Reddy
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
Energy Conservation Building Code ECBC
Energy Conservation Building Code ECBCEnergy Conservation Building Code ECBC
Energy Conservation Building Code ECBCAmar Relan
 
Development of a thermal energy storage system in a domestic environment into...
Development of a thermal energy storage system in a domestic environment into...Development of a thermal energy storage system in a domestic environment into...
Development of a thermal energy storage system in a domestic environment into...Nelson García Polanco
 
London Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
London Hydrogen Partnership Stationary Hydrogen and FuelCell ShowcaseLondon Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
London Hydrogen Partnership Stationary Hydrogen and FuelCell ShowcaseRebecca Markillie
 
Architectural design
Architectural designArchitectural design
Architectural designSunita Sinha
 
Geothermal energy in mining
Geothermal energy in miningGeothermal energy in mining
Geothermal energy in miningMartin Preene
 
Indira paryavaran bhawan-Photo Essay on the green initiatives taken
Indira paryavaran bhawan-Photo Essay on the green initiatives taken Indira paryavaran bhawan-Photo Essay on the green initiatives taken
Indira paryavaran bhawan-Photo Essay on the green initiatives taken GRIHA India
 
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Farming Futures
 
One Planet Reno Presentation
One Planet Reno PresentationOne Planet Reno Presentation
One Planet Reno PresentationEmma Blakely
 
Green building - Introduction & general ideas
Green building - Introduction & general ideasGreen building - Introduction & general ideas
Green building - Introduction & general ideasSanjay Kashyap
 
Power Solar Options General
Power  Solar Options GeneralPower  Solar Options General
Power Solar Options GeneralFrans Romeijn
 
Phase Changing Material Introduction with Medical application
Phase Changing Material Introduction with Medical applicationPhase Changing Material Introduction with Medical application
Phase Changing Material Introduction with Medical applicationSharathmira Sathya
 
Solar water heating integrated with PCM as thermal
Solar water heating integrated with PCM as thermalSolar water heating integrated with PCM as thermal
Solar water heating integrated with PCM as thermalMohammed Hamza, M.Eng.
 

What's hot (20)

Innovative thermal energy storage technologies (Vincent O'Brien)
Innovative thermal energy storage technologies (Vincent O'Brien)Innovative thermal energy storage technologies (Vincent O'Brien)
Innovative thermal energy storage technologies (Vincent O'Brien)
 
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
 
Indira Paryavaran Bhawan-Net Zero building
Indira Paryavaran Bhawan-Net Zero buildingIndira Paryavaran Bhawan-Net Zero building
Indira Paryavaran Bhawan-Net Zero building
 
Turbo energy limited (active india)
Turbo energy limited (active india)Turbo energy limited (active india)
Turbo energy limited (active india)
 
Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawan
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
Energy Conservation Building Code ECBC
Energy Conservation Building Code ECBCEnergy Conservation Building Code ECBC
Energy Conservation Building Code ECBC
 
Development of a thermal energy storage system in a domestic environment into...
Development of a thermal energy storage system in a domestic environment into...Development of a thermal energy storage system in a domestic environment into...
Development of a thermal energy storage system in a domestic environment into...
 
London Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
London Hydrogen Partnership Stationary Hydrogen and FuelCell ShowcaseLondon Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
London Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
 
Architectural design
Architectural designArchitectural design
Architectural design
 
Geothermal energy in mining
Geothermal energy in miningGeothermal energy in mining
Geothermal energy in mining
 
Indira paryavaran bhawan-Photo Essay on the green initiatives taken
Indira paryavaran bhawan-Photo Essay on the green initiatives taken Indira paryavaran bhawan-Photo Essay on the green initiatives taken
Indira paryavaran bhawan-Photo Essay on the green initiatives taken
 
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
 
One Planet Reno Presentation
One Planet Reno PresentationOne Planet Reno Presentation
One Planet Reno Presentation
 
Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 
Green building - Introduction & general ideas
Green building - Introduction & general ideasGreen building - Introduction & general ideas
Green building - Introduction & general ideas
 
Power Solar Options General
Power  Solar Options GeneralPower  Solar Options General
Power Solar Options General
 
Phase Changing Material Introduction with Medical application
Phase Changing Material Introduction with Medical applicationPhase Changing Material Introduction with Medical application
Phase Changing Material Introduction with Medical application
 
ESCO and Thermal Energy Storage for DSM in Korea
ESCO and Thermal Energy Storage for DSM in KoreaESCO and Thermal Energy Storage for DSM in Korea
ESCO and Thermal Energy Storage for DSM in Korea
 
Solar water heating integrated with PCM as thermal
Solar water heating integrated with PCM as thermalSolar water heating integrated with PCM as thermal
Solar water heating integrated with PCM as thermal
 

Viewers also liked

LIZZAT PAPAD CASE STUDY
LIZZAT PAPAD CASE STUDYLIZZAT PAPAD CASE STUDY
LIZZAT PAPAD CASE STUDYSampada Nale
 
American institute of indian studies. Lighting.
American institute of indian studies. Lighting.American institute of indian studies. Lighting.
American institute of indian studies. Lighting.sanjaydeovrat
 
Griha 5 star rated project
Griha 5 star rated projectGriha 5 star rated project
Griha 5 star rated projectGRIHA India
 
Suzlon one earth
Suzlon one earthSuzlon one earth
Suzlon one earthVineet Rs
 
Suzlon One Earth- Green Building
Suzlon One Earth- Green BuildingSuzlon One Earth- Green Building
Suzlon One Earth- Green BuildingGRIHA India
 
Infosys Hyderabad
Infosys HyderabadInfosys Hyderabad
Infosys HyderabadGRIHA India
 
Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Mayank Aggarwal
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaAnchal Garg
 
GMR Hyderabad International Airport
GMR Hyderabad International AirportGMR Hyderabad International Airport
GMR Hyderabad International AirportBiplab Mukherjee
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteTechGigDotCom
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGgatti Teja
 
A Framework for campus planning - Case Study - India
A  Framework  for  campus  planning - Case Study - IndiaA  Framework  for  campus  planning - Case Study - India
A Framework for campus planning - Case Study - IndiaShubh Cheema
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 

Viewers also liked (17)

Learning
LearningLearning
Learning
 
LIZZAT PAPAD CASE STUDY
LIZZAT PAPAD CASE STUDYLIZZAT PAPAD CASE STUDY
LIZZAT PAPAD CASE STUDY
 
American institute of indian studies. Lighting.
American institute of indian studies. Lighting.American institute of indian studies. Lighting.
American institute of indian studies. Lighting.
 
Griha 5 star rated project
Griha 5 star rated projectGriha 5 star rated project
Griha 5 star rated project
 
Cwg 2010
Cwg 2010Cwg 2010
Cwg 2010
 
Suzlon one earth
Suzlon one earthSuzlon one earth
Suzlon one earth
 
Suzlon Energy
Suzlon EnergySuzlon Energy
Suzlon Energy
 
Suzlon One Earth- Green Building
Suzlon One Earth- Green BuildingSuzlon One Earth- Green Building
Suzlon One Earth- Green Building
 
Infosys Hyderabad
Infosys HyderabadInfosys Hyderabad
Infosys Hyderabad
 
Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and griha
 
Suzlon ppt
Suzlon pptSuzlon ppt
Suzlon ppt
 
GMR Hyderabad International Airport
GMR Hyderabad International AirportGMR Hyderabad International Airport
GMR Hyderabad International Airport
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya Gumaste
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
A Framework for campus planning - Case Study - India
A  Framework  for  campus  planning - Case Study - IndiaA  Framework  for  campus  planning - Case Study - India
A Framework for campus planning - Case Study - India
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 

Similar to Challenges implementing Green Initiatives in Tall Buildings

Green building Renewable energy Utilization
Green building Renewable energy UtilizationGreen building Renewable energy Utilization
Green building Renewable energy UtilizationPrakashKanuri1
 
Rebuilding Greensburg to be a Zero Energy City
Rebuilding Greensburg to be a Zero Energy CityRebuilding Greensburg to be a Zero Energy City
Rebuilding Greensburg to be a Zero Energy CityShanti Pless
 
Minneapolis Passive House and Zero Energy Ready Home Report Presentation
Minneapolis Passive House and Zero Energy Ready Home Report PresentationMinneapolis Passive House and Zero Energy Ready Home Report Presentation
Minneapolis Passive House and Zero Energy Ready Home Report PresentationTE Studio
 
Green Buildings
Green BuildingsGreen Buildings
Green BuildingsYamini K
 
Resource conserving architecture strategies for existing school
Resource conserving architecture   strategies for existing schoolResource conserving architecture   strategies for existing school
Resource conserving architecture strategies for existing schoolSoumitra Smart
 
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Rod Yeoh
 
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Lauren-Lee Camp
 
Green buildings and Renewable energy
Green buildings and Renewable energyGreen buildings and Renewable energy
Green buildings and Renewable energyron55456545
 
Energy efficient building
Energy efficient building Energy efficient building
Energy efficient building Aishu Sathi
 
Green Campus Conference 4-19-2011 R. Gagne
Green Campus Conference 4-19-2011 R. GagneGreen Campus Conference 4-19-2011 R. Gagne
Green Campus Conference 4-19-2011 R. GagneRob Gagne
 
Green apartment building
Green apartment buildingGreen apartment building
Green apartment buildingElo DURAND
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy buildingDr K M SONI
 
March3 2009-workshop-slides
March3 2009-workshop-slidesMarch3 2009-workshop-slides
March3 2009-workshop-slidesSWITCHOntario
 
Stoney River Energy Analysis
Stoney River Energy AnalysisStoney River Energy Analysis
Stoney River Energy Analysisscottthorpe
 
Benefits of green buildings
Benefits of green buildingsBenefits of green buildings
Benefits of green buildingsKarthik Shapur
 
Green building
Green buildingGreen building
Green buildingVivek Mvk
 
Ccr sustainable building technologies draft 7.3.10
Ccr sustainable building technologies draft 7.3.10Ccr sustainable building technologies draft 7.3.10
Ccr sustainable building technologies draft 7.3.10Kim Mitchell
 
Kuching | Jan-15 | Socio-economy Impact Of Access To Energy In Remote Community
Kuching | Jan-15 | Socio-economy Impact Of Access To Energy In Remote CommunityKuching | Jan-15 | Socio-economy Impact Of Access To Energy In Remote Community
Kuching | Jan-15 | Socio-economy Impact Of Access To Energy In Remote CommunitySmart Villages
 
Phoenix Hope VI And Green Building Presentation
Phoenix   Hope VI And Green Building PresentationPhoenix   Hope VI And Green Building Presentation
Phoenix Hope VI And Green Building PresentationICF_HCD
 

Similar to Challenges implementing Green Initiatives in Tall Buildings (20)

Green building Renewable energy Utilization
Green building Renewable energy UtilizationGreen building Renewable energy Utilization
Green building Renewable energy Utilization
 
Rebuilding Greensburg to be a Zero Energy City
Rebuilding Greensburg to be a Zero Energy CityRebuilding Greensburg to be a Zero Energy City
Rebuilding Greensburg to be a Zero Energy City
 
Minneapolis Passive House and Zero Energy Ready Home Report Presentation
Minneapolis Passive House and Zero Energy Ready Home Report PresentationMinneapolis Passive House and Zero Energy Ready Home Report Presentation
Minneapolis Passive House and Zero Energy Ready Home Report Presentation
 
Green Buildings
Green BuildingsGreen Buildings
Green Buildings
 
Resource conserving architecture strategies for existing school
Resource conserving architecture   strategies for existing schoolResource conserving architecture   strategies for existing school
Resource conserving architecture strategies for existing school
 
IGBC
IGBCIGBC
IGBC
 
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
 
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
 
Green buildings and Renewable energy
Green buildings and Renewable energyGreen buildings and Renewable energy
Green buildings and Renewable energy
 
Energy efficient building
Energy efficient building Energy efficient building
Energy efficient building
 
Green Campus Conference 4-19-2011 R. Gagne
Green Campus Conference 4-19-2011 R. GagneGreen Campus Conference 4-19-2011 R. Gagne
Green Campus Conference 4-19-2011 R. Gagne
 
Green apartment building
Green apartment buildingGreen apartment building
Green apartment building
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
 
March3 2009-workshop-slides
March3 2009-workshop-slidesMarch3 2009-workshop-slides
March3 2009-workshop-slides
 
Stoney River Energy Analysis
Stoney River Energy AnalysisStoney River Energy Analysis
Stoney River Energy Analysis
 
Benefits of green buildings
Benefits of green buildingsBenefits of green buildings
Benefits of green buildings
 
Green building
Green buildingGreen building
Green building
 
Ccr sustainable building technologies draft 7.3.10
Ccr sustainable building technologies draft 7.3.10Ccr sustainable building technologies draft 7.3.10
Ccr sustainable building technologies draft 7.3.10
 
Kuching | Jan-15 | Socio-economy Impact Of Access To Energy In Remote Community
Kuching | Jan-15 | Socio-economy Impact Of Access To Energy In Remote CommunityKuching | Jan-15 | Socio-economy Impact Of Access To Energy In Remote Community
Kuching | Jan-15 | Socio-economy Impact Of Access To Energy In Remote Community
 
Phoenix Hope VI And Green Building Presentation
Phoenix   Hope VI And Green Building PresentationPhoenix   Hope VI And Green Building Presentation
Phoenix Hope VI And Green Building Presentation
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 

Challenges implementing Green Initiatives in Tall Buildings

  • 1. Living in harmony with Nature Challenges in implementing Renewable Energy in Tall Buildings June, 2016 Tejwant Navalkar
  • 2. Living in harmony with Nature  RENEWABLE ENERGY – AN INTRODUCTION  GRIHA RENEWABLE ENERGY REQUIREMENTS  LEED – NC RENEWABLE REQUIREMENTS  IGBC – GREEN HOMES REQUIREMENTS  CASE STUDY – A 240.7m tall Building • Building Features • Solar Hot Water Schematic • Solar PV Requirements • Challenges in implementing Renewable Energy  POSSIBLE SOLUTION  CASE STUDY for IMPLEMENTING THE SOLUTION  NEED TO REVIEW THE GREEN RATING APPROACH AGENDA
  • 3. Living in harmony with Nature  SOLAR PHOTOVOLTAIC (PV) SYSTEMS  SOLAR THERMAL SOLUTIONS  WIND TURBINE  BIO-GAS FOR COOKING & ELECTRICITY GENERATIONC RENEWABLE ENERGY : An Introduction
  • 4. Living in harmony with Nature
  • 5. Living in harmony with Nature  CRITERIA – 6 (Outdoor Lighting) - 1 point  Minimum 25% of total outdoor lighting fixtures or 15% of total connected load, whichever is higher, has to be provided with solar lighting  CRITERIA – 18 (Renewable Energy Utilization) - Max 5 points  Rated capacity of Renewable Energy system should be minimum 1% of internal lighting and space conditioning connected loads in the building (MANDATORY)  Rated capacity of Renewable Energy system meets annual energy requirements from 5% upto 30% of internal lighting connected load (Upto 4 points) GRIHA : RENEWABLE ENEGY REQUIRMENTS
  • 6. Living in harmony with Nature  CRITERIA – 19 (Renewable Energy based Hot Water Generation) - Max 3 point  Annual energy saved by Renewable Energy system is 20% to 50% of annual energy required for water heating to meet the hot water requirement of the building. (1 point)  Annual energy saved by Renewable Energy system is 50% to 70% of annual energy required for water heating to meet the hot water requirement of the building. (1 point)  Annual energy saved by Renewable Energy system is above 70% of annual energy required for water heating to meet the hot water requirement of the building. (1 point) GRIHA : RENEWABLE ENEGY REQUIRMENTS
  • 7. Living in harmony with Nature  TOTAL POINTS FOR RENEWABLE ENERGY GRIHA : RENEWABLE ENERGY REQUIRMENTS Criteria Description Max points Criteria – 6 Outdoor Lighting 1 Criteria – 18 Mandatory Renewable Energy Usage 1 Criteria – 18 Optional Renewable Energy Usage 4 Criteria – 19 Renewable Energy based Hot Water generation 3 TOTAL 9 This accounts for about 9% of the total 104 points for GRIHA
  • 8. Living in harmony with Nature GRIHA : RATING SYSTEM Points Scored Rating 50 - 60 1 star (*) 61 - 70 2 stars (**) 71 - 80 3 stars (***) 81 - 90 4 stars (****) 91 - 100 5 stars (*****)
  • 9. Living in harmony with Nature
  • 10. Living in harmony with Nature LEED – NC : RENEWABLE ENERGY REQUIREMENTS  EA CREDIT – 2 (Renewable Energy Usage) - Max 3 point  Supply minimum 2.5% of the building’s total energy use through use of on-site renewable energy systems. (1 point)  Supply between 2.5% & 5% of the building’s total energy through use of on-site renewable energy systems.. (1 point)  Supply between 5% & 7.5% of the building’s total energy through the use of on-site renewable energy systems.. (1 point)
  • 11. Living in harmony with Nature LEED : RATING SYSTEM Points Scored Rating 26-32 Certified 33-38 Silver 39-51 Gold 52-69 Platinum Certified 26-32 points, Silver 33-38 points, Gold 39-51 points, Platinum 52-69 points Renewable Energy accounts for about 4.5% of the total 69 points for LEED
  • 12. Living in harmony with Nature
  • 13. Living in harmony with Nature IGBC – GREEN HOMES : RENEWABLE ENERGY REQUIREMENTS  ENERGY CREDIT – 4 (Solar Water Heater) - Max 3 point  Provide solar water heating system to satisfy hot water requirement for domestic purposes.  The minimum hot water requirement for domestic purposes should be calculated for 25 litres per person per day.  Points are awarded as below: Hot water through Solar Water Heater as a percentage of the total Hot water requirements Points  50% 1  75% 2  95% 3
  • 14. Living in harmony with Nature IGBC – GREEN HOMES : RENEWABLE ENERGY REQUIREMENTS  ENERGY CREDIT – 6.0 (On-Site Renewable Energy) Max 4 points  Install renewable energy systems for atleast 2.5% of annual consumption of the building.  Points are awarded as below: Renewable Energy as a percentage of the total annual consumption Points  2.5 % 1  5.0 % 2  7.5 % 3  10.0 % 4
  • 15. Living in harmony with Nature
  • 16. Living in harmony with Nature CASE STUDY – 200.47m Tall Building The Proposed Residential Project is spread over 365,735 sq.ft of land and is located Central Mumbai. The Project has the following features:  G + Podium floor(5nos) + atrium + 59floors with 2BHK, 3BHK and 4BHK flats and 5BHK (Penthouses)  Sale Building having height of approximately 240.7m
  • 17. Living in harmony with Nature CASE STUDY – 200m Tall Building  BASIC PROJECT DATA :  Built-up Area : Approximately 44,700 sqm  Terrace Area : About 400 sqm in two levels  Total Flats : 148 (Mix of 2BHK, 3BHK, 4BHK & Penthouses)  Expected occupancy : 1100  Total Water Requirements : 140,000 litres/day  Hot Water Requirements : 55,000 litres/ day  Building Lighting & Conditioning Connected Load : 3,800KW  Internal Lighting Connected Load : 2018KW  Total Outdoor & Façade Lighting : 60KW
  • 18. Living in harmony with Nature CASE STUDY – 200m Tall Building  GRIHA RENEWABLE ENERGY REQUIRMENTS for the BUILDING : Criteria Description Renewable Energy Required Criteria – 6 Outdoor Lighting 10 KW Criteria – 18 Mandatory Renewable Energy Usage 38 KW Criteria – 18 Optional Renewable Energy Usage 60 KW Criteria – 19 Renewable Energy based Hot Water generation 55,000 Litres Solar Heater
  • 19. Living in harmony with Nature CASE STUDY – 200m Tall Building  LEED-NC RENEWABLE ENERGY REQUIRMENTS for the BUILDING : Criteria Description Renewable Energy Required EA CREDIT – 2 2.5% of Maximum Demand 50 KW EA CREDIT – 2 5% of Maximum Demand 100 KW EA CREDIT – 2 7.5% of Maximum Demand 150 KW Internal Lighting Connected Load : 2018KW
  • 20. Living in harmony with Nature CASE STUDY – 200m Tall Building  IGBC GREEN HOMES RENEWABLE ENERGY REQUIRMENTS for the BUILDING : Criteria Description Renewable Energy Required Energy Credit – 4.0 Use of Solar Water heater 55,000 solar heater Energy Credit 6.0 10% of Maximum Demand 200 KW
  • 21. Living in harmony with Nature CASE STUDY – 200m Tall Building  CONSTRAINTS IN IMPLEMENTING RENEWABLE ENERGY :  Limited Terrace Area (400sqm in two levels) • This can accommodate 7,000 litres solar heater OR • This can accommodate 20 KW Solar PV Panels (Mandatory requirement for GRIHA itself is 38KW)  Tall building casts shadow on solar panels if mounted at the podium level  Intermediate Break pressure Hot water tanks required to be installed at each of the fire break floors  Circulating pumps required between solar heater and the intermediate hot water tanks  Re-Circulating pumps required for each hot water tank to ensure instant hot water at the tap
  • 22. Living in harmony with Nature CASE STUDY – 200.47m Tall Building  CONSTRAINTS IN IMPLEMENTING RENEWABLE ENERGY :  With multiple toilet shafts for each flat, measurement of hot water consumption not practicable  Solar Lighting system shaded by shadow cast by the Tall building  Close density of trees required as per Green Rating system, these cast shadow on solar street lights  Long cable lengths from the Terrace to the main LT distribution panel
  • 23. Living in harmony with Nature
  • 24. Living in harmony with Nature  POSSIBLE SOLUTIONS IN IMPLEMENTING RENEWABLE ENERGY in TALL BUILDINGS :  Provide covered shades fitted with Solar PV modules over Swimming Pools  Use of Integrated Building PV modules on vertical faces of the Building. POSSIBLE SOLUTIONS (1/2)
  • 25. Living in harmony with Nature  ALLOW CREATION OF OFF-SITE RENEWABLE SOLUTIONS :  The building proponent creates Renewable Energy facilities at an off-site location.  The extent of Renewable Energy usage created in the off- site location is adjusted against the short-fall in the tall building under consideration  This off-site creation should be viewed as equivalent to having created an on-site solution.  The Renewable Energy points would thus be gained by the building proponent at the current location  This would ensure that a Tall Building does not lose upto 9% under GRIHA or upto 4.35% due to constraints imposed by a Tall Building POSSIBLE SOLUTIONS (2/2)
  • 26. Living in harmony with Nature
  • 27. Living in harmony with Nature  SHIKSHAN KENDRA FOR ADIVASIS :  Shikshan Kendra, in the heart of the tribal villages of Dahanu District, promotes children education and provides day care center for young toddlers from 0-4 years.  The centre also provides pre-primary education to children from nearby villages.  A teachers training program, is also being conducted here, for whom a residential hostel with a mess is provided.  Other self sustaining and revenue generation activities like printing press, screen printing, painting programs, farming and many others are conducted here.  Major problem is frequent electricity outages for 6-8 hours a day during summer. Thus the inmates of this campus of deprived of electricity to study and carry the activities CASE STUDY : OFF-SITE ADJUSTMENT
  • 28. Living in harmony with Nature CASE STUDY : OFF-SITE ADJUSTMENT
  • 29. Living in harmony with Nature  ELECTRICAL LOADS FOR SHIKSHAN KENDRA FOR ADIVASIS : CASE STUDY : OFF-SITE ADJUSTMENT
  • 30. Living in harmony with Nature  HOT WATER REQUIREMENTS FOR SHIKSHAN KENDRA : CASE STUDY : OFF-SITE ADJUSTMENT Sr No Description Hot Water (Litres/day) 1 Domestic Use 5,000 2 Kitchen 1,500 3 Laundry 1,000 TOTAL 7,500
  • 31. Living in harmony with Nature  RENEWABLE ENERGY REQUIREMENT AT SHIKSHAN KENDRA : CASE STUDY : OFF-SITE ADJUSTMENT Sr No Description Renewable Energy 1 Solar Photovoltaic System 100 KW 2 Solar Water Heater 10,000 litrres By installing the above Renewable Energy solutions at the off-site location, the Building proponent would be able to :  Meet the GRIHA Mandatory requirement  Get additional 6 points under GRIHA Criteria 6, 18 & 19  OR Get additional 2 points under LEED EA Credit – 2  OR Get additional 4 points under IGBC Green Homes Credit 4.0 and Credit 6.0
  • 32. Living in harmony with Nature
  • 33. Living in harmony with Nature  ALLOW CREATION OF OFF-SITE RENEWABLE ENERGY SOLUTIONS TO OFFSET RENEWABLE ENERGY REQUIREMENT OF TALL URBAN BUILDINGS :  By Village electrification.  By Providing electrification to urban and semi-urban centres, suffering from frequent power outages.  By Creating Renewable Solutions in townships.  Through Creation of Solar or Wind Installations to upload Renewable Energy to the Grid. NEED TO REVIEW GREEN RATINGS FOR RENEWABLE ENERGY
  • 34. Living in harmony with Nature Tejwant Navalkar : +91-9821411436 tmndfx@dfxsystems.org Contact Details DFX Systems Pvt Ltd Engineering & Renewable Energy Solutions Your Partner in Designing For eXcellence www.dfxsystems.org
  • 35. Living in harmony with Nature