Your SlideShare is downloading. ×
Final Fiesta Checklist
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Final Fiesta Checklist

697
views

Published on

Published in: Sports, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
697
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
33
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. OBM Presentation ChecklistInstructions: You are required to turn this in with the final draft of this project and give it to your TA prior to starting your OBMPowerPoint presentation. DO NOT staple it to your project. Make sure the following items are placed in your paper. Check eachitem off. Then sign at the bottom of the page.On the day of the Final Fiesta, you are required to turn in a disk. This disk must contain electroniccopies of your: Final Fiesta paper Final Fiesta Presentation SM paper SM presentation Graph of data for the SM project SM performance contract.Points will be deducted from your Final Fiesta Grade if you fail to turn in this disk. Requirements Student TA Points Initials Check earned verifying off 50 pts completion possible Each of the requirements from the Title Slide through the Question Slide MUST be included Title Slide (2pt) Setting and Participant Description (real or hypothetical??) (4pt) Reason To Intervene (4pt) Analyze Natural Contingencies applied to your project & (5pt) Ineffective & Natural Competing Contingencies Baseline graph included (2) Specify Performance Objectives applied to your project (5pt) Design Intervention applied to your project & contingency (5pt) diagram Implement Intervention applied to your project (5pt) Evaluate Intervention applied to your project & graphs of (5pt) your data Recycle applied to your project (either real or (5pt) hypothetical). Recycle graph included Graph with recycle phase provided (2) Question Slide (2pt) TOTAL: /50 pts. Bonus Points For the Following: Choose & Insert some of the following: Clip Art Pictures of your site Charts, diagrams, job aids that were used during the intervention (1pt per) Music
  • 2. OBM Paper ChecklistInstructions: You are required to turn this in with your first and final drafts of this paper. It should be placed after your cover page.Make sure the following items are placed in your paper. Check each item off. Then sign at the bottom of the page.On the day of the Final Fiesta, you are required to turn in a disk. This disk must contain electroniccopies of your: Final Fiesta paper Final Fiesta Presentation SM paper SM presentation Graph of data for the SM project SM performance contractPoints will be deducted from your Final Fiesta Grade if you fail to turn in this disk. Required Items Student TA Points earned Initials Check verifying off completion The cover page through the Graph of data must Diagrams Full 1st Final draft be included to receive an “A.” Draft draft 100points 20 points 20 points Cover Page (1pt) (1pt) (2pt) Paper Checklist (2pt) (2pt) (3pt) Project Introduction: Site/Problem/Intervention (1pt) (10pt) Overview - real or hypothetical??? 8 terms from Chapter 12 (check the chapter to see which (3pt) (12pt) terms may or may not be included) defined, explained and applied to the paper Specify Performance Objectives (4pt) (2pt) (4pt) Cultural Change Model Diagram (3pt) (2pt) (4pt) Cultural Change Model Description (1pt) (3pt) 6 Steps of Behavior Systems Analysis (1pt) (30pt) Ineffective Natural Contingency Diagram (2pt) (1pt) (3pt) Ineffective Natural Contingency description (see section (1pt) (3pt) in this document) Natural Competing Contingency Diagram (2pt) (1pt) (5pt) Natural Competing Contingency description (see section (1pt) (3pt) in this document) Three Contingency Model of Performance Management (3pt) (1pt) (5pt) Diagram Three Contingency Model of Performance Management (1pt) (3pt) description Graph of your data: include baseline, intervention(s), (3pt) (1pt) (10pt) dotted phase change lines, dotted goal line Points Earned Points Possible 20 points 20 points 100 points Bonus Points For the Following: Clip Art Pictures of your site Charts, diagrams, job aids that were used during the intervention (1pt per)

×