Qingdao Jieneng Power Station Engineering Co., Ltd.
Upcoming SlideShare
Loading in...5
×
 

Qingdao Jieneng Power Station Engineering Co., Ltd.

on

  • 1,418 views

Company introduction of Qingdao Jieneng Power Station Engineering Co., Ltd.

Company introduction of Qingdao Jieneng Power Station Engineering Co., Ltd.

Statistics

Views

Total Views
1,418
Views on SlideShare
1,379
Embed Views
39

Actions

Likes
0
Downloads
20
Comments
0

1 Embed 39

http://www.linkedin.com 39

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Qingdao Jieneng Power Station Engineering Co., Ltd. Qingdao Jieneng Power Station Engineering Co., Ltd. Presentation Transcript

  • www.qdjpse.comCONTENTSABOUT JIENENGIBUSINESS SCOPEBUSINESS SCOPEIIOUTSTANDING ACHIEVEMENTSIII
  • www.qdjpse.comABOUT JIENENGI
  • www.qdjpse.comQingdao JienengSteam TurbineGroup Co., Ltd.(Holding Company)Qingdao Jieneng Electric Power Design Co., Ltd.Qingdao Jieneng Generating Equipment Co., Ltd.Qingdao Jieneng Mining Investment Co., Ltd.Qingdao Jihua Foundry Co., Ltd.Qingdao Jieneng Hi-tech Co., Ltd.Qingdao Jieneng Power Station Engineering Co., Ltd.JIENENG GROUPABOUT JIENENGQingdao Jieneng Real Estate Co., Ltd.
  • www.qdjpse.comABOUT JIENENG1999, Jieneng started power plant EPC contracting business.1950, Jieneng Group incorporated as a state-owned company.2009, Jieneng ccomplished engineering capability.2011, Jieneng Indonesia comapny established.2012, 2x30MW EPC project were contracted.HISTORYJieneng have achieved sales of more than5000 sets of steam turbines and more than50 EPC projects all over the world.2002, Jieneng transformed to share-holding company.
  • www.qdjpse.comABOUT JIENENGJIENENG ALL OVER THE WORLD
  • www.qdjpse.comABOUT JIENENG
  • www.qdjpse.comABOUT JIENENG
  • www.qdjpse.comABOUT JIENENGOrganizational Chart
  • www.qdjpse.comProjectManagerProjectControl Dept.ExecutionAdmin. Dept.Logistic &Procurement Dept.Subcontract Admin. ManagerCost ManagerSchedule Plan ManagerVariation Admin. MangerInformation Admin. MangerProcurement ManagerQC ManagerLogistic ManagerProject Safety Admin. ManagerProject QC ManagerDesign Liaison ManagerMaterial Admin. ManagerProject Execution ChartABOUT JIENENG
  • www.qdjpse.comABOUT JIENENGBUSINESS LICENSE
  • www.qdjpse.comQUALIFICATION CERTIFICATE FOR INTERNATIONALENGINEERINGBUSINESSABOUT JIENENG
  • www.qdjpse.comABOUT JIENENGOVERSEAS INVESTMENT CERTIFICATE
  • www.qdjpse.comABOUT JIENENGISO 9001 QUALITYMANAGEMENTSYSTEM CERTIFICATION
  • www.qdjpse.comBUSINESS SCOPEBUSINESS SCOPEII
  • www.qdjpse.comBUSINESS SCOPEMarketing and Sales ofJieneng Brand of SteamTurbines and Generatorsand AuxiliariesBUSINESSCOPEThermal Power Plant- Engineering- Procurement- Construction
  • www.qdjpse.comBUSINESS SCOPE1. Marketing and SalesJIENENG brand of Steam TurbinesUnit capacity under 200MWExtraction back pressure steam turbinesExtraction condensing steam turbinesBack pressure steam turbinesCondensing steam turbinesGeothermal power generation steam turbinesLow temperature waste heat recovery steam turbinesBiomass power generation steam turbinesIndustrial driving steam turbinesCustomized steam turbinesModularized steam turbines
  • www.qdjpse.comBUSINESS SCOPE2. Engineering & Consultancy Integrated plan and design of electric power system Field survey Standards and codes (GB, CE, DIN, ASME, etc.) Project management & supervision Mechanical & electrical design and installation supervision Environmental Impact Assessment Geotechnical engineeringJIENENG has own design engineering team!
  • www.qdjpse.comBUSINESS SCOPE- Complete Power Plant Equipment and materials BTG BOP Electrical parts C&I system Spare parts and special tools3. Equipment Procurement and Supply
  • www.qdjpse.comBUSINESS SCOPE4. ConstructionSupervision for power plant erectionTest and commissioningStaff and workers trainingCivil works
  • www.qdjpse.com5. After-sales Service Spare parts supplyRenovation & equipment retrofit Re-location of power plant Unit capacity upgradePerformance upgrade and energy saving proposal System upgrade (Instrumentation, energy efficient electrics, etc.) Special studies / Trouble shooting Operation and maintenance (professional training)BUSINESS SCOPE
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTSIII
  • www.qdjpse.comNO. DESCRIPTION SITE SCALE OWNER1 SML 5x6MW Power Plant Jhang, Pakistan 2xB6MW+3xC6MW TG SHAKARGANJ MILLS LTD2 Tifico 2x15MW Power Plant Tangarang, Indonesia 2x75T/H Boiler + 2x15MW TG Tenjin Group3 DSS 1x30MW Power Plant Karawang, Indonesia 1x240T/H Boiler + 1x30MW TG Sinar Mas Group4 DDS 2.5MW Geothermal Power Plant Mataloko, Indonesia 1x2.5MW TG PLN, Indonesia5 Tambang 1x10MW Power Plant Tambang, Indonesia 1x50T/H Boiler + 1x10MW TG Bayan, Indonesia6 PDSU 1x15MW Power Plant Ciregeng, Indonesia 1x15MW TG PT. Permata Dunia Sukses Utama7 Batam 1x6MW Power Plant Batam, Indonesia 1x6MW TG Custom Craft (M) Sdn Bhd8 Bell Group 1x11MW Power Plant Batu Bahat, Malaysia 1x11MW TG BELL GROUP9 Kawasaki 1x10MW Power Plant Turkey 1x10MW TG Cimsa Cement Mill10 Kardemir 1x15MW Power Plant Turkey 1x15MW TG Kardemir Steel Mill11 Atambua 4x7MW Power Plant Atambua, Indonesia 4x35T/H Boiler + 4x7MW TG PLN, Indonesia12 West Kalimantan 2x50MW Power Plant (1st) Pontianak, Indonesia 2x240T/H Boiler + 2x50MW TG PLN, Indonesia13 Spectrum 1x55MW Power Plant Korba, India 1x230T/H Boiler + 1x55MW TG Spectrum Coal & Power Limited Co.14 Ulumbu 2x2.5MW Geothermal Power Plant Ulumbu, Indonesia 2x2.5MW TG PLN, Indonesia15 ICA 2x12MW Power Plant Pontianak, Indonesia 2x75T/H Boiler + 2x12MW TG ICA Consortium16 West Kalimantan 2x50MW Power Plant (2nd) Pontianak, Indonesia 2x240T/H Boiler + 2x50MW TG PLN, Indonesia17 Kuala Pambuang 2x3.5MW Power Plant Sampit, Indonesia 2x20T/H Boiler+ 2x3.5MW TG PLN, Indonesia18 SWPI 1x6MW Power Plant Papua, Indonesia 1x40T/H Boiler + 1x6MW TG PT. Sinar Wijaya Plywood Industries19 Indonesia TEBO 2x7MW Power Plant TEBO, Indonesia 2x40T/H Boiler + 2x7MW TG PLN, Indonesia20 Indonesia CTI 2x30MW Power Plant Bangka Belitung Indonesia 2x130T/H Boiler + 2x30MW TG PLN, IndonesiaOUTSTANDING ACHIEVEMENTSEPC Projects in International Market
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTSEPC Projects in Chinese MarketNo. Model Owner1 N12-3.4390 Tiande Chemical Holdings Limited2 C12-3.43/1.27 Shandong Shouguang Juneng Special Steel3 C6-3.43/0.490 Xinjiang Lvyuan Sugar Refinery4 C12-3.43/0.785 Shandong Hengyang Thermal Power Plant5 C15-3.43/0.49 Qingdao Hanhe Cable6 C12-3.43/0.49 Harbin Bin County Thermal Power Plant7 N12-3.43 Heilongjiang Fuyuan Thermal Power Plant8 N15-3.43 Luli Group9 C12-3.43/0.49 Zibo Tieyuan Group10 C6-3.43/0.294 Henan Lingbao Biomass Project11 N15-3.43 Jofo Group12 B3-3.43/0.785 Henan Prosper Skins & Leather Enterprise13 C12-3.43/0.981 Qingdao Jingu Thermal Power Plant14 B15-8.83/3.83 Jiangsu Sunshine Group15 B15-3.43/0.981 Jiangsu Sunshine Group16 C15-3.43/0.981 Jiangsu Sunshine Group
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTS1. TIFICO 2X15MW POWER PLANT ---- INDONESIA
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTSOwner PT.Teijing Indonesia Fiber TbkSite Tangerang IndonesiaCapacity2X75T/H CFB boiler +2x15MW condensingturbo-generator Power PlantScope EPCPeriod 2004.4-2006.5RemarkSince the power plant was put into commercialoperation in March, 2006, it is in a good conditionup to now.TIFICO 2X15MW INTRODUCTION
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTSPOWER PLANT BIRD VIEWSTG HALL
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTSBIRD VIEW COAL CONVEYORCONTROL ROOM POWER DISTRIBUTION
  • www.qdjpse.com2. SINAR MAS DSS 1X30MW POWER PLANT---- INDONESIAOUTSTANDING ACHIEVEMENTS
  • www.qdjpse.comOwner PT.Dian Swastatilen Sentosa(DSS)Site Karawang IndonesiaCapacity1x220T/H CFB boiler+1x30MW extractioncondensing turbo-generator Power PlantScope EPCPeriod 2005.1-2007.4RemarksThe power plant has been in operation for 6years, and made a continuous operation record of10 months with CFB boiler.OUTSTANDING ACHIEVEMENTSSINAR MAS DSS 1X30MW INTRODUCTION
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTSBIRD VIEWBIRD VIEW
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTS240TPH CFB BOILERSTGESP
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTSCONTROL ROOM POWER DISTRIBUTIONDM WATER STATION RO SYSTEM
  • www.qdjpse.com3. TABANG1X10MW PROJECT---- INDONESIAOwner AE AUTOMOTION (M) SDN BHDSite Kalimantan IndonesiaCapacity1x50T/HCFB boiler +1x10MW condensingturbo-generator Power PlantScope EPCPeriod 2007.6-2009.11RemarksThe Power Plant is built for the coalprocessing plant.OUTSTANDING ACHIEVEMENTS
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTSGENERAL VIEW OF THE POWER PLANTBIRD VIEW STG HALL
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTS4. MATALOKO 1X2.5MW GEOTHERMAL POWER PLANTOwner PT DUA DAYA SAKTISite Mataloko IndonesiaCapacity 1x2.5MW Geothermal Power PlantScope EPCPeriod 2005.6-2010.5RemarksIt is our first Geothermal Power PlantIn Indonesia. The Owner of thisproject is PT PLN(Persero).
  • www.qdjpse.comOUTSTANDING ACHIEVEMENTS5. INDIA MARKET More than 70 turbo generator were sold and installed in India,ranging from 3MW to 60MW, covering industries like powergeneration, steel mill, metallurgic plant, sugar refinery, papermill, etc.
  • www.qdjpse.comTel: +86-532-86127261Fax: +86-532-86127282Email: jnpower.tn@gmail.comWeb site: www.jnpower.comwww.qdjpse.comAddress: Manhattan Plaza,No.18B, ShandongRoad, Qingdao, China266071CONTRACT US