2010 Environment & Community Conference2010 Environment & Community Conference
S C lHSEC Legal
Compliance systemCompliance...
• Illawarra Coal operates three underground coal
mines two coal processing facilities logisticsmines, two coal processing ...
Defining our needs
• Our system to manage HSEC legal
HSEC COMPLIANCE REGISTER
CORDEAUX S.D. FIELD TEAM- LEGISLATION AND RE...
Understanding our Legal obligations
A f h di h E E lAs part of the discovery phase Environment Essentials was
engaged to p...
• Environment Essentials were engaged to help create plain English summaries
Developing our HSEC Obligation system
Environ...
Creating an HSEC Legal Compliance Register
Ti ki D d d id h l l• Tickit on Demand was engaged to provide the legal
complia...
Individual Obligation Owner Logon page
Reporting Function
Summary of IC Plain English Obligations managed in Tickit on Demand:
Health &Safety = 235 obligations 1...
IC f d i l id h ld ll d
Learnings
• IC found no single provider that could serve all needs.
• The project took 2 years to ...
• Illawarra Coal has created a HSEC legal Compliance System
• Personnel are able to understand their Legal Obligations.
• ...
Upcoming SlideShare
Loading in...5
×

Illawarra Coal HSEC Register Presentation

527

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
527
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Illawarra Coal HSEC Register Presentation"

  1. 1. 2010 Environment & Community Conference2010 Environment & Community Conference S C lHSEC Legal Compliance systemCompliance system Ray AitkenRay Aitken BHP Billiton Illawarra Coal
  2. 2. • Illawarra Coal operates three underground coal mines two coal processing facilities logisticsmines, two coal processing facilities, logistics and the Port Kembla Coal Terminal on behalf of a consortium of partners. • Our legislation, approvals, consent conditions and licences create multiple obligations and complexitycomplexity. • We created a Health Safety Environment & Community (HSEC) Legal Compliancey ( ) g p System to simplify the obligations for our people to manage.
  3. 3. Defining our needs • Our system to manage HSEC legal HSEC COMPLIANCE REGISTER CORDEAUX S.D. FIELD TEAM- LEGISLATION AND REGULATIONS (LEGAL AND OTHER REQUIREMENTS) described in the ‘Legal and Other Requirements’ section of the Environmental Field Operations HSEC Management Plan, most of the Field Team’s compliance requirements are outlined in: Subsidence Management Plan Approvals, Section 138 Approvals, or Related Environmental Management Plans. quirements from these Approvals and Management Plans are entered into a compliance spreadsheet which is used in planning monitoring activities, as well as for compliance measurement and re e Sustainable Development Environmental Field Team based at Cordeaux Mine operate under Illawarra Coal’s EMS and as such wider requirements are contained within the IC HSEC Complian rdeaux site based requirements as well as work sites located within the Sydney Catchment or other privately owned lands are managed by the Technical Services / Exploration Department • Our system to manage HSEC legal compliance required improvement. • We had a collection of spreadsheets. rdeaux site-based requirements as well as work sites located within the Sydney Catchment, or other privately owned lands are managed by the Technical Services / Exploration Department, mpliance is reported by that Department. EGAL DOCUMENT AGENCY BRIEF DESCRIPTION REPORTING REQUIREMENTS WHEN RESPONSIBI LITY LOCATION OF DOCUMENTS ASPECTS TO WHICH LEGAL AND OTHER APPLY ning Act 1992 SW) DPI Manages the process for preparation of SMP and adherence to its terms. As per line items below. Prepared prior to mine operations. BHP Billiton www.austlii.edu .au Environmental Field Team – relevant throu documents outlining environmental monit requirements. SMP West Cliff Colliery Area 5 LW31- 33, November 2005. (and associated Environmental Management Plan) Relevant for Georges River surface and ground water monitoring and physical changes to environmental features. Results used for reporting in End of Panel Reports, baseline reports and Annual Environmental Management Reports. Prior, during and post mining. Manager Environment http://dctmmel/w ebtop/drl/objectId /0b0170928032b 6f3 Hard copies at regional office Subsidence - water quality and flow – fracturi SMP Appin Colliery LW301A-302, September 2005. (and associated Environmental Management Plan) Relevant for Cataract River surface and ground water monitoring and physical changes to environmental features. Results used for reporting in End of Panel Reports, baseline reports and Annual Environmental Management Reports. Prior, during and post mining. Manager Environment http://dctmmel/w ebtop/drl/objectId /0b0170928032c 576 Hard copies at regional office Subsidence - water quality and flow – fracturi SMP Appin (West) Colliery First Relevant for Nepean River Prior, during Manager http://dctmmel/w Subsidence - water quality • A project team was formed to; Discover all applicable legislation, approvals, licences for all sites. pp ( ) y Workings LW701-704, April 2004. Douglas Area 7 Subsidence Monitoring and Consultation Program, September 2005. (and associated Environmental Management Plan) p surface water quality and physical changes to environmental features. Results used for reporting in End of Panel Reports, baseline reports and Annual Environmental Management Reports. , g and post mining. g Environment p ebtop/drl/objectId /0b0170928032c a9b Hard copies at regional office q y SMP Dendrobium Colliery Area 2 LW3-5, June 2006. Relevant for physical environmental changes, ground and surface water monitoring and swamp monitoring. Results used for reporting in End of Panel Reports, baseline reports and Annual Environmental Management Reports. Prior, during and post mining. Manager Environment http://dctmmel/w ebtop/drl/objectId /0b0170928031ef 0d Hard copies at regional office Subsidence - water quality – fracturing – swa HSEC COMPLIANCE REGISTER - ASPECTS ILLAWARRA COAL- LEGISLATION AND REGULATIONS (LEGAL AND OTHER REQUIREMENTS) LEGAL DOCUMENT AGENCY BRIEF DESCRIPTION REPORTING REQUIREMENTS WHEN RESPONSIBILITY LOCATION OF DOCUMENTS ASPECTS TO WHICH L REQUIREMENT Contaminated Land Management Act 1997 (Amending Act issued Outlines the process for regulating contaminated sites and describes the role of governing authorities (primarily In such case as land contamination exceeds thresholds and has/forseeably Site Function / Environment Managers CONTAMINATED LAND MANAGEMENT Identify the all HSEC obligations Identify the position holders responsible for each obligation, D i t t k l ti / (Amending Act issued 2008) role of governing authorities (primarily the EPA) thresholds and has/forseeably enter neighbouring land, the atmosphere, groundwater or surface water Managers MANAGEMENT REGULATION 2008 Contaminated Land Management Regulation 2008 DECC Outlines the rate at which the EPA may recover costs, additional material to be included in EPA records, the forms to be used and time at which statement of reasons must be provided. Site function / Environmental Managers CONTAMINATED LAND REGULATION 2008 Contaminated Land Managem Dams Safety Act 1978 (NSW) NSW Dams Safety Committee Government Statutory Authority, which has as one of its functions, the surveillance of mining within the Notification Area of any Prescribed Dam in NSW. Issues guideline sheets notably Nos 32, 33, 34 and 35 for Dendrobium. All developments near prescribed dams Dendrobium DAMS SAFETY ACT 1978 Protection of prescribed dams Drinking Water Catchments Regional Environmental Management Plan No 1 DIPNR (DNR) Plan aims to create healthy catchments while sustaining diverse and prosperous communities. Demonstrate in any development applications the impact on water quality will be neutral or better. New Developments Project Manager DRINKING WATER CATCHMENTS REGIONAL ENVIRONMENTAL PLAN NO 1 Approvals to mine – impacts o Environmentally Hazardous Chemicals Act 1985 (NSW) DECC The EPA may make chemical control orders (CCOs) with respect to assessed chemicals or declared chemical wastes. These CCOs may regulate activities such as the manufacture processing conveying A CCO may prohibit activities in relation to environmentally hazardous chemicals or declared chemical wastes, except under the authority of a licence issued by the EPA Before the use of assessed chemicals or declared chemical wastes Safety Coordinator/ Environmental Officer. ENVIRONMENTAL LY HAZARDOUS CHEMICALS ACT 1985 Substance Management – che Not applicable to IC – nature o disposed not relevant Devise a process to track completion / compliance for each obligation. • A simple database solution was needed. manufacture, processing, conveying, buying, selling or disposal of the chemical or declared waste. Chemicals for which a CCO has been made are referred to as environmentally hazardous chemicals. by the EPA. wastes. Environmentally Hazardous Chemicals Regulation 2008 DECC This regulation sets various fees in relation to assessment of technology and prescribed activities by the EPA and in relation to licences to carry on prescribed activities and specifies the matters to be included in applications for assessment of prescribed activities. When applying for a licence under the Environmentally Hazardous Chemicals Regulation 1999 (NSW), matters as outlined in this Regulation must be included, and the fees outlined are payable. Before the use of assessed chemicals or declared chemical wastes. Safety Coordinator/ Environmental Officer. ENVIRONMENTAL LY HAZARDOUS CHEMICALS REGULATION 2008 Substance Management – use chemicals – Not relevant to IC Energy Efficiency Opportunities Act 2006, Energy Efficiency Opportunities Regulation 2006 (Commonwealth) DRET Businesses using total energy > 0.5 petajoules in a financial year must be registered with Dept Resources, Energy and Tourism. West Cliff is only site near to 0.5 petajoules. No reporting requirement until this value has been exceeded. IC Manager Environment / IC Environment Coordinator ENERGY EFFICIENCY OPPORTUNITIES ACT 2006 Greenhouse Gas emissions an Energy and Utilities Administration Act 1987 Energy and Water DWE Legislates requirement for designated users to develop energy and / or water savings action plans Savings Action Plan plus Annual status report thereafter (for years) Status reports each 12 months after plan approval Site Site and IC files Water and Electricity Use OHS Act 2000 Approvals & Protection of the Environment Operations OHS Regulation 2001 Rail Safety Act 2000 CMHS Act 2002 CMHS Regulation 2006 Environmental Planning & Assessment Act National Greenhouse & Energy Reporting OHS Act 2000 Approvals & Protection of the Environment Operations OHS Regulation 2001 Rail Safety Act 2000 CMHS Act 2002 CMHS Regulation 2006 Environmental Planning & Assessment Act National Greenhouse & Energy Reporting Licences Environment Operations Act 1997 Assessment Act 1979 & Energy Reporting Act 2007Licences Environment Operations Act 1997 Assessment Act 1979 & Energy Reporting Act 2007
  4. 4. Understanding our Legal obligations A f h di h E E lAs part of the discovery phase Environment Essentials was engaged to provide on-line access to Environmental Legislation: Protection of the Environment (Operations) Act, Waste Regulation, Water M Ri & F h N i W d N i l P k & WildlifManagement, Rivers & Foreshores, Noxious Weeds, National Parks & Wildlife, Pesticides, Contaminated Land Management, Environmental Planning and Assessment, Mine subsidence, Native Vegetation The service has now evolved to provide ongoing; • Access to OHS & MiningAccess to OHS & Mining legislation • Legislation change notification • Updates to our Plain Englishp g Obligations.
  5. 5. • Environment Essentials were engaged to help create plain English summaries Developing our HSEC Obligation system Environment Essentials were engaged to help create plain English summaries of Illawarra Coal’s - Licences, Consent Conditions, Approvals, Commitments • Each specific obligation was assigned to position holders. • But then we needed a database to manage the obligations…..
  6. 6. Creating an HSEC Legal Compliance Register Ti ki D d d id h l l• Tickit on Demand was engaged to provide the legal compliance database • The database records a summary of obligations for ownersy g and their actions to comply. • Database features includes: a logon and results dashboard for each obligationa logon and results dashboard for each obligation owner to understand compliance they manage. Routine reports of compliance status E il ifi i i h iEmail notifications prompting owners to assess their obligations on a predetermined frequency Easy configurable and scheduled reportsy g p Rolled up reports for Directors & Officers .
  7. 7. Individual Obligation Owner Logon page
  8. 8. Reporting Function Summary of IC Plain English Obligations managed in Tickit on Demand: Health &Safety = 235 obligations 1380 instances Environment = 480 obligations 738 instances Env / community obligations allocated to sitesEnv / community obligations allocated to sites Appin 84 DEN 111 WC CPP 87 W/C 48 PKCT 78 R&E 73
  9. 9. IC f d i l id h ld ll d Learnings • IC found no single provider that could serve all needs. • The project took 2 years to design and implement. • The Project combined the capabilities of two unique systemj p q y providers who had not previously worked together. • Both companies worked with Illawarra Coal to modify their systems and services to meet our requirementssystems and services to meet our requirements. • Tickit Systems modified their database and reporting functions as they had not previously tracked legal obligations. E i E i l d d h i i• Environment Essentials expanded their services to capture mining law and provide summaries of IC licences and consent agreements.g
  10. 10. • Illawarra Coal has created a HSEC legal Compliance System • Personnel are able to understand their Legal Obligations. • User-friendly and time efficient – Environment Essential hyperlinks to legislation reside in the Tickit database. • Simple means of handover of responsibilities when incumbentsSimple means of handover of responsibilities when incumbents change. • A simple means to respond to changes in legislation. Di t & Offi h i l f it i d• Directors & Officers have a simple means of monitoring and checking on HSEC Compliance in the business. • External auditors and other operators have recognised the advantages of the system, which is transferable. • The system can be replicated!