Earned Value Management FundamentalsEarned Value ManagementDuration: 1 DayPrerequisites: A basic understating of project m...
Upcoming SlideShare
Loading in …5
×

Earned Value Management Fundamentals Training

1,056 views

Published on

Earned Value Management Fundamentals Training

Whether you’re a program manager, control account manager, an analyst or tool specialist, this training will provide you with an invaluable education in the field of earned value management (EVM).

https://tensix.com

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,056
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Earned Value Management Fundamentals Training

  1. 1. Earned Value Management FundamentalsEarned Value ManagementDuration: 1 DayPrerequisites: A basic understating of project management techniques and principles, with someexperience as part of a project team is recommended.Whether you’re a program manager, control account manager, an analyst or tool specialist, this trainingwill provide you with an invaluable education in the field of earned value management (EVM). This classoffers an introduction to the world of EVM, how and why it was created and why it has become sorelevant to project performance measurement in industry today. Attendees will learn the principals andlanguage of earned value management as well as the technical aspects of EVM data and how it iscalculated. Typical EVM Systems and processes are also covered to provide a context for how earnedvalue is set up and managed through each reporting cycle. Attendees will also learn about data analysisand how to read and interpret standard reports.In short, this class covers all the basics your team will need to operate effectively within an earned valueproject management system.Training Contents• Introduction to Earned Value, history and purpose• Earned Value Concepts• The ANSI 748 Criteria• Earned Value Team Roles and Responsibilities• Organization• Planning, Scheduling and Budgeting• Accounting Considerations• Analysis and Management Reports• Revisions and Maintenance• Common Technology• Earned Value Processes• Typical Earned Value Systems• The periodic update cycle for earned value systems• Best Practices for WBS, OBS and other structures• Control Accounts, Work Packages and Planning Packages• The Performance Measurement Baseline• Selecting the Optimum Earned Value Technique for a work package• Common pitfalls and things to avoid• The Earned Value System Implementation time-line• Preparing for a Integrated Baseline Review (IBR)• Understanding, analyzing and interpreting Contract Performance Reports (CPRs) Ten Six Consulting LLC | T: (703) 910-2600 F: (866) 780-8996 | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451  

×