Town Lake
1. Moving Tempe Town Lake’s Water
Red line:
Two 7,000 gpm
pumps will move
water into the
Indian Bend Pump
Ditch and then
into the SRP
Grand Canal
Tempe will receive
water exchange
credits
www.tempe.gov/damreplacement
2. Adding Water to Town Lake
Blue Line:
We will refill Town
Lake from SRP’s
Crosscut Canal
Water will flow in
at 100-200 acre-
feet per day
It will take about 2-
3 weeks to refill
Town Lake
www.tempe.gov/damreplacement