NEWS
Mid-2009
Donnelly Design selected to design graphics for new San Ysidro Land Port of Entry.
Architects - Ross Drulis Cusenbery.
Don...
San Ysidro Land Port of Entry (continued)

The project includes new inspection areas, administration building, pedestrian ...
San Ysidro Land Port of Entry (continued)

Also included is an expansion of northbound inspection facilities to 29 lanes, ...
Donnelly Design chosen to design graphics for Sacramento International Airport
Terminal Expansion Project.
Architects: Cor...
Sacramento International Airport - Terminal B Expansion Project (continued)

A new 19 gate, freestanding concourse buildin...
T.DIR.25
                                       Level 1 Freestanding Directional Sign



                                 ...
Recent Installations!
Cisco Wayfinding Sign Program
Architect: Gensler

Following up on the success of the design and implementation of Cisco’s ...
Cisco Wayfinding Sign Program (continued)
Tustin Library
Architect: Field Paoli

Donnelly Design worked with Field Paoli on the new 31,500 square foot Tustin Librar...
Tustin Library (continued)
George Sim Community Center
Architect: Field Paoli

Donnelly Design work as part of a design-build team with Field Paoli a...
San Bernardino International Airport
Architect: TranSystems, GKK Works

Donnelly Design designed the brand and comprehensi...
San Bernardino International Airport (continued)
El Cerrito City Hall
Architect: BSA Architects

Donnelly Design designed the sign program for the new city hall in El Cerr...
Elk Grove Library
Architect: Group 4 Architecture

Donnelly Design designed the sign program for the new public library in...
Tom Donnelly

707 374-2334

tom@donnellydesign.com

www.donnellydesign.com
Upcoming SlideShare
Loading in …5
×

DD News Slide Show

904 views

Published on

News from Donnelly Design

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
904
On SlideShare
0
From Embeds
0
Number of Embeds
7
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

DD News Slide Show

  1. 1. NEWS Mid-2009
  2. 2. Donnelly Design selected to design graphics for new San Ysidro Land Port of Entry. Architects - Ross Drulis Cusenbery. Donnelly Design was selected to design the sign program for the new border crossing station between San Diego and Tijuana. San Ysidro is the busiest land port in the hemisphere, processing an average of 50,000 vehicles and 25,000 pedestrians northbound each day. This project includes demolition and new construction for most of the facilities in the port in three major phases.
  3. 3. San Ysidro Land Port of Entry (continued) The project includes new inspection areas, administration building, pedestrian building, pedestrian bridges and other support structures.
  4. 4. San Ysidro Land Port of Entry (continued) Also included is an expansion of northbound inspection facilities to 29 lanes, and a new southbound roadway rerouting Interstate 5 to connect with Mexico’s El Chaparral facility.
  5. 5. Donnelly Design chosen to design graphics for Sacramento International Airport Terminal Expansion Project. Architects: Corgan Associates, Fentress Donnelly Design was selected to design the sign program for the new $ 1.3 billion Terminal B Expansion Project at Sacramento International Airport. Our scope includes designing systems of signs for the roadway system, 2 terminals, parking facilities and ancillary buildings.
  6. 6. Sacramento International Airport - Terminal B Expansion Project (continued) A new 19 gate, freestanding concourse building, accessed from the main terminal via automated people mover, is a major part of the new terminal project. This building includes a Customs and Border Protection facility, providing Sacramento International Airport with significantly expanded facilities for their growing international passenger volume.
  7. 7. T.DIR.25 Level 1 Freestanding Directional Sign Sacramento International Airport Design Workshop 15 - Signage Renderings Sacramento International Airport - Terminal B Expansion Project (continued) 4/03/09 Illuminated directional signs include internal LED lighting and recyclable materials, in keeping with the projects green building goals, and reducing maintenance costs.
  8. 8. Recent Installations!
  9. 9. Cisco Wayfinding Sign Program Architect: Gensler Following up on the success of the design and implementation of Cisco’s Global Sign Standards as part of their Rebranding, Donnelly Design was asked to design, document and assist with the implementation of a new wayfinding sign standard. This design provides wayfinding from building lobbies, to primary destinations for meetings and collaborations, and is part of an overall design initiative for supporting Cisco’s dynamic and increasingly mobile workforce.
  10. 10. Cisco Wayfinding Sign Program (continued)
  11. 11. Tustin Library Architect: Field Paoli Donnelly Design worked with Field Paoli on the new 31,500 square foot Tustin Library that is part of their community center complex. This library features extensive Children’s and Teen areas, along with enclosed outdoor reading patios, and opened in early August.
  12. 12. Tustin Library (continued)
  13. 13. George Sim Community Center Architect: Field Paoli Donnelly Design work as part of a design-build team with Field Paoli and Brown Construction on this expansion of the George Sim Community Center in south Sacramento. The refurbished center includes a new gymnasium and designated spaces for youth and seniors, an arts and crafts room, computer lab and fitness center. the project has been submitted for LEED Silver certification.
  14. 14. San Bernardino International Airport Architect: TranSystems, GKK Works Donnelly Design designed the brand and comprehensive sign system for this conversion of the former Norton Air Force Base into San Bernardino International Airport. Our scope includes off-site directional signs, roadway signs and site monument/water features, parking area graphics and a terminal sign program.
  15. 15. San Bernardino International Airport (continued)
  16. 16. El Cerrito City Hall Architect: BSA Architects Donnelly Design designed the sign program for the new city hall in El Cerrito, California.
  17. 17. Elk Grove Library Architect: Group 4 Architecture Donnelly Design designed the sign program for the new public library in Elk Grove, California. This project was a remodel of an existing commercial building, and was certified LEED Silver.
  18. 18. Tom Donnelly 707 374-2334 tom@donnellydesign.com www.donnellydesign.com

×