Introduction to lean and agile
Upcoming SlideShare
Loading in...5
×
 

Introduction to lean and agile

on

  • 806 views

 

Statistics

Views

Total Views
806
Slideshare-icon Views on SlideShare
806
Embed Views
0

Actions

Likes
1
Downloads
22
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Introduction to lean and agile Introduction to lean and agile Presentation Transcript

    • Introduction to Lean and Agile Software Development©2008 Protegra Inc. All rights reserved.
    • Agenda• What is the problem?• What is Agile? - Agile Manifesto - Agile Principles• Agile Methodologies• Agile Software Development Standards - Iteration Planning and Estimating - Key Meetings - Role of Project Management - Role of Requirements Management - Tools to assist Project and Requirements Management - Role of Software Development - Role of Testing• Is it Working?• Customize the Process• FAQ/Q&A ©2009 Protegra Inc. All rights reserved.
    • What is the problem?• Standish Group – CHAOS Study of IT project success605040 Succeeded30 Challenged20 Failed10 0 1994 1996 1998 2000 2002 2004 ©2009 Protegra Inc. All rights reserved.
    • What is the problem? Cost overruns+ Schedule overruns+ Failed or Cancelled projects+ Rigid processes+ Change Management (that acts like Change Restriction)+ Late Learning process+ Building the wrong thing= Lack of Trust in IT ©2009 Protegra Inc. All rights reserved.
    • Agile Manifesto Snowbird ski resort - Feb 2001 We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value:Individuals and interactions over processes and toolsWorking software over comprehensive documentation Customer collaboration over contract negotiation Responding to change over following a plan That is, while there is value in the items on the right, we value the items on the left more. Reference: http://www.agilemanifesto.org ©2009 Protegra Inc. All rights reserved.
    • Agile Manifesto: 12 Principles 1. Satisfy the customer through early and continuous delivery - Shorten the distance between requirements gathering and customer feedback 2. Welcome changing requirements, even late in development - Shorten the distance between conceiving and implementing an important change 3. Deliver working software frequently - Shorten the distance between system-as-desired and system-as- built 4. Business people and developers work together daily - Shorten the distance (time) between a question and its answerReference: Agile in a Flash. Retrieved Sept 2009 from http://agileinaflash.blogspot.com/2009/08/12-principles-for-agile-software.html ©2009 Protegra Inc. All rights reserved.
    • Agile Manifesto: 12 Principles 4. Build projects around motivated individuals - Shorten the distance between intent and action, issue & resolution 5. Convey information via face-to-face information - Shorten the distance (space) between a question and its answerReference: Agile in a Flash. Retrieved Sept 2009 from http://agileinaflash.blogspot.com/2009/08/12-principles-for-agile-software.html ©2009 Protegra Inc. All rights reserved.
    • Agile Manifesto: 12 Principles 7. Working software is the primary measure of progress - Shorten the distance between thinking we‟re done and knowing we‟re done 8. Maintain a constant pace indefinitely - Shorten the distance between the amount of unproductive time spent building software and a satisfying work day 9. Give continuous attention to technical excellence - Shorten the distance between implementation and idealReference: Agile in a Flash. Retrieved Sept 2009 from http://agileinaflash.blogspot.com/2009/08/12-principles-for-agile-software.html ©2009 Protegra Inc. All rights reserved.
    • Agile Manifesto: 12 Principles 10. Simplify: maximize the amount of work not done - Shorten the distance between comprehension and completion 11. Teams self-organize - Shorten the distance between need and action 12. Teams retrospect and tune their behaviour - Shorten the distance between introspection and adaptationReference: Agile in a Flash. Retrieved Sept 2009 from http://agileinaflash.blogspot.com/2009/08/12-principles-for-agile-software.html ©2009 Protegra Inc. All rights reserved.
    • Agile Methodologies • Scrum - founded by Ken Schwaber & Jeff Sutherland • Extreme Programming (XP) - founded by Kent Beck, Ward Cunningham, Ron Jeffries • Crystal - founded by Alistair Cockburn • Lean Software Development - founded by Tom & Mary Poppendieck • Others… - FDD - DSDMReference: Agile in a Flash. Retrieved Sept 2009 from http://agileinaflash.blogspot.com/2009/08/12-principles-for-agile-software.html ©2009 Protegra Inc. All rights reserved.
    • Top Three Methodologies• Lets look at the characteristics of the top three Agile Methodologies - Scrum - Extreme Programming - Lean Software Development ©2009 Protegra Inc. All rights reserved. 11
    • Scrum• Scrum is a process skeleton that includes a set of practices and predefined roles. - Pigs - Chickens• The main roles in Scrum are the ScrumMaster who maintains the processes and works similarly to a project manager, the Product Owner who represents the stakeholders, and the Team which includes the developers. ©2009 Protegra Inc. All rights reserved.
    • Scrum• During each sprint, a 15-30 day period, the team creates an increment of usable software.• The set of user stories that go into a sprint come from the product backlog, which is a prioritized set of high level requirements of work to be done.• Which backlog user stories go into the sprint is determined during the sprint planning meeting.• During a sprint, no one is able to change the sprint backlog, which means that the requirements are frozen for that sprint. After a sprint is completed, the team demonstrates the use of the software. ©2009 Protegra Inc. All rights reserved. 13
    • Scrum• Scrum enables the creation of self-organizing teams by encouraging co-location of all team members, and verbal communication across all team members and disciplines that are involved in the project.• A key principle of Scrum is its recognition that during a project the customers can change their minds about what they want and need (often called requirements churn), and that unpredicted challenges cannot be easily addressed in a traditional predictive or planned manner. ©2009 Protegra Inc. All rights reserved.
    • Extreme Programming• A discipline of software development that follows a specific structure that is designed to simplify and expedite the process of developing new software. Kent Beck developed Extreme Programming to be used with small teams of developers who need to develop software quickly in an environment of rapidly-changing requirements. - Interesting note: Kent Beck‟s first book proposed a rigid form of XP. This has since been changed and the result is a more Agile XP.  ©2009 Protegra Inc. All rights reserved.
    • Extreme Programming• Extreme Programming is based on 12 principles: - The Planning Process -- The desired features of the software, which are communicated by the customer, are combined with cost estimates provided by the programmers to determine what the most important factors of the software are. - Small Releases -- The software is developed in small stages that are updated frequently, typically every two weeks. - Metaphor -- All members on an XP team use common names and descriptions to guide development and communicate. - Simple Design -- The software should include only the code that is necessary to achieve the desired results. - Testing -- Programmers design the tests first and then write the software to fulfill the requirements of the test. The customer also provides tests at each stage to ensure the desired results are achieved. ©2009 Protegra Inc. All rights reserved.
    • Extreme Programming - Refactoring -- XP programmers improve the design of the software through every stage of development instead of waiting until the end of the development and going back to correct flaws. - Pair Programming -- All code is written by a pair of programmers working at the same machine. - Collective Ownership -- Every line of code belongs to every programmer working on the project, so there are no issues of proprietary authorship to slow the project down - Continuous Integration -- The XP team integrates and builds the software system multiple times per day to keep all the programmers at the same stage of the development process at once. - 40-Hour Week -- The XP team does not work excessive overtime to ensure that the team remains well-rested, alert and effective. - On-Site Customer -- The XP project is directed by the customer who is available all the time to answer questions, set priorities and determine requirements of the project. - Coding Standard -- The programmers all write code in the same way. This allows them to work in pairs and to share ownership of the code. ©2009 Protegra Inc. All rights reserved.
    • Extreme Programming TechnicalPractices• Extreme Programming is essentially Scrum with additional Technical Practices - keep it simple and never add functionality early (YAGNI, Last Responsible Moment), - choose a system metaphor (Domain-Driven Design), - use CRC cards, - create a spike solution (proof of concept), - create acceptance tests, - establish coding standards, ©2009 Protegra Inc. All rights reserved. 18
    • Extreme Programming TechnicalPractices - code the unit test first and ensure that all code has and passes all unit tests (Test-Driven Development), - program in pairs, - integrate sequentially and often, - own the code collectively, - measure and optimize last, and - create tests to detect bugs. ©2009 Protegra Inc. All rights reserved. 19
    • Lean Software Development• Lean Software Development is the application of lean principles to the craft of software development. So what is Lean? According to the National Institute of Standards and Technology Manufacturing Extensions Partnership’s Lean Network, Lean is: - “A systematic approach to identifying and eliminating waste through continuous improvement, flowing the product at the pull of the customer in pursuit of perfection.” [1] - “Lean Software Development reduces defects and cycle times while delivering a steady stream of incremental business value.” [2] ©2009 Protegra Inc. All rights reserved.
    • Lean Software Development• Lean Software development is a style of software development that emphasizes customer satisfaction through continuous delivery of functional software. In contrast to traditional software development methods, lean developers liaise continuously with business clients.• Their objective is to deliver working software as frequently as every two weeks during a project, and welcome changes to the requirements in response to evolving business needs. ©2009 Protegra Inc. All rights reserved.
    • Lean Software Development• The most crucial aspect of Lean LifeCycle is the execution of the project in iterations and quick feedback loops possible because of these iterations. It is essential to note that these iterations to not just apply to construction, they also apply to the following tasks: - Project Management and Planning - Analysis - Technical Design - Testing - Deployment ©2009 Protegra Inc. All rights reserved. 22
    • Lean Principles 1. Eliminate Waste The three biggest wastes in software development are: a) Extra Features b) Churn Client received: c) Crossing Boundaries Client needed:Reference: Lean Software Development Principles. Retrieved Sept 2009 from http://www.poppendieck.com ©2009 Protegra Inc. All rights reserved.
    • Lean Principles 2. Create Knowledge Planning is useful. Learning is essential a) Use the Scientific Method b) Standards exist to be Challenged and Improved c) Predictable performance is Driven by FeedbackReference: Lean Software Development Principles. Retrieved Sept 2009 from http://www.poppendieck.com ©2009 Protegra Inc. All rights reserved.
    • Lean Principles 3. Build Quality In If you routinely find defects in your verification process, your process is defective. a) Mistake-Proof Code with Test-Driven Development b) Stop Building Legacy Code c) The Big Bang is ObsoleteReference: Lean Software Development Principles. Retrieved Sept 2009 from http://www.poppendieck.com ©2009 Protegra Inc. All rights reserved.
    • Lean Principles 4. Defer Commitment Abolish the idea that it is a good idea to start development with a complete specification. a) Break Dependencies b) Maintain Options c) Schedule Irreversible Decisions at the Last Responsible MomentReference: Lean Software Development Principles. Retrieved Sept 2009 from http://www.poppendieck.com ©2009 Protegra Inc. All rights reserved.
    • Lean Principles 5. Deliver Fast Lists and queues are buffers between organizations that simply slow things down. a) Rapid Delivery, High Quality, and Low Cost are Fully Compatible b) Queuing Theory applies to Development, not just Servers c) Limit Work to CapacityReference: Lean Software Development Principles. Retrieved Sept 2009 from http://www.poppendieck.com ©2009 Protegra Inc. All rights reserved.
    • Lean Principles 6. Respect People Engaged, thinking people provide the most sustainable competitive advantage. a) Teams Thrive on Pride, Commitment, Trust, Applause b) Provide Effective Leadership c) Respect PartnersReference: Lean Software Development Principles. Retrieved Sept 2009 from http://www.poppendieck.com ©2009 Protegra Inc. All rights reserved.
    • Lean Principles 7. Improve the System Brilliant products emerge from a unique combination of opportunity and technology. a) Focus on the Entire Value Stream b) Deliver a Complete Product c) Measure UPReference: Lean Software Development Principles. Retrieved Sept 2009 from http://www.poppendieck.com ©2009 Protegra Inc. All rights reserved.
    • Agile Software Development Standards• The following roles and activities are done in a standard way in all Agile Methodologies: - Iteration Planning and Estimating - Key Meetings - Role of Project Management - Role of Requirements Management - Tools to assist Project and Requirements Management - Role of Software Development - Role of Testing ©2009 Protegra Inc. All rights reserved. 30
    • Iteration Planning and Estimating• Iteration planning is ‘the’ key planning initiative. Iterations need to be planned in conjunction with the client to accomplish the following: • Deliver functionality to define the pace of the project • Deliver functionality to deliver value to the client • Deliver functionality to reduce and minimize risk for the entire project • Lessons learned from one iteration must feed into subsequent iterations so that we don‟t execute the project in iterations with similar results, but that we execute the project in iterations with better results. ©2009 Protegra Inc. All rights reserved.
    • Initial Planning and Estimating• Initial Planning and estimating needs to be done - Need detailed deliverable or task levels estimates - Resource planning - Milestone based - Sometimes even a WBS structure based on project reporting requirements• This should be required for Agile or Lean projects.• Agile or Lean should not be an open cheque where estimates and milestones are not planned and approved up front - Some proponents promote that agile estimates should only be given after team „Velocity‟ is determined ©2009 Protegra Inc. All rights reserved. 32
    • What is this ‘Team Velocity’ I hear about?• Team Velocity is the sustainable pace that the team can do work - This will change based upon the project and team composition• Velocity should not replace detailed estimating and Project Planning - Detailed Estimating and Project Planning are to plan the project - Velocity measurement and refinement are used to manage an executing project - BOTH are required for a successful project. ©2009 Protegra Inc. All rights reserved. 33
    • Estimation Levels• Estimating should be done at multiple levels to gain confidence and increase estimate reliability• There are 5 levels of estimating - Task Level - Deliverable Level - Schedule Level - Monte Carlo Simulation - Planning Poker Sessions (Wide Band Delphi) ©2009 Protegra Inc. All rights reserved. 34
    • What is this ‘Planning Poker ’ I hear about?• Planning Poker is a process whereby the entire team estimate objects using card decks.• Planning Poker sessions should be held for each iteration.• A baseline is first established estimating an item that there is high estimating confidence in. (i.e. a simple CRUD screen) - Subsequent items are then estimated in increments of that first baseline. (i.e. This screen would take the effort of 3 base screens to develop) - Everyone chooses a card and then flips it over the same time. - The team then discusses the difference in opinions why people estimated differently. The team then has to come to consensus on the estimate to be used. - While time consuming, it addresses one of the main issues for project success. Proper estimating. • Planning Poker enables the sharing of estimating expertise and knowledge ©2009 Protegra Inc. All rights reserved. 35
    • Key Meetings• The following key meetings are required: - Project Kick off - Iteration kick off - Daily scrums or huddles • What did you do yesterday • What are you doing today • What issues do you have • 2 minute limit per person - Iteration Retrospectives - Iteration Planning and Estimating ©2009 Protegra Inc. All rights reserved. 36
    • Role of Project Management• Iteration Planning• Issue Management• Risk Management• Change Management is required even more - Different focus. The focus is how I can get the client the MOST functionality by following the Change Management process. May involve: • Trading requirements • Eliminating Requirements • Change Requests for new budget or schedule if required• Sometimes the perception exists that Agile or Lean projects do not require the same level of Change Management. This is an incorrect perception. - Sometimes Iterative projects actually have less Change Management than water fall projects. - Projects that are doing less Change Management than required are not „being lean‟, they are being misguided. ©2009 Protegra Inc. All rights reserved. 37
    • Role of Project Management• Increased communication and visibility - Visual Project Management - Visual Project Dashboards - Visual Status Reporting ©2009 Protegra Inc. All rights reserved. 38
    • Requirements Management• Business Analysts are the liaison to the business needs and desires.• Requirements Management and traceability is even more important for agile projects as there is the possibility of increased change• This makes the role of business and systems analysis critical to the success of the projects• The focus is on the ‘right’ amount of documentation.• Sometimes the perception exists that Agile or Lean projects do not document requirements. This is an incorrect perception. - Projects should define what the appropriate level of documentation is on a case by case basis. (within required guidelines) - Projects that are doing less documentation than required are not „being lean‟, they are being misguided. ©2009 Protegra Inc. All rights reserved. 39
    • Requirements Management• Requirements must be Test Case Driven. - Instead of descriptions as to what the software needs to do, the requirements should first list what test cases will ensure the software is operating correctly. - This should be the first section in every specification or use case - This will then feed into automated test cases and be a living document that will define the software - There is less ambiguity in test cases than textual descriptions ©2009 Protegra Inc. All rights reserved. 40
    • Tools to assist Project and Requirements Management• Many free or affordable tools are available to assist Agile or Lean Projects. - www.rallydev.com - www.targetprocess.com - www.versionone.com - www.thoughtworks.com/mingle• This is due to the fact that MS Project is an ok project planning tool, but not a great tool to manage a project while it is executing. (especially Agile or Lean Projects) ©2009 Protegra Inc. All rights reserved. 41
    • Role of Software Development• The following are important aspects of software development in an Agile or Lean Project: - Team-Based Design - Resources are multi-disciplined - Pull system for task assignment - Iterative Development • Each development should be able to be implemented in Production. If not, it is not Iterative Development. - Automated Unit Testing • NUnit/Junit - Continuous Builds/Continuous Build Servers ©2009 Protegra Inc. All rights reserved. 42
    • Role of Testing• Testing is a critical component in Agile or Lean project. (like all Waterfall Projects)• The Test Phase should be planned very diligently and in a very detailed manner. - Resist the urge to have the iterations tested in an unstructured way. This only delays the discovery of defects. - A Test Charter, Test Strategy, and Test Plans are all required. - Automated System Integration Tests and User Acceptance Tests are mandatory• Continuous Integration is mandatory. This is distinct from Continuous builds. - Continuous builds are the daily builds and execution of unit test cases to ensure ongoing development has not introduced new development issues - Continuous integrations are the daily builds and execution of regression test cases to ensure no major application functionality issues exist. ©2009 Protegra Inc. All rights reserved. 43
    • Is it working? Dr. Dobb‟s Journal – Agile Adoption Survey in 2008 • Effectiveness of agile software development compared with traditional approaches: Cost of System Development Business Stakeholder Satisfaction Higher No Change Quality Lower Productivity 0% 20% 40% 60% 80% 100%Reference: Dr. Dobb‟s Journal 2008 Agile Adoption Survey. Retrieved from http://www.ambysoft.com/surveys/agileFebruary2008.html ©2009 Protegra Inc. All rights reserved.
    • Customize the process• The most important advice I could provide is to not take any of these methodologies as correct.• Instead I would encourage you to read about the different methodologies and evaluate which components make sense for your company and for the particular project in question. ©2009 Protegra Inc. All rights reserved. 45
    • FAQ Q. Silver Bullet? A. No Q. Cowboy Coding? A. No Q. How much documentation? A. Only what adds value Q. Isn’t this just a blank cheque with no controls? A. No – disciplined approach Q. How do you deal with constant change to the code? A. Technical Excellence. TDD, SOLID Q. How do you estimate up front? A. Same as waterfall, but at a higher level ©2009 Protegra Inc. All rights reserved.
    • FAQ Q. Is there a place for analysts? A. Yes Q. Isn’t Agile unpredictable? A. Final outcome is not predictable, but value is Q. Is this just mini-waterfall in phases? A. No. The team performs all tasks in one day in parallel, not in sequence Q. What project sizes is this appropriate for? A. Survey says…. all sizes Q. Is this for Greenfield projects only? A. No. Q. Can I use Agile practices on waterfall projects? A. Yes. Example: Once requirements & design are complete, execute the development in iterations ©2009 Protegra Inc. All rights reserved.
    • FAQQ. Where to start? A. - Pick/Customize a methodology - Learn it • Read, listen, research, ask questions • Talk to someone who has done it - Try it • It won‟t likely be smooth on your first try • Don‟t ignore practices without understanding the why - Learn a few more methodologies - Incorporate your learning into a hybrid that works for your company, your teams, your projects ©2009 Protegra Inc. All rights reserved.
    • Further Reading• Books - Lean Software Development. Tom and Mary Poppendieck (2003) - User Stories Applied. Mike Cohn (2004) - The Art of Agile Development. James Shore and Shane Warden (2008) - The Art of Lean Software Development. Curt Hibbs, Steve Jewett, Mike Sullivan (2009)• Sites - www.poppendieck.com - www.leanprimer.com - www.agilemanifesto.org• Podcast Sites - http://www.hanselminutes.com/ - http://blog.agiletoolkit.com/• Newsgroups - leanagile@yahoogroups.com• Other links to articles, blogs, videos - www.martinfowler.com/articles/newMethodology.html - http://agileinaflash.blogspot.com/2009/08/12-principles-for-agile-software.html - www.infoq.com/Agile2009 (Videos from Agile 2009) - http://www.netobjectives.com/files/BusinessCaseForAgility.pdf (requires account registration) - http://groups.google.com/group/agile-developer-skills/web/draft-summary-of-chicago-meeting?hl=en&pli=1 - http://www.agilemanifesto.org/history.html - History of the Manifesto - http://www.devx.com/architect/Article/32836/0/page/4 - comparison of seven popular agile methodologies ©2009 Protegra Inc. All rights reserved.